MINERvA Module Assembly Prototyping Plan Jaewon Park University of Rochester MINERvA Collaboration Meeting, May 13-14, 2005.

Slides:



Advertisements
Similar presentations
Timber Portal Frame Construction
Advertisements

ULTIMATE PORTABLE WORKSTATION Produced by Gavin Weyrich.
Zebulun Krahn Advisor: Curtis Meyer Technician: Gary Wilkin Carnegie Mellon University Straw Tubes and Hall D December 11-13, 2003 GlueX Collaboration.
Engineering Division 1 HFT Middle Support Cylinder Eric Anderssen, LBNL.
Mech assemblymay MuTrFEE Assembly Procedure Mechanical.
PROJECT 100. PROJECT 100 DESIGNED TO BE: Cost Effective Compact Strong Simple Light Reliable.
MINERvA Module Assembly Prototyping Report Jaewon Park University of Rochester MINERvA Collaboration Meeting, July 29-30, 2005.
Photostatistics Error Jaewon Park University of Rochester MINERvA/Jupiter Group Meeting, Sep 5, 2006.
MINERvA Simulation - HCAL and ECAL Calorimetry Jaewon Park University of Rochester Jupiter/MINERvA Group Meeting, Oct 4, 2006.
Detector Alignment using cosmic muon data Jaewon Park University of Rochester MINERvA/Jupiter group Meeting, Oct 31, 2007.
Calorimetry Study Update Jaewon Park University of Rochester MINERvA/Jupiter Group Meeting, Mar 22, 2006.
Microcontroller Position Sensors 1-3 Temp Sensor M Increment Motors Manual Override Power Motor Controller System Diagram.
MINERvA Simulation - HCAL and ECAL Calorimetry Jaewon Park University of Rochester MINERvA Collaboration Meeting, Sep 29, 2006.
MINERvA Calorimetry Calibration with infinite detector Jaewon Park University of Rochester Jupiter/MINERvA Group Meeting, Nov 15, 2006.
7/28/03P. Kroon AEROGEL Assembly of Cells into 80-cell Array: –8 cells wide by 10 cells high mm high (Y) by 2077 mm wide (Z) by about 335 mm deep.
Innovation Space Manufacturing Plan.
C. Bromberg 1 Michigan State University Feb. 8, 2004 RPC Monolithic Detector l Most absorber shipped direct to the site äShipping minimized äHeavy (~20.
Grouts and Grout tests for NOVA The NOVA extrusions, when filled, will exert an average pressure of 19 psi (2736 psf) on the floor. The pressure is not.
1 Coordinate Detector: prototype design The Coordinate Detector (CDET): Three independent vertical planes with 15 cm plastic shield in front, all planes.
Furniture Construction and Selection. 1. Qualities of Hardwoods Greater dimensional stability Less pitch More durability Harder Holds nails and screws.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
Sydney Technical High School 1 Research assignment (PDF) Design folio (PDF) Student working on the Exploring and defining the task section of his draft.
SD-HCAL technological prototype – Chamber and cassette production Nick Lumb Lyon, 3 February 2011.
MINERvA Mini-Review Debbie Harris Jeff Nelson Kevin McFarland Jeff’s slides version 1.
TOP counter overview and issues K. Inami (Nagoya university) 2008/7/3-4 2 nd open meeting for proto-collaboration - Overview - Design - Performance - Prototype.
SIMPLE MACHINES NOTES, PART 2 Physical Science (8A) Coach Dave Edinger.
1 1. EMR production status 2. EMR simulations (FEA studies) 3. RAL 1. EMR production status 2. EMR simulations (FEA studies) 3. RAL Teleconf.
Physical Science Applications in Agriculture Unit Physical Science Systems.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
VLVnT11 - Erlangen 12-14/10/ Giorgio Cacopardo NEMO Phase2 mechanical design G. Cacopardo on behalf of NEMO collaboration.
Takeshi Matsuda LC TPC Collaboration March 5, 2008 TPC Endcap Materials.
D. Greenfield CLRC1 End-cap Engineering Status Report Debbie Greenfield, RAL UK-V 30 October 2002.
Off-Axis Collaboration Meeting Feb 7, 2004 Richard Talaga, Argonne (Liquid) Scintillator Structure Workshop Report Workshop Purpose –To review the current.
RFQ Subcomponents PXIE RFQ Fabrication Readiness Review LBNL – June 26, 2013 Steve Virostek - Engineering Division Lawrence Berkeley National Laboratory.
Coordinate Detector: prototype design General idea about the Coordinate Detector (CDET) so far: Three independent vertical planes with 15 cm plastic shield.
MINER A Main INjector ExpeRiment for v-A Active segmented scintillator detector: 5.87 tons Nuclear targets of C, Fe and Pb, Water, Helium.
H. Katajisto RE EDR 10/10/02 Enclosures for the RPC Link Boards Outline Introduction Periphery General Services Components, materials Manufacture, Assembly.
A2-A5: The drawing has been revised (minor changes), the bid has been approved by INFN management and the invitation letter to the companies will be sent.
Proposal for the construction procedures for the NSW chambers Harry van der Graaf, Nikhef Frascati, Nov
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/23/20102electro-mechanical.
Rude-Goldberg Project. Team Members: Britany Swann Michael Warden David Hudson.
Set Construction Essential Question:
Simple Machines Notes.
Work and Simple Machines. Work Work means to (1) apply a force to an object over a distance, and (2) the object moves in response to the force. If something.
B [OT - Mechanics & Cooling] Stefan Gruenendahl February 2, 2016 S.Grünendahl, 2016 February 2 Director's Review -- OT: Mechanics &
Side view: **Not to scale** Earth’s atmosphere bends light like a prism!
ECAL LED monitoring system upgrade status 04/09/20131.
NA 62 – straw detector Content Detector Specifications Chamber design Straw design and specifications Calculations and measurements Prototyping Plans Straw.
Thomas Gutierrez Austin Shoemaker Shane Upchurch Ryan Kaysen Joey Miller Kevin Liekweg Prototype Review Mobile Laptop Desk Week 1.
HADES collaboration meeting XXX, Lisbon, 7-10 October, 2015,
Your robot can be inexpensive
SeaPerch Structural System
SeaPerch Structural System
Simple Machines Explain how the design of simple machines (including levers, pulleys, and inclined planes) helps reduce the amount of force required.
IFR Status Summary W. Baldini on behalf of the IFR Group
Mechanics: (Tim).
Low Mass mechanical design
Section In the cross section of a tree, one year of tree growth is represented by one _____. a. cambium layer b. medullary ray c. annular ring d.
IFR detector mechanics
First of all we will remind some numbers:
Louisiana Tech University
SeaPerch Structural System
Station and Module Support Frames
Machine Learning Course.
SeaPerch Structural System
Update on HCAL and ECAL Calorimetry
Not so easy it seems… Windmill Energy.
Mapping Simulation — in concern with MA64 crosstalks
Valve stem “gag” mechanism
First prototype module released from the assembling platform
Presentation transcript:

MINERvA Module Assembly Prototyping Plan Jaewon Park University of Rochester MINERvA Collaboration Meeting, May 13-14, 2005

Detector Overview v Module Assembly Unit OD x u x v 1 Module

Mocking-up: What for? Develop assembly procedure, manipulation Possibly provides some ideas about design issues  Spacer between OD planes  H-clip (jointing ID and OD)  PMT Box support Also, Fiber routing scheme  fibers being bended  grouping to connector  Determines fiber lengths Model with light material (plywood)  Can’t consider mechanical rigidity, weight

Things to build Active-target module  1/3 full scale  1/2 scale  ¼ scale PMT box and support  1 aluminum rack for PMT boxes  Many PMT boxes

152 in. 176 in. Model Materials, Sizes Model most parts with plywood or plexiglas and glue with liquid nails Model fibers with fishing line ¼ scale (~40 in. wide) ½ scale (~ 80 in. wide) 1/3, full scale (~132 in. wide) Crane in machine shop ~100 in. door

Module Types US-HCALUS-ECAL Active-target (Narrow) Active-target (Wide) DS-ECALDS-HCAL make this module FePb OD Scint.

Fiber routing and bending 192 fibers 64 fibers Total 256 fibers for 1/3 module OD xu x u u

PMT Box and Support Model full size module for PMT box and support Support - aluminum bar with bolt jointing Fake PMT boxes – PVC pipe, hardboard, liquid nails

PMT Box Model 12’’x 4’’dia. PVC Pipe Hardwood dowel-rod Would simplify an endcap as rectangle Might need an additional supporting block to attach dowel

Timeline May 9 - May 20 (2 weeks):  Machine Shop closed due to Machine Shop moving May 12  Some major materials (Plywood, etc) will be ordered May 19  4 hr. Safety course with dept. machinist (Dept. requirement) May 23  Begin actual work 2 persons rule in machine shop  Work mostly daytime