WP2 progress Allard de Wit, Alterra. WP2: progress Anhui Limited progress Anhui test site: Lack of human resources on Alterra side Communication with.

Slides:



Advertisements
Similar presentations
WP Operative Plan WP 4 : Functional requirements Task Responsible: Regione Piemonte.
Advertisements

Implementing CGMS in Morocco and the Huaibei/Juanghuai plains Allard de Wit & Raymond van der Wijngaart.
Work-package 6 Statistical integration Allard de Wit & Raymond van der Wijngaart.
DRSRS E-AGRI: ACTIVITIES IN Kenya 24 th March,2011 Charles Situma Nairobi, Kenya
Alterra – part of Wageningen University and Research Centre Allard de Wit.
(Multi-model crop yield estimates)
Kick-off meeting November 2008, SYKE, Helsinki, Finland Nordic Call: CARAVAN: Next steps Timothy Carter Finnish Environment Institute,
2/22/2014 E U R O P E A N F O R E S T I N S T I T U T E The general objectives of NEFIS are maximising the value of existing data and databases by: coordinating.
Correlation and Regression Analysis Many engineering design and analysis problems involve factors that are interrelated and dependent. E.g., (1) runoff.
Southern Africa Agricultural Model Intercomparison and Improvement Project (SAAMIIP)
Crop monitoring as an E-agriculture tool in developing countries (E-AGRI) Overview and Management FP7 STREP Project (GA ) Final Meeting ( )
Work Package 3 BioMA multi-model monitoring Valentina Pagani 1, Roberto Confalonieri 1, Simone Bregaglio 1, Caterina Francone 1, Giovanni Cappelli 1, Wang.
Research Plan Group 1. Research Issues: Increased usability on the new site? H1. Is faster to complete the proces on the new site. H2. The information.
Chapter 7 CASE Tools and Joint and Rapid Application Development.
Crop monitoring as an E-agriculture tool in developing countries (E-AGRI) Overview and Management FP7 STREP Project (GA ) 1 st Progress Meeting ( )
Uconn Marching Band Information Management System Status Report Harlan Broughton Stephen Link March 2, 2010.
Who does what and when? Mary Rowlatt MDR Partners.
Teaching Critical Thinking Skills within Ag Geospatial Curriculum Ag GIS Education Symposium Pismo Beach, California January 20, 2006 Terry Brase, Associate.
FP7 e-Agri meeting, January 2014, Alterra, Wageningen-UR, the Netherlands CGMS-MOROCCO STATUS El Hairech T., Balaghi R., De Witt A., Van Der Wijngaart.
Crop monitoring as an E-agriculture tool in developing countries (E-AGRI) Overview and Management FP7 STREP Project (GA ) 2 nd Progress Meeting ( )
Crop monitoring as an E-agriculture tool in developing countries (E-AGRI) FP7 STREP Project (GA )
London February, 28 European Commission Information Society and Media Annual Meeting Annual Meeting GaLA Game and Learning Alliance The European Network.
E-AGRI Work Package 3 BioMA multi-model monitoring Roberto Confalonieri 1, Simone Bregaglio 1, Caterina Francone 1, Valentina Pagani 1, Giovanni Cappelli.
CGMS Secretariat, CGMS-40, 6 November 2012 v1 Coordination Group for Meteorological Satellites - CGMS Type of actionActions at CGMS-39 ClosedComments Actions.
C R O P S T O I N D U S T R Y WP4 TaskS 4.1 & 4.2 Task leader: ICCEPT Crops2Industry “Non-food Crops-to-Industry schemes in EU27” Calliope Panoutsou &
WP3 - Proceedings Consortium Meeting, Reggio Emilia Doris Wiederwald Peter Wintersteller.
Work Package 2 Communication & Dissemination Leader: TUC.
McGraw-Hill/Irwin Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 7 CASE Tools and Joint and Rapid Application Development.
DEFINITIONS AND TYPOLOGY Work group November Ivailo /Ивайло Markoff /Марков.
ENTRANZE Policies to enforce the Transition to nearly zero energy buildings in the EU-27.
WP2 progress CGMS Anhui/Morocco Allard de Wit, Steven Hoek, Riad Balaghi, Tarik el Hairech, Bell Zhang, Jappe Franke, Hugo de Groot, Bas vanMeulebroek,
Overview of CEOS Actions in Support of GEO Work Plan Ivan Petiteville CEO ESA 1 23 rd CEOS Plenary I Phuket, Thailand I 3-5 November2009.
Progress Report Alterra ELPEN Group June – September 2000.
EGEE NA3 Status Prof. Malcolm Atkinson Director John Murison Training Manager CERN 14 th January 2004.
HFM-coll-meeting, 20 th Mar. 2013, GdR & FK, HFM-task1 1 WP7 HFM task 1 Gijs de Rijk & Francois Kircher 20 th March th EuCARD-WP7-HFM Collaboration.
CGMS Anhui & Yield estimation with RS CGMS Anhui & Yield estimation with RS.
Assessing Progress in Achieving Objective 6.1 of the EECCA Environment Strategy Roberto MARTÍN-HURTADO OECD/EAP Task Force Secretariat
Eastern Wind Integration and Transmission Study David Corbus - Project Manager Matt Schuerger (Consultant) National Wind Technology Center NREL Golden,
FCC Special Technologies WP Task 11 Radiation Hardness Assurance TASK 1 Field conditions and radiation levels at FCC TASK 2 FCC Qualification Protocols.
United Nations Statistics Division Activities carried out since the last meeting of the Expert Group.
PMT/HPD Database University of Iowa. Current Database State 2 Database Locations  MySQL omega.physics.uiowa.edu Used by web interface on Iowa‘s HEP website.
What are the factors affecting renewable energy use?
Agenda item 5 ESS Vision 2020: other activities DIGICOM and SIMSTAT DIME-ITDG joint plenary Luxembourg,
ICSEED ICSEED 14th Session, Bucharest 5-6 Nov Romania INFORMAL CONFERENCE OF SOUTH-EAST EUROPE DIRECTORS Hosted by National Meteorological Administration.
Carlo Vaccari – ITDG 2010 Luxembourg1 CORA ESSNet final results.
WP3 Biomapping status quo WP3: NRM, CDF, CEFAS, DINARA, WCS.
Welcome and apologies Minutes of last meeting
LCG 3D Distributed Deployment of Databases
CASE Tools and Joint and Rapid Application Development
APEC Collaborative IV Adoption of RE Standards in APEC Economies
Annual Report Instructions
Project progress report WP2
Task Group 4 Low Rate WPANS Opening Report
GMES In-Situ Coordination
Project Coordination Group (PCG) for the implementation of the MSFD
Fertilisers – Anne Miek Kremer
Goals and objectives of Work package 2 of the ESSnet on Consistency of concepts and applied methods of business and trade-related statistics Norbert Rainer,
CryoNet Team Meeting Aims and Expectations
Task 4 Hans Kros Alterra Workshop ‘Excretion factors’
Meeting of the European Directors of Social Statistics
Item 3 of the draft agenda ESS.VIP ADMIN: progress report
Database for water use statistics
Progress report on Dissemination G. Schäfer & B. Le Goff, Unit B6
Презентация құру тәсілдері
UNFCCC Roster of Experts
Water Science-Policy Interface (CIS-SPI) Progress report
ESS.VIP ADMIN – Status report Item 4.1 of the draft agenda
Population projections Agenda: 6.2; Document 13
Projects under Pillar I of White Paper on Climate Change Adaptation
CEOS Work Planning Steven Hosford, ESA/CNES, CEOS Executive Officer
Presentation transcript:

WP2 progress Allard de Wit, Alterra

WP2: progress Anhui Limited progress Anhui test site: Lack of human resources on Alterra side Communication with AIFER colleagues difficult Prepared and organized CGMS/WOFOST workshop at Hefei (2011/nov/02) Discussed and renewed list of tasks for Anhui CGMS setup during workshop

WP2: progress Morocco Intensive discussion on meteorologic inputs: AURELHY vs Classic CGMS Basic data sources are available INRA (Hicham Marzouki) started building CGMS together with Alterra (R. vd Wijngaart) Riad: How to get operational a.s.a.p. for March 2012 forecast

CGMS Statistical Toolbox CGMS Statistical toolbox was developed for Windows XP -> problems under Windows7 Alterra migrated CST to Windows7 recently: fully functional on MS Access database. Testing on ORACLE (yesterday) revealed some problems to be resolved.

E-AGRI deliverables: Usability reports Anhui/Morocco Inventory of available data sources and their suitability for applying CGMS Inventory made during Hefei workshop Inventory of factors explaining regional yield variability in Anhui: irrigation, fertilizer, disease, lodging (hard wind) Alterra will create questionaire in January, to be circulated with experts in Anhui/Morocco Inventory of technical constraints e.g. is ORACLE available/usable Etc.