University of Sunderland COMM80 Risk Assessment of Systems ChangeUnit 11 Risk Mitigation and Contingency Planning COMM80: Risk Assessment of Systems Change.

Slides:



Advertisements
Similar presentations
Note: See the text itself for full citations. Information Technology Project Management, Seventh Edition.
Advertisements

Project Management Gaafar 2007 / 1 This Presentation is uses information from PMBOK Guide 2000 Project Management Risk Management* Dr. Lotfi Gaafar.
Chapter 7: Managing Risk
CSSE September.2008 Risk Chapter 2, pages “At risk”
Unit 6 University of Sunderland COMM80 Risk Assessment of Systems Change Risk Assessment: the Generic Concept COMM80: Risk Assessment of Systems Change.
©Ian Sommerville 2006Software Engineering, 8th edition. Chapter 5 Slide 1 Project management.
University of Sunderland COMM80 Risk Assessment of Systems ChangeUnit 9 Risk Assessment: Business Activity Maps (BAMs) COMM80: Risk Assessment of Systems.
Project Based Risk Management Defusing a potential ticking time bomb
University of Sunderland COMM80 Risk Assessment of Systems ChangeUnit 14 The RAMESES Method. COMM80: Risk Assessment of Systems Change Unit 14.
8 Managing Risk Teaching Strategies
Unit 3 University of Sunderland COMM80 Risk Assessment of Systems Change Introduction to Risk: Concepts, Assessment and Management COMM80: Risk Assessment.
PRM 702 Project Risk Management Lecture #28
Chapter 11: Project Risk Management
HIT241 - RISK MANAGEMENT Introduction
Linac4 Risk Assessment Criteria and Methodology. Linac4 General Meeting – C. Rossi Definitions A risk is any event that could produce a change.
Risk Management - ACostE Kate Boothroyd FIRM Director, KB Risk Consulting Limited.
University of Sunderland COMM80 Risk Assessment of Systems ChangeUnit 12 Risk of Change: Networks and Software COMM80: Risk Assessment of Systems Change.
University of Sunderland COMM80 Risk Assessment of Systems ChangeUnit 13 Overview of Riskit*: The Method and its Techniques * Further information available.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Access Alliance Programme Seminar 1 Writing Bids / Monitoring and Evaluating Projects Norman James / Clare Greensmith STAR Independent Consultants Ltd.
Unit 1 University of Sunderland COMM80 Risk Assessment of Systems Change Risk Aspects and Context Covered in the Module COMM80: Risk Assessment of Systems.
System administration Risk Management Risk Definition Risk Strategies Risk Assessments.
Chapter 11: Project Risk Management
IT Project Management, Third Edition Chapter 11 1 Chapter 6: Project Risk Management.
Risk Management in the Built Environment Qualitative and Quantitative Risk Management By Professor Simon Burtonshaw-Gunn – licensed under the Creative.
©Ian Sommerville 2006Software Engineering, 8th edition. Chapter 5 Slide 1 Risk management.
Liability Issues for TRIO Programs Managing Your Project’s Risk.
Chapter 15: Risk Management
Chapter 17 Risk Management. RISK MANAGEMENT RISK MANAGEMENT FOCUSES ON THE FUTURE RISK MANAGEMENT FOCUSES ON THE FUTURE RISK AND INFORMATION ARE INVERSELY.
1 Risk Management 2 n IEEE defines risk as: “the likelihood of an event, hazard, threat or situation occurring and its undesirable consequences” [Std.
STEP 4 Manage Delivery. Role of Project Manager At this stage, you as a project manager should clearly understand why you are doing this project. Also.
PMP Study Guide Chapter 6: Risk Planning. Chapter 6 Risk Planning Planning for Risks Plan Risk Management Identifying Potential Risk Analyzing Risks Using.
Managing Risk CHAPTER SEVEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Topic 5 Initiating a project
Project Management - Risk Anne Arendt. Risk Management Cost, schedule and scope baselines Throughout project Overall company strategy for managing risk.
CSC 480 Software Engineering Lecture 5 September 3, 2004.
2.2.3 Managing risk in a humanitarian response Learning objectives: At the end of this session, participants will be able to: Define risk List potential.
Project management Topic 5 Risk. What is risk? An uncertain outcome – either from a positive opportunity or negative threat Risk management is about:
1 Project Management C53PM Session 4 Russell Taylor Staff Work-base – 1 st Floor
University of Sunderland COMM80 Risk Assessment of Systems ChangeUnit 10 Decision Points COMM80: Risk Assessment of Systems Change Unit 10.
Risk Assessment: Riskit Analysis Graph
Chapter 8 Risk Management Plans 8 Risk Management Plans C H A P T E R.
1 /13 Risk Management What is Risk ?. 2 /13 Risk Management What is Risk ? Risk is the possibility of suffering loss. (Carnegie Mellon SEI definition)
Harvard ManageMentor ® Avoiding the Worst That Could Happen.
DARSHANA RAGHU MANAGEMENT. Risk Management Risk management is the identification, assessment, and prioritization of risks followed by coordinated and.
Certificate in Employability Skills L1. Overview Unit 431 – Developing Personal Confidence Unit 323 – Attitudes and Values for Personal Development Unit.
CONSULTATION GUIDELINES IMPLEMENTATION UPDATE June 2007.
Successfully Managing Customer Expectations Change is expected to occur during the life of any project, but this change must be controlled and managed.
The process of identifying and controlling the risks is called Risk Management.
 Define and recognize risk  Define the contents of a risk management plan  Conduct a risk identification and prioritization process  Define.
Risk Management.
Project Based Risk Management Defusing a potential ticking time bomb
Teacher: Alison Roberts Northern Sydney Institute of TAFE
8 Managing Risk (Premium).
CHAPTER11 Project Risk Management
Recognization and management of RISK in educational projects
ITPD ISSUE MANAGEMENT PROCESS SEPTEMBER 5, 2008
Risk Register I want to plan a project
System administration Risk Management
Management. Management What is a risk? A risk is simply a probability that some adverse circumstance will actually occur.
Risk Management Process (Revised)
Hurricanes: can the hurricane hazard be managed?
Chapter#8:Project Risk Management Planning
Studio day : Friday (page 1 of 2)
Effective Risk Management in Decision Making Process
Final Project.
Chapter#8:Project Risk Management Planning
Action title DUMMY SLIDE DUMMY SLIDE DUMMY SLIDE Situation
Likelihood 4 Allow 8 Mitigate 12 Avoid 16 3 Accept Severity
Presentation transcript:

University of Sunderland COMM80 Risk Assessment of Systems ChangeUnit 11 Risk Mitigation and Contingency Planning COMM80: Risk Assessment of Systems Change Unit 11

University of Sunderland COMM80 Risk Assessment of Systems ChangeUnit 11 Objectives of Session Coverage Understand the concepts of mitigation, contingency and their difference. Be aware of advice on how to create mitigation strategies Be aware of advice on how to create contingency plans, and assess their impact on a project. Recognise the use of aids such as Riskit’s Control Taxonomy, and RISK RADAR TM in considering and documenting decisions.

University of Sunderland COMM80 Risk Assessment of Systems ChangeUnit 11 Risk Mitigation and Contingency Planning Mitigation and contingency planning are interlinked. Usually Contingency Planning involves: –Deciding how to combat the risk when/after it occurs. Mitigation involves: –Deciding how to avoid or reduce the impact of the risk before it happens.

University of Sunderland COMM80 Risk Assessment of Systems ChangeUnit 11 Riskit’s Control Taxonomy Can be used to assess both contingency plans and mitigation strategies.

University of Sunderland COMM80 Risk Assessment of Systems ChangeUnit 11 Documentation Using RISK RADAR TM

University of Sunderland COMM80 Risk Assessment of Systems ChangeUnit 11 Documenting Mitigation and Contingency Plans

University of Sunderland COMM80 Risk Assessment of Systems ChangeUnit 11 Keeping a Historical Log