ICEE Demonstration Project By Dr. W F Fok / Prof K P Cheung Date: Dec 7, 2009 (Mon) Time: 12:30pm Venue: 2/F Yam Pak Bldg.

Slides:



Advertisements
Similar presentations
HWg-Juno HW group is a manufacturer of IP-based sensors from Prague, Czech republic. HWg delivers remote monitoring & control solutions.
Advertisements

Parasol and GreenSwitch: Managing Datacenters Powered by Renewable Energy Íñigo Goiri, William Katsak, Kien Le, Thu D. Nguyen, and Ricardo Bianchini Department.
GE-final House of fun………... ROOF Solar power and wind powered house 4 wind intakes that transport collected wind into a wind turbine to produce electricity.
Why GW middle school should use solar panels By: Jane Schwartz.
GE-final House of fun………... ROOF Solar power and wind powered house 4 wind intakes that transport collected wind into a wind turbine to produce electricity.
How Technology will make Renewable Energy Competitive 10/17/2013
Smart Energy Campus September 16, Project Overview  Workforce Training  Solar PV  Solar Thermal  Small Scale Wind  Plug-in Hybrid Electric.
Food and Beverage Management Facility Design, Layout and Equipment.
Solar Energy Technology for Commercial Facilities John Archibald American Solar, Inc. Association of Energy Engineers Baltimore Chapter.
Team 3: Katie Plain Karla Chuljak Andrew Liacopoulos Kody G’Danitz.
Solar Power EDSGN 100 Sec. 13 Design Team 1 Kyle Feaster Alex Shivetts Kait Levin.
NETWORKED DC/AC MONITORING SOLUTION Freescale – ZigBee IoT GROUP 1.4 ALAN H HENDERSONPROJECT MANAGER BRIAN SAMUELSHARDWARE ENGINEER LAHCEN BOUHOUHARDWARE.
Renewable Energy as Priority
Confidential & Proprietary. What happens when Wind /Solar do not meet requirements? What next?
Best Practices in Energy Efficiency and Renewable Energy in Commercial Buildings EGNRET 28 January 2007.
[16469] Low Energy Building Design
Green Home By Joe Conran, Jake Hollingsworth, and Brad Greipp.
2 Direct and indirect benefits   UC Advisory Council (Majority students – advise on policies, fees, budget, space use, etc.)   Employment opportunities.
Data Centre Design. PROJECT BRIEF Develop a low energy data centre for a major computing company. Building is to be a prime example of sustainable, low.
Frankfurt (Germany), 6-9 June 2011 Agenda 1. Background 2. System Design 3. Experience 4. Future work Henrik Stomberg– Sweden – Session No 4 – Paper No.
Net-Zero Energy Classroom! Lets Design a….  Active Solar – PV (Photovoltaic) Panels convert sunlight into electricity.  Wind Power – When the wind blows,
South Australian Centre for Renewable Energy TAFE SA Regional Whyalla Campus.
LGBC-EcOrient June 5 th 2014 Prepared by: Architect Racha Itani.
Small Wind Electric Systems Wind Turbine Electrical Output – Electricity from a spinning shaft Balance of Systems – Types – Components.
Lakshmi GopiReddy Adventures in STEM Final Project: The Electric and Micro Grid.
Developing and Integrated Energy Conservation and Renewable Strategy Renewable Energy Leadership Summit June 7, 2005 Lenox, MA.
West Carleton Renewable Energy R&D Facility Robin Sinha, P.Eng Executive Director Carleton Sustainable Energy Research Centre April 8, 2011.
Utilizing Science & Technology and Innovation for Development Enabling a Smart Campus using Distributed Smart-Solar Marriott Hotel- Amman, August 12th,
Leveraging Renewable Energy in Data Centers Ricardo Bianchini on tour 2012.
Copyright 2010 – Johnson Controls, Inc. 1 A Day in the Life of a Smart Campus Clay Nesler VP, Global Energy & Sustainability Johnson Controls
Link Building PV project By: Culver Matt Labaume Natasha Narnio Guillaume Roux Arnaud Stanton Andrew Thompson Matt Troyano Joana ENS Renewable.
SDMAY11-01 Advisor: Dr. Ajjarapu Team Members: Luke Rupiper Shonda Butler Andrew Nigro Ryan Semler Chad Hand.
Monitoring Greenhouses Temperature Monitoring Example.
IDEA AND DESIGN IMPLEMENTATION AND OPERATION.
Hardware Training Product: ITMS2.
Dry Storage & Battery Charging Monitoring & Control System.
By Crystal Ng Class 607. Solar energy is energy created by the sun. There is a process of how this happens. The sun reflects on a solar panel, the solar.
SOLA R POWE R. Solar Power is generated from the PV (Photovoltaic) solar panels and delivered to the control centre. The control centre is made up of.
Welcome to the Green House A house built for Will Farrell to be energy efficient and sustainable.
Wind Turbine Project Plan (Dec08-04) ‏ Lindsay Short Nick Ries Luke Donney Dario Vazquez Chris Loots Advisor: Dr. Ajjarapu Client: Dr. Aliprantis.
Micro-Grid Monitoring and Control Equipment
ICEE Demonstration Project by Dr W T Fok / Prof K P Cheung December 7, 2009 Proposals on location of the demo items The time line events of demo project.
50th HPC User Forum Emerging Trends in HPC September 9-11, 2013
Intelligent Home Scenario Group Name: WG1 Source: KETI, ETRI, SK Telecom, nTels, KCA, Kaonmedia Meeting Date: dd Agenda Item: Discussion.
LOGO Scope Confidential document 1. LOGO Contents Overview 1 High level scope 2 Video over IP - VP 3 Quadrocopter - FUFO 4 2 Web Interface - Web 5.
Solar Energy Ashley Valera & Edrick Moreno Period 6.
The Dominican Republic What can NSG do for You? 2014 Native Sun Group, Inc Meadowgrass Dr, Suite 101 Colorado Springs, CO Office: (719)
Page 1© 2010 Quanta Technology LLCPage 1 November 2007 BGE January 4, 2008 China’s Strong Smart Grid – An Area China Will Excel Presented at Harvard China.
Group 3 RobinCarpenterSweden JensCarpenterGermany AlexisJoiner/Cabinet MakerFrance Peter Carpenter Ireland.
Product Introduction Reported by Jerry Huang
Green College Initiative Jem Morris. Green College Initiative The College has created a ‘Green College’ group that meets at least every 8 weeks The group.
Energy Systems Integration Facility May Renewable and Efficiency Technology Integration ESIF Supports National Goals National carbon goals require.
Craig Datko Stephen Kenas Felix Aronovich Monica Esopi Project 2 EDSGN 100 Fall 2010 Group 4.
WIFI MONITORING USER GUIDE
In 2015 our congregation signed the Interfaith Power and Light Paris Pledge to reduce our carbon footprint by 50% by 2030, and aim to reduce by 100% —to.
Specification & Description
NYU Cogeneration and Microgrid John Bradley ITP Spring2016
Scene 1: Show EV cars charging in a city
To engage businesses and organisations in the opportunities offered by installing biomass, heat pumps and solar panels to generate green energy To show.
The smart school concept for smarter education
Panasonic Battery Project
Crescent City Harbor District Solar Project Proposal
Power Electronics Research at Seoul National University
NET-ZERO-ENERGY (NZE) WASTEWATER TREATMENT PLANTS (WWTPs)
Park Encinitas HOA Solar Project Proposal
Your Solution for: Energy Smart Management Real Time Power Monitoring Fuel Theft Prevention Technical presentation.
Did you know Prairie Elementary Is Becoming a Solar School?
Case Studies on Field Deployment of PV Battery Storage Systems
GREEN TECHNOLOGY NABCEP RESNET Certification.
Hesters way partnership
Presentation transcript:

ICEE Demonstration Project By Dr. W F Fok / Prof K P Cheung Date: Dec 7, 2009 (Mon) Time: 12:30pm Venue: 2/F Yam Pak Bldg

Agenda Layout of the demo room Projects to be demonstrated Renovation works involved System diagram Work schedule Discussion

Existing layout of the Yam Pak Bldg 2/F Proposed demo room area

Proposed layout of the demo room Visitor path Zone A Zone B Zone C Zone D A door should be opened between zone B and zone C Streamlined artistic partition Project 1 Project 2 Project 4 Project 7 Project 3 Project 6 Video show Project 8 Project 9Project 12 Project 11 Project 10 Project 13 Project 14 Project 5

Zoning ZoneRoom Capacity A Energy Collection 2 projects B Grid and Control 5 projects C Energy Storage and Saving 5 projects D Environment 2 projects Roof Energy Collection GE Agrobiotech projects

Project (Indoor demo) Proj.TitleIn-chargeProj.TitleIn-charge A1Solar PV Energy*Prof K Y Chan / Prof F.Liu C8Energy Storage (small scale in the indoor demo room, real scale at the roof) Prof K Y Chan A2Wind Energy*Prof D Leung / Prof M Leung C9Solid-State LightingDr Anthony Choi B3Delivering Renewable Energy in DC Microgrids Prof. FF wu/ Dr J Zhong C10Reserved for future B4Smart GridProf V Li Dr Yang C11Reserved for future B5Reserved for futureC12Reserved for future B6Reserved for futureD13Urban ventilationDr CH Liu/ Prof Yuguo Li B7Reserved for futureD14GE AgrobiotechnologyDr Wallace Lim * For energy collection: poster display and web monitoring in the demo room, real installation at the roof

At the roof Facing Chow Yei Ching Bldg Battery and Equipment room at the roof Green house Micro wind turbine N S

PV panels

The existing solar facilities will be removed except that the supporting frame can be reused. New PV panels will be installed. 10 pcs of 500W PV panels can be hosted in the existing frame. Capacity: 5kW

Covering the building service facilities

Existing building facilities will be covered by plastic grass carpet for appearance improvement and easy maintenance plastic grass carpet

Covering the building service facilities

Existing building facilities will be covered by plastic grass carpet for appearance improvement and easy maintenance

Existing solar facilities to be removed Anther solar facilities including the frame should be removed to provide space for the green house

Existing solar facilities to be removed

Greenhouse for GE agrobiotech demo

Micro wind turbine

Before

After

Battery and Equipment room at the roof Battery and Equipment Room Solar Panel Micro wind turbine

System diagram Smart Charger Internet To be shared with world via Internet In battery room at roof Sensors System CCTV Quad Mux DC/ AC Wind speed, temperature, humidity, light intensity…etc. Powering up LED and demo equipment Real-time monitoring the status at the roof Charger Status ICEE Demo Web portal In battery room at roof At roof In demo room on 2/F

Project Schedule TasksNovDecJanFebMarAprMayJunJulAug Finalize overall designxxXx Tender building worksxxXx Building worksxxXx Finalize the detailed design of each project Xx Purchase demo materials Xx Lab installation and testing xxXx Installation in the demo room Xx x Posters, display, brochures Xx Testing and dry runXxX Official launch and Opening ceremony xx

Other discussions The pamphlet for each project [ref. Wallace’s pamphlet- when? Web cam and internet display of demo items? Summer students to help, budget?