PALM-3000 P3K Team Meeting #16 Stephen Guiwits Dean Palmer, Ernest Croner, Antonin Bouchez Team Meeting #16 -- 126 Cahill March 05, 2010.

Slides:



Advertisements
Similar presentations
Fischer Manufacturing is an electrical fabrication company based in New Brighton, MN. We specialize in building to engineering specified requirements.
Advertisements

CMS Week March presented by John Coughlan RAL FED Hardware Status Pre-Series Manufacture Final Production Plans.
University College London, Optical Science Laboratory bHROS Progress bench-mounted High Resolution Optical Spectrograph bHROS bHROS Progress General.
Flavio Dal Corso - INFN Padova1 OPERA coll. meeting - Hamburg 3 July 2004 RPC & XPC Electronics Status Front End Boards (FEBs) Controllers HV system Crates.
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
Introduction Characteristics of USB System Model What needs to be done Platform Issues Conceptual Issues Timeline USB Monitoring Final Presentation 10.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
PALM-3000 Status of the PALM-3000 high-order adaptive optics system A.H. Bouchez, R.G. Dekany, J.R. Angione, C. Baranec, K. Bui, R.S. Burruss, J.R. Crepp,
PALM-3000 Electronics PDR Stephen Guiwits Dean Palmer Ernest Croner 023 Robinson Room January 21, 2009.
PALM-3000 P3K Team Meeting #9 Stephen Guiwits Team Meeting #9 and 023 Robinson October 22, 2008.
PALM-3000 Management Update A. Bouchez, J. Roberts Team Meeting #15 10/29/09.
PALM-3000 PALM-3000 Management Update Antonin Bouchez, Jenny Roberts Team Meeting #7 27 February, 2008.
PALM PALM-3000 project status 31 Jan COO All-Hands Mtg. Recent Milestones Requirements review on 12 Nov AO system offline for maintenance.
PALM-3000 Management Update A. Bouchez Team Meeting #9 10/22/2008.
Dennis Coyne Excomm Jan 26, 2004
PALM-3000 P3K Integration and Test Review Stephen Guiwits P3K System Computers and Electronics 273 Cahill September 22, 2010.
PALM-3000 Integration and Testing Status A. Bouchez Team Meeting #15 10/29/2009.
PALM-3000 PALM-3000 Status and the 3388-actuator Xinetics Deformable Mirror A.H. Bouchez, R.G. Dekany, J.R. Angione, C. Baranec, K. Bui, R.S. Burruss,
PALM-3000 PALM-3000 Instrument Architecture Antonin Bouchez PALM-3000 Requirements Review November 12, 2007.
PALM-3000 PALM-3000 Status A.H. Bouchez, J.E. Roberts Project 1640 Las Vegas Summit 1/28/2010.
PALM-3000 P3K FPDP Carrier Board Review Dean Palmer Building 318, Room 125 November 10, :00 am – 12:00 pm.
WBS & AO Controls Jason Chin, Don Gavel, Erik Johansson, Mark Reinig Design Meeting (Team meeting #10) Sept 17 th, 2007.
PALM-3000 Optical Bench Update Jenny Roberts Optical Bench Team: C. Baranec, A. Bouchez, K. Bui, R. Burruss Team Meeting #15 10/29/2009.
PALM-3000 P3K Team Meeting #15 Stephen Guiwits Dean Palmer Ernest Croner Team Meeting # Cahill October 29, 2009.
LAr ROD Status Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Laurent, Eric, Jean-Pierre, Gilbert,... ATLAS Geneva DPNC January 12 th, 2005.
PALM-3000 PALM-3000 Software Requirements Review Thang Trinh PALM-3000 Requirements Review, Caltech Campus November 12, 2007.
PALM-3000 ATST/BBSO Visit Stephen Guiwits P3K System Hardware 126 Cahill February 11, 2010.
PALM-3000 High-order Wavefront Sensor Update Christoph Baranec Team Meeting #9 10/22/2008.
PALM-3000 Team Meeting #15 – Wavefront Sensor(s) C. Baranec October 29 th 2009.
PALM-3000 Instrument commissioning schedule Antonin Bouchez Team Meeting #7 27 February, 2008.
PALM-3000 PALM3000 Realignment Winter Jenny Roberts Optical Bench Team: C. Baranec, A. Bouchez, K. Bui, R. Burruss, R. Dekany, M. Troy Layout.
PALM-3000 Budget and Schedule Update A. Bouchez, J. Roberts Team Meeting #10 1/8/2009.
P3K RTC Status Tuan Truong & Mitchell Troy P3K Team Meeting #4 7/19/2007.
1 RoboSapien Based Autonomous Humanoid Robot Researched and Presented by Nick Repka.
October, Scientific Linux INFN/Trieste B.Gobbo – Compass R.Gomezel - T.Macorini - L.Strizzolo INFN - Trieste.
TMDB delay and production plan Augusto. TMDB Prototype Status The prototype boards almost fully assembled should be delivered this week ( May 5 th ) First.
FEE Electronics progress Mezzanine manufacture progress FEE64 testing and VHDL progress Test mezzanine. Trial mechanical assembly 10th November 2009.
1 Jim Thomas - LBL 4.2 Meters ~ 1 Meter The SSD: March Face to Face Meeting Jim Thomas Lawrence Berkeley Laboratory March 14 th, 2012 The SSD.
SJDEVLA Advisory Committee Meeting September 6-7, EVLA Production and Maintenance Steven Durand presenting for the E lectronics Division.
FEE Electronics progress PCB layout progress VHDL progress in TBU Prototype fixtures FEE64 commissioning A few of the remaining tasks 16th July 2009.
Linux Kernel Management. Module 9 – Kernel Administration ♦ Overview The innermost layer of Linux operating system is the kernel, which is a thin layer.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
TE/MPE/EE J. Mourao T/MPE/EE 23 December 2012 LHC Machine Redundant Power supply (DQLPUR) & interface Module (DQLIM) assembling during LS1.
Status of NA62 straw electronics Webs Covers Services Readout.
LKR Working group Introduction R. Fantechi October 27 th, 2009.
CERN Control Standards Front-End Computer Layer Stéphane Deghaye BE/CO/FE
DBSP-R Upgrade Progress Review The DBSP-R Team DBSP-R Progress Review.
1Malcolm Ellis - Tracker Meeting - 28th November 2006 Electronics - Station Acceptance  Hardware: u 1 MICE cryostat with 1 VLPC cassette. u VME crate,
P08311: FPGA Based multi-purpose driver / data acquisition system Sponsor: Dr. Marcin Lukowiak Team MemberDisciplineRole Andrew FitzgeraldCEProject Manager/FPGA.
Advisor: Zhao Zhang Team Members: Chris Chambers Christopher Reis Alex Dean Luke Breuer SPALDING GYMNASTICS SCOREBOARD Client: Spalding Advisor: Zhao Zhang.
B.Satyanarayana Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai,
FEE Electronics progress Mezzanine layout progress FEE64 progress FEE64 initial testing Test mezzanine. A few of the remaining tasks 2nd October 2009.
Introduction Characteristics of USB System Model What needs to be done Platform Issues Conceptual Issues Timeline USB Monitoring David Harding Front page.
IPHC-LBL-BNL video conference 19 Jan 2007 HFT development MimoStar2 based telescope.
Computer Operating Systems And Software applications.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Status of the TileMuon Digitizer Board Victor Ferraz.
ALD Technology Transfer – Progress Update LAPPD2 Godparent Review Aileen O’Mahony 5 th April 2013.
MobiDick4 progress report Carlos Solans. Introduction MobiDICK is a complete test bench for super-drawers Will be used during the maintenance in the long.
Design & Integration Services at the University of Florida
VME Pixel ROD Setup in UW Pixel Lab B050
CMS November Upgrade Week
10/month is the present production rate 2 FTE + sporadic contributions
Assembly order PCB design
EVLA Advisory Committee Meeting System Status
FEE Electronics progress
PLANNED WORK for week #10 (week of Oct. 28 – Nov. 3) PROGRESS
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
Modification in LHCD DAC System to INCORPORATE MEASUREMENT OF RF POWER
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #10
Presentation transcript:

PALM-3000 P3K Team Meeting #16 Stephen Guiwits Dean Palmer, Ernest Croner, Antonin Bouchez Team Meeting # Cahill March 05, 2010

PALM-3000 From Team Meeting #15 The Near Future Build up RTC racks at Caltech –Complete work on Caltech Suse Kickstart –Incorporate new kernel findings into every version of the kickstart –Work on Real-Time Linux with Quadrics Done. Suse is now Red Hat. All components are working. Waiting on a few camera data adapters to get the final HOWFS data to each PC Build up DM racks at Caltech Done. Modified Omnetics Cables worked as expected Test the DM when it arrives from Xinetics Done. Mirror test went well! 2

PALM-3000 From Team Meeting #15 The Near Future Measure power consumption of drivers to help determine proper cooling method Done. Test power consumption (rated and actual) on all other components as well. Move motion control and acquisition hardware from JPL to Caltech for installation, development, and testing Done Move AO racks down from Palomar. They have been modified with cassegrain cage mounting hardware Done. Racks currently at CIT in use or in storage 3

PALM-3000 P3K Electronics Active Mirror Interfacing Completed HODM Carrier Board PCB Layout Sent procurement out to manufacturer FPGA design in progress Developing a custom housing for the HODM interface boards –Mostly COTS materials Developing a cable design to interface the HODM boards with drivers 4

PALM-3000 P3K Electronics Active Mirror Cabling Completed the designs for the Mirror Interface Boards (MIB) and the Driver Interface Boards (DIB) Quotes in hand for parts and assembly Deciding on a vendor next week and will procure once funding is established 5