CE5504 – Surface Water Quality Modeling CE5504 Surface Water Quality Modeling Lab 3. Modeling Loads – The C/Q Approach Applied to Onondaga Lake.

Slides:



Advertisements
Similar presentations
Polynomial Inequalities in One Variable
Advertisements

Contaminants at the Estuary Interface Jon Leatherbarrow 1 Rainer Hoenicke 2 Lester McKee 1 1 San Francisco Estuary Institute 2 California Resources Agency.
Boyce/DiPrima 9th ed, Ch 2.4: Differences Between Linear and Nonlinear Equations Elementary Differential Equations and Boundary Value Problems, 9th edition,
Webquest project By Mrs. Snapp
Flood Profile Modeling with Split Flows and Weirs
H(s) x(t)y(t) 8.b Laplace Transform: Y(s)=X(s) H(s) The Laplace transform can be used in the solution of ordinary linear differential equations. Let’s.
4.1: Linearizing Data.
Conversion and Reactor Sizing
Phosphorus Loads from Streambank Erosion to Surface Waters in the Minnesota River Basin D. J. Mulla Professor, Dept. Soil, Water, Climate University of.
RICE CREEK CHAIN OF LAKES TMDL. PELTIER LAKE TOTAL PHOSPHORUS MONITORING DATA.
David O. Wallin Department of Environmental Sciences Huxley College of the Environment Western Washington University Bellingham, WA
© 2014 Carl Lund, all rights reserved A First Course on Kinetics and Reaction Engineering Class 15.
Sedimentation Lesson 1: “Dirty” Water. What will we study in this unit?  Dirt (soil) in water  Soil in the water is an important nonpoint source of.
WP12. Hindcast and scenario studies on coastal-shelf climate and ecosystem variability and change Why? (in addition to the call text) Need to relate “today’s”
Oceans 97.2% All icecaps/glaciers2.0% Groundwater0.62% Freshwater lakes0.009% Inland seas/salt lakes0.008% Atmosphere0.001% All Rivers0.0001% Total %
CE 498/698 and ERS 485 (Spring 2004) Lecture 71 Lecture 7: Computer Methods for Well-Mixed Reactors CE 498/698 and ERS 685 Principles of Water Quality.
Dr. Martin T. Auer MTU Department of Civil & Environmental Engineering ENVE5504 Surface Water Quality Modeling Lab 4. One-Dimensional Models Vertical Mass.
CE5504 – Surface Water Quality Modeling CE5504 Surface Water Quality Modeling Lab 1. Numerical Methods and Population Growth Modeling.
Dr. Martin T. Auer MTU Department of Civil & Environmental Engineering CE5504 Surface Water Quality Modeling Lab 6. One-Dimensional Models Horizontal Mass.
CE5504 – Surface Water Quality Modeling CE5504 Surface Water Quality Modeling Lab 2. Modeling Loads – The C/Q Approach Applied to Onondaga Lake W = C∙Q.
CE5504 – Surface Water Quality Modeling CE5504 Surface Water Quality Modeling Spring Semester 2011 Lab 2. Loads.
Relating Oxygen Production and Buoyancy Rates of Aphanizomenon flos-aquae to Light History in Upper Klamath Lake. Introduction Upper Klamath Lake (UKL)
Dr. Martin T. Auer MTU Department of Civil & Environmental Engineering CE5504 Surface Water Quality Modeling Lab 6. Coastal Zone Modeling: The Lake Ontario.
CE5504 – Surface Water Quality Modeling CE5504 Surface Water Quality Modeling Lab 2. Numerical Methods and Population Growth Modeling.
Dr. Martin T. Auer MTU Department of Civil & Environmental Engineering CE5504 Surface Water Quality Modeling Lab 5. One-Dimensional Models Thermal Stratification,
Numerical Integration CE5504 – Surface Water Quality Modeling  non-idealized loading functions  variable parameters  multi-segment systems  non-linear.
CE5504 – Surface Water Quality Modeling CE5504 Surface Water Quality Modeling Lab 1. Modeling 101.
Dr. Martin T. Auer MTU Department of Civil & Environmental Engineering Mass Balance, Kinetics & Reactors.
Probability Distributions Random Variables: Finite and Continuous A review MAT174, Spring 2004.
Derivation of the Gaussian plume model Distribution of pollutant concentration c in the flow field (velocity vector u ≡ u x, u y, u z ) in PBL can be generally.
CE5504 – Surface Water Quality Modeling CE5504 Surface Water Quality Modeling Lab 2. Numerical Methods and Population Growth Modeling.
WASP7 Course Boundary Conditions & Pollutant Loads.
Bell work: What is the lateral surface area of a tissue box with the dimensions shown? 4 inches 5 inches 9 inches.
UNIT 2: REVIEW TIER 5 Solve problems using the idea gas law
Water Quality Monitoring and Parameter Load Estimations in Lake Conway Point Remove Watershed and L’Anguille River Watershed Presented by: Dan DeVun, Equilibrium.
Power functions Functions of the form y = k * (x r ) where k is a non zero number and r is a positive integer are called power functions. Power functions.
Copyright © 2011 Pearson Education, Inc. Modeling Our World.
Solve Exponential and Logarithmic Inequalities. Vocabulary  An exponential inequality in one variable is an inequality that can be written in the form.
This is. Jeopardy Earth Science Water on Earth Surface Water Water Underground Using Freshwater Sources Water to Drink Capture the Chapter
1 Tips for solving Project 1 Reactor SO 3 SO 2 +O 2.
1 Dr. Jerrell T. Stracener EMIS 7370 STAT 5340 Probability and Statistics for Scientists and Engineers Department of Engineering Management, Information.
Objectives Compare linear, quadratic, and exponential models.
Section 2.3 Notes: Rate of Change and Slope. Rate of change is a ratio that compares how much one quantity changes, on average, relative to the change.
Ric Lawson Watershed Planner Huron River Watershed Council MiCorps Staff.
Integrated Rate Law. Rate laws can be converted into equations that tell us what the concentration of the reactants or products are at any time Calculus.
Stream Velocity Tutorial Start These are readings from station 1. End.
Watersheds. What is a watershed? The area of land and all the smaller bodies of water that drain to a larger body of water.
Light at a Distance Jessica, Charlie, Courtney, and Ashley.
5.6 SEDIMENTATION Objective
12/7/2015 Math SL1 - Santowski 1 Lesson 16 – Modeling with Exponential Functions Math SL - Santowski.
A Mass-Balance, Watershed-Scale Analysis of the Chemistry of Adirondack Lakes Discussion - Day 5.
Spokane River Basin Monitoring. Spokane Basin Monitoring.
LAKE D.AREA (km 2 ) NPS loadings (kg/yr) sewage (kg/yr) precipitation (kg/yr) residential (kg/yr) Pload Int (kg/yr) cleared % Moose
Chapter 5 Laplace Transform
1/20/2016 Integrated Math 10 - Santowski 1 Lesson 13 Introducing Exponential Equations Integrated Math 10 - Santowski.
Mass Balance Assessment of 2014 Synoptic Survey Results: Dave Dilks Spokane River Regional Toxics Task Force 2014 Workshop January 13,
1.5 Exponential Functions Math 150 Introduction to Calculus.
Cell#1 Program Instructions. Don’t run. Used to load a Statistical Package Cell #3 Defines standard normal pdf and cdf functions Ignore spelling warning.
Brian Haggard Director Arkansas Water Resources Center Funding provided by ANRC through Beaver Water District.
Phosphorus and Nitrogen in Three Lakes A study of the nutrient status in Lake Erken, Lake Limmaren and Lake Largen.
Definite Integrals in Physics
Examples of significant, long-term increases in baseline concentration of chloride for streams and rivers of the northeastern United States. Examples.
Graph Review Skills Needed Identify the relationship in the graph
Unit: Water and the Atmosphere
Objectives Compare linear, quadratic, and exponential models.
EQ: How can we use linear models for non linear data?
Unit 1 Notes: Graphing & Density
Tell whether the slope is positive or negative. Then find the slope.
Jasmine ,Nines and Bianca
Presentation transcript:

CE5504 – Surface Water Quality Modeling CE5504 Surface Water Quality Modeling Lab 3. Modeling Loads – The C/Q Approach Applied to Onondaga Lake

Types of Loads CE5504 – Surface Water Quality Modeling load, mass · time -1, g · d -1 point source, tributaries: Q · C, m 3 ·d -1 x g·m -3 nonpoint terrestrial source: UAL·A, g·m 2 ·d -1 x m 2 nonpoint atmospheric source: J·A, g·m 2 ·d -1 x m 2 sediment source: J·A, g·m 2 ·d -1 x m 2 What is “A” for the last 3 cases?

Steady State C, Constant Loads and, at steady state, where W is constant and quantified as shown in the previous slide.

Time Variable C, Time Variable Loads applying numerical integration, how to describe W(t) ?

Time Variable C, Idealized, Time Variable Loads then an initial concentration is calculated, and the integration proceeds with W = 0 Impulse load (spill) 0

Time Variable C, Idealized, Time Variable Loads where an initial concentration corresponding to prior conditions is specified Step load (new continuous source)

Time Variable C, Idealized, Time Variable Loads where an initial concentration corresponding to prior conditions or W base is specified Linear load

Time Variable C, Idealized, Time Variable Loads where an initial concentration corresponding to prior conditions or W e is specified Exponential load

Time Variable C, Idealized, Time Variable Loads where an initial concentration corresponding to prior conditions or W bar is specified Sinusoidal load

Time Variable C, Flow-based Loads where Q and C are measured or specified Point Source Nonpoint Source where Q(t) is measured or specified and C is determined as f (Q), the “C/Q Plot”

C/Q for TSS in Ontonagon River, Lake Superior CE5504 – Surface Water Quality Modeling linear bipartite ascending - descending

C/Q for Chloride in Nine Mile Creek, Onondaga Lake CE5504 – Surface Water Quality Modeling inverse linear plot two different historical intervals

C/Q for TSS in Onondaga Creek, Onondaga Lake CE5504 – Surface Water Quality Modeling logC plot

C/Q for Total Phosphorus in Onondaga Creek, Onondaga Lake CE5504 – Surface Water Quality Modeling log – log plot two different stations

Little loads, like those from toads, Grow bigger when from horses. And on through us, I fear they must, Foul the water courses. Ode to the Load