Maintenance and Protection of Traffic (MPT) – HDM Ch 16.

Slides:



Advertisements
Similar presentations
ADA Requirements Well-designed sidewalks meet ADA requirements:
Advertisements

1 ODOTs Complete Streets Initiative. 2 Tipping Point for Complete Streets.
Complete Street Analysis of a Road Diet Orange Grove Boulevard Pasadena, CA Aaron Elias Engineering Associate Kittelson & Associates Bill Cisco Senior.
Gerald L. Ullman, Ph.D., P.E. Texas Transportation Institute Designing and Maintaining a Pedestrian-Friendly Work Zone.
PEDESTRIANS Osama Tabash Khaled El-Yazory Dr. Essam Almasri
Statewide Traffic Engineers Meeting Rumble Strip(e) June 16, 2011 Simone Ardoin Assistant Road Design Engineer Administrator.
Federal Highway Administration University Course on Bicycle and Pedestrian Transportation Lesson 15 Publication No. FHWA-HRT Bicycle Lanes.
SCHOOL BUS TRAFFIC CONTROL DEVICES
By: Vanessa Victor Scott Yoshida Travis Hills Lucas Sprague.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
TRAILS AS TRANSPORTATION Design & Construction Michael J. Kubek, P.E. Ohio Department of Transportation, District 12 Production Administrator.
“ Pavement markings can enhance safety since centerlines have been shown to cut crash frequency by 29% compared to roads without them ” Wisconsin Transportation.
Overview of 2009 MUTCD. Tom McDonald, PE Safety Circuit Rider Iowa LTAP.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
INTRODUCTION This chapter presents guidance on the application of geometric design criteria to facilities functionally classified as collector roads and.
Pedestrian and Bicycle Concerns About Highway Design and Operation Barb Mee, AICP City of Asheville Transportation Department
Chap 4 Cross Section Elements (pp.4-1 – 4-66 ) The following topics (pages) are covered in this lecture: Pavement (p.4-1 – 4-7) Pavement (p.4-1 – 4-7)
Florida Department of Transportation, November 2009
1 Channelization and Turn Bays. 2 Island Channelization flush, paved, and delineated with markings – or unpaved and delineated with pavement edge and.
Bicycle and Pedestrian Funding Overview NYS Bicycle and Pedestrian Advisory Council August 2, 2010 Albany, New York.
1 Starting a Project – Looking for footpaths or pushed down ROW fences Plan for your pedestrians or they will be walking through your project on the edge.
HERO UNIT Training Module Work Zone Traffic Control And Incident Management Operations.
3R Standards Resurfacing, Restoration, & Rehabilitation Ch. 7 1.
Transportation System Issues and Challenges
Lec 14, Ch.8, pp : Intersection control and warrants (objectives) Know the purpose of traffic control Know what MUTCD is and what’s in it Know what.
Introduction Transportation System Objectives : Military; Knit together the inhabitants of a territory by providing mutual access and communication; Economic.
Safety Audit Components Safety assessment for risk Management.
From Island Estates Parkway to St. Johns County Line.
Detours – Selection and Design Highways & Engineering Conference March 2, 2006.
Federal Highway Administration University Course on Bicycle and Pedestrian Transportation Shared Roadways Lesson 14 (This picture shows bicyclists not.
Ch. 4 Traffic Control NY State DMV.
Chapter 2 Notes Traffic Signs.
Regulatory Signs Must obey Prohibited.
October 9 th COMPLETE pg. 26 #2-4 Have Rules of the Road book out on desk BE PREPARED TO TAKE NOTES in 5 min.
Temporary Traffic Control Standards Update. Why? Came into this position soon after TC details became TTC standards about 1.5 years ago (2/13/2013) As.
 Cross section elements consist of the following:  1.Traffic lanes (carriage ways);  2.Shoulders;  3.Medians;  4.Curbs;  5.Side slopes.
Work Zone Traffic Control for Pedestrians and Bicyclists ATSSA Virginia Chapter Meeting April 15, 2015 Paul Kelley – VDOT Work Zone Safety.
C ONSIDERING L ARGE T RUCKS IN THE D EVELOPMENT OF T RAFFIC M ANAGEMENT P LANS Neil Boudreau, MassDOT State Traffic Engineer April 13, 2015.
1 At-Grade Intersection Design. 2 Objectives Define general intersection design objectives Describe factors that influence curb return design For a nice.
Federal Highway Administration University Course on Bicycle and Pedestrian Transportation Lesson 13 (Some of these pictures show bicyclists not wearing.
lesson 2.3 ROADWAY MARKINGS
Oregon Transportation Commission October 14, 2015 OR 99 Rogue Valley Corridor Plan.
Signs Signals and Pavement Markings
Design Criteria CTC 440. Objectives Know what “design criteria” means Determine design criteria for various types of facilities.
Road Ranger / TMC Operator Joint Training Module 101 MODULE 10 MODULE 10 Road Ranger Work Zones.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
Urban Bicycle Networks Throughout Virginia I. Introduction This multimodal investment network is the incorporation of four urban bicycle studies and plans.
ROADWAY MARKINGS A roadway marking gives a warning or direction. Roadway markings are usually lines, words, or symbols painted on the roadway. Some markings.
Construction zones and traffic control Objective Review extent of problem Identify contractor responsibilites Identify control plan components.
Edward L. Fischer P.E..  Ed, it was hard to read slides from back of room with this background.  Can I change it? Nancy Brickman.
Complete Streets Training
Chapter 5 Sharing the Road.  When following a large vehicle, stay out of its "blind spots". Position your vehicle so the driver can see it in the side.
Traffic Signs Part Two. What do these 2 signs tell you?
Complete Streets Training Module 10 – Street Elements: Design & Safety Considerations for Context-Based Solutions.
SEPARATED BIKE LANE PLANNING AND DESIGN GUIDE. Separated Bike Lane Planning and Design Guide Context Conforms to federal and state standards and guidelines:
Temporary Pedestrian Accommodations in Utility Work Zones Rebecca Klein, PE Regional Work Zone Engineer ,
Chapter 5: Sharing the Road. Large Vehicles ► When following a large vehicle, stay out of its blind spots ► Position your vehicle so the driver can see.
Maintenance and Temporary Traffic Control
Lesson Plan For Day Two Power point presentation 30 min Video– AAA- signs, signals, etc. 20 min Quiz- Signs Etc 10 min Correct 10 min H/O- Signs 10 min.
Chapter 2 Signs, Signals, and Roadway Markings Start working on the Start working on the 8 questions on page 39! 8 questions on page 39!
Indiana MUTCD: for Operations & Maintenance Issues/Solutions – Part II.
Urban Street Design Standards Overview of Project and Details
Interdisciplinary teams Existing or new roadway
Traffic Control Devices
From Channelization, Islands and Turning Roadways (p ~ p
Emily Guenther Zach Olson Laura Scott Cameron Wein
Design Criteria CTC 440.
HERO UNIT Training Module
Traffic Control Plan A plan directed to the safe and expeditious movement of traffic through construction and to the safety of the work force performing.
Rural Transit Stop Design Guidelines Prof Omer maaitah
Presentation transcript:

Maintenance and Protection of Traffic (MPT) – HDM Ch 16

Goal Safe and adequate maintenance of traffic

Issues Where is traffic going to go? Off-site detour On-site detour Staged Construction Temporary roads and ramps Temporary structure When can contractor work? Anytime? Non-peak hours? Night? What signs/markings are needed? Consistency with MUTCD

Others Do peds and bicyclists need accommodation? Are dedicated police traffic services needed? What will be sequencing of MPT? What are costs? Can capacity and LOS be maintained?

Off-Site Detours Use of state, county or local roads Detour lengths? Must improvements necessary to handle increased traffic volumes: Pavement widths and thicknesses Structures Guide Railing Signs/Signals Lateral Clearances

On-Site Detours Staged Construction (build a portion at a time) Temporary Roads and Ramps Temporary Structures Misc: Must maintain driveway access Maintain one or two lanes? Should detours be paved?

Toolbag Flaggers Pavement markings Signs Channelizing Devices (cones, tubular markers, drums, barricades) Barriers Arrow panels Lights Traffic Signals Rumble Strips

Show Overheads Must consider how phasing will impact placement of materials Cross-sections can be used as a tool

Facilities for Bikes – HDM Ch 17

Bicyclists Improvements: Grates-eliminate or use special grates RR crossing-90 degree crossings or reduce flangeway width Pavements-Eliminate irregularities TCS-Check clearance interval

Bicycle Provisions Wide Curb lanes Urban areas 14’ of usable pavt width (wider if possible) Shoulders Rural areas >= 4’ (wider if vehicle speed > 35 mph, >5% HV, obstructions, children, ped use of shoulders

Shared Lane

Bicycle Provisions Bicycle Lane (portion of roadway designated for bicyclists) Used on bicycle routes mapped by MPO’s 4’ min. width Can be conflicts Bicycle Path (bikeway physically separated from veh. Traffic) Design similar to road

Bike Lanes

Bike Lane w/ Parking

Facilities for Peds – HDM Ch 18

Pedestrians-Importance: 2000 Census: New York State--30% of residents don’t own cars Estimated pedestrian AADT-- 20 million trips As population ages, expect more pedestrian use

Pedestrians and Bicyclists By law, pedestrians and bicyclists can use unlimited access highways and streets. Low Volume Facilities-share roadway w/ vehicles High Volume Facilities-best to separate traffic streams Reduce accident potential Decrease travel time

Maintenance NYSDOT does not maintain sidewalks, bikepaths or bicycle parking facilities. Local government agency must pass a resolution agreeing to maintain these facilities before they are built (new policy?)

Assessing Needs-Land Use 1. Residential 2. Business/commercial 3. Mixed commercial/residential 4. Industrial 5. Recreational 6. Educational 7. Agricultural/Open Space

Assessing Needs-Generators 1. Major employment centers 2. Schools 3. Parks 4. Shopping Centers 5. Residential Neighborhoods 6. Medical Centers 7. Colleges and Universities 8. Bus Stops 9. Transit Stations 10. Recreation Areas

Existing Characteristics Special User Groups Trip Purpose Frequency of Use Volumes

Existing Accommodations Locations of walkways, bikeways, shoulders and worn paths Incomplete systems Existing signing Existing conditions Existing features than enhance/reduce feasibility Existing Right-of-Way

Others Local plans Accident History Existing Site Characteristics: Parking Lighting Crosswalks Signals Drainage Roadway Surface Condition

Pedestrian Facilities Sidewalks 5’ minimum (see next slide) 2% cross slope 7’ minimum near parking lanes 6’-6” vertical clearance Shoulders (if no sidewalks) Greater than or equal to 4’ Crosswalks Traffic Control Features Handicapped Accessibility Features

Ped Accommodations Not Warranted Peds prohibited by law Cost disproportionate to need Sparse Population-Absence of Need