Status of UCSB LT Testing All 10 slots are equipped with UTRI, PAACB and adapter boards. All 10 UTRI connected to multiplexer. All 10 slots have HV connections.

Slides:



Advertisements
Similar presentations
Fz-Juelich, 03/09/2013V. Carassiti, P. Lenisa 1 STATUS REPORT.
Advertisements

( 1 ) PROCEDURE FOR FLAT HEAT PRESS OPERATION PROCEDURE FOR MULTI FUNCTION HEAT PRESS MACHINE.
Meeting on status and plans of the LP subsystems for the LP beamtest at DESY 02/25/2008 Franck SENÉE1 LP-TPC: Micromegas Panel and Cosmic Muon Trigger.
FE electronic box Construction of end piece OT module Electronic components Mechanics Cooling.
1 Comparison of MIRAC-4 array with Cornell test array, both warm ver 3 Bill Hoffmann November 10, 2009 Test configuration Array: MIRAC-4 array or Cornell.
I.Tsurin Liverpool University 08/04/2014Page 1 ATLAS Upgrade Week 2014, Freiburg, April 7-11 I.Tsurin, P.Allport, G.Casse, R.Bates, C. Buttar, Val O'Shea,
Irradiation Workshop KarlsruheA. Furgeri 1 Irradiation in Karlsruhe The Karlsruhe-Probestations Procedure of Irradiation Results Future annealing.
How to Build A Computer By John A. Saiz. Materials Required Tools Screw driver Screw driver Tweezers Tweezers Flashlight FlashlightHardware PC Case PC.
Slide 1L3 Testing Meeting March 7, 2003UCSB Status-Anthony Affolder UCSB Testing Status Anthony Affolder (for the UCSB module testing group) Current testing.
Molly, Gwyn, Sam, and Eric.  Do we need mounting holes for the main PCB? How many?  What are our options for heat sinking converters? Should we use.
Recent TOB Developments First LT failure and Stereo Module Status J. Incandela With slides provided by E. Chabalina, A. Affolder, Dean White.
CCD-style imaging for the JCMT. SCUBA-2 technology  the ability to construct large format detector arrays  signal readouts that can be multiplexed To.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 30 June Sam Burke UCSB HEP Group.
Slide 1UCSB Rod Production presented by Jim LambDOE review, January 20, 2004 UCSB Rod Production UCSB Rod Production, Jan , presented by Jim Lamb.
CMS Tracker Week – Module Test Meeting – July 2003 – Patrick Gartung 1 Long term rod testing software Patrick Gartung University of California, Riverside.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 23 June Sam Burke UCSB HEP Group.
Slide 1 Anthony Affolder US Silicon Meeting, March 9, 2004 Equipment Status ARCS equipment status à Single module and 4 hybrid DAQ equipment status à Vienna.
1 US Testing Status-Anthony AffolderModule Testing Meeting, Dec. 11, 2003 Update of US Testing Status Anthony Affolder On behalf of the US testing group.
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update.
CMS Tracker Week – Module Test Meeting – April 2003 – Patrick Gartung 1 Status of US long term module testing Patrick Gartung University of California,
Uli Schäfer 1 Production and QA issues Design Modules have been designed, with schematic capture and layout, in Mainz (B.Bauss) Cadence design tools, data.
UVM CricketSat Wireless Sensor. Remote Temperature Measurement Possible Application –Measure temperature in the upper atmosphere –10 km altitude Two challenges:
ZTF Interconnecting Scheme Stephen Kaye
Low Voltage Power Requirement of TOF FEEs. Maximum tray. Low Noise:  Periodic and Random Distortion (PARD) < few mV RMS Floating.
PACS IBDR 27/ BOLC/BOLA1 BOLC / BOLA SAp/DAPNIA/DSM/CEA C. CARA WE Design Team: A. BOUERE - N. DEVIN - G. DHENAIN - E. DOUMAYROU M. SEYRANIAN -
TAU status 14/2/2012. Temperature behavior in red Delayed response No A/C T=24-25 C 19 o C Cold A/C T=19-20 C 30 o C Hot A/C T=28-32 C 16:30 18:00 04:00.
Mini MMFEMini MMFE Dan Tompkins 12/2013. Block Diagram VMM1 64x analog in Protection Networks Analog Out TTP/TOT ART VDDD VDD VDDP Readout Dan Tompkins.
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
27 th September 2007AIDA design meeting. 27 th September 2007AIDA design meeting.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE 4-Hybrid Thermal Test System Status Sam Burke UCSB HEP Group.
— Test board for CBM01B2 baby detectors — Anton Lymanets & Johann Heuser CBM collaboration meeting GSI, 27 February 2008 Microstrip detector testing at.
Status of the PSD upgrade - Status of production of new temperature, HV control systems MAPD gain monitoring system. -Status of the PSD temperature stabilization.
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 1 Results from module testing E.Chabalina University of Illinois (Chicago)
TE/MPE-TM GRZEGORZ SEWERYN THE UPGRADE OF TT SENSORS C-50 TO THE REDEL CONNECTOR 1.
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
ROBOX with Multi Anode PMT’s Status and plans A.Mestvirishvili, I. Schmidt, S. Sen, F. Ozok University of Iowa.
CERN Single Phase Prototype Initial Discussion on Power/Space Requirements Terri Shaw Neutrino Platform July 30, 2015.
RAL, 17-May-2007Vladimir Rajović / Birmingham MAPS TEST PCB SCHEMATICS REVIEW.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
AEP Mechanical and Power System H. Heetderks. CDR July, 2001NCKU UCB Tohoku AEP Mechanical and Power System H. Heetderks 2 AEP Mechanical Design System.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
12/17/01 Ron Sidwell 1 Run2b Datapath 17 Dec Update Bill Reay, Ron Sidwell, Noel Stanton, Russell Taylor, Kansas State University.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
The monitor The monitor is essentially a computer. The four inputs along the top are: Power, Voltage, Current, and an Ethernet connection.
ECE 300 Brian Austin Paul Obame Michael Vaughn Thomas P. Wills Dr. Green Final Project April 17, 2004.
Electrical Tests of Modules and Ladders Markus Friedl (HEPHY Vienna) 2 October 2014.
The Relay based Multiplexer
DAQ Equipment Status 2 fully equipped Vienna boxes at UCSB and FNAL
UCSB Testing Status Anthony Affolder
UCSB Testing Status Anthony Affolder
Results from module testing
Recent TOB Developments
Hardware Needs (Near Term)
On behalf of the US TOB testing group
US Testing Update Anthony Affolder (On behalf of the US testing group)
Operations/Failure Analysis
US Module Testing Progress Report
Operations/Failure Analysis
FNAL module testing summary
Hybrid & Module Testing Status
Recent TOB Developments
Hybrid & Module Testing Status
Recent TOB Developments
Module Testing Status Week of 3/14-3/18.
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hardware needs (ARCS) Current ARCS capabilities at both sites should be able to keep up with production assuming software changes Automatic I-V curves,
We are working on developing “cheap” RTD monitoring channels for the CMS Phase-2 requirements. The channels will provide the complete readout for 4-wire.
Presentation transcript:

Status of UCSB LT Testing All 10 slots are equipped with UTRI, PAACB and adapter boards. All 10 UTRI connected to multiplexer. All 10 slots have HV connections with bias current monitored by electrometers. 9 cold box plates available with adapter cards mounted on standoffs of correct height. 4 PAACB’s are connected for readout of module temperature sensors and low voltage currents. Software reads out everything that is connected. –

IV curves. Upper T=23C, Lower T=-15C,-18C,-20C Module 1042 Module 1041 Module 1040 Module 1033

Leakage current versus time (temperature).

Module temperature sensor readings (blue, magenta) Heat sink temp (red), carrier plate temp (green)

Module 1037

Large amount of noise occasionally seen in system. Might be faulty backplane connection.

Faulty backplane? Connections through backplane made with stacked wire wrap connectors. Pins are long and fragile and not rounded. Pins have been bent while connecting adapter due to very slight misalignment (~0.02 in) of standoffs. Two HV connections through backplane are open. Made HV connection by using spare pin on PAACB and adapter board. Large noise in the system that can go away when adapter board is reseated on backplane connector. Rebuild backplane using PCB mounted connectors instead of stacked connectors.