Takashi Matsushita Imperial College T. Matsushita 1 Station 5.

Slides:



Advertisements
Similar presentations
Takashi Matsushita Imperial College T. Matsushita 1 Station 5 status.
Advertisements

TPC meeting, NBI, 2-3 September 2002Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, Copenhagen, 2-3 September 2002 Børge Svane Nielsen, Jørn.
Stave Vacuum Tool Tim WP4 Face to Face Liverpool, 13/11/14.
MICE Collaboration MTG IIT – Feb 2002 The Fiber Tracker Option for MICE Spectrometers The D0 Central Fiber Tracker – Experience and Implications for MICE.
G.Barber: Mice Tracker Meeting New York1 Plans for Sci-Fi Prototyping. Contents:- Mechanical Layout of Sci-Fi Design of the Fibre Optic Connectors.
Takashi Matsushita Imperial College T. Matsushita 1 Quality Assurance 16/05/06.
Takashi Matsushita Imperial College T. Matsushita 1 Station five – assembly/QA.
Hybrid assembly at Glasgow. Placing ASICs Arrange 20 ASICs in ASIC tray with strip bond pads facing outwards – ASICs to be used in ‘Cat A’ sample boxes.
Status Update on Mechanical Prototype in Rome November 6,
Status of MICE Tracker System H. Sakamoto, Osaka University (on behalf of the MICE Collaboration) International Muon Ionization Cooling Experiment (MICE)
MICE Tracker workshop, 06Nov Waveguides for Station5 H. Sakamoto / M. Yoshida.
Scintillating Fiber and Ribbon Production Update Alan Bross MICE Tracker Phone Meeting September 8, 2006.
Takashi Matsushita Imperial College T. Matsushita 1 Quality Assurance; status 18/05/06.
G.Barber Tracker Update, Berkeley 10 Feb Tracker Progress Contents:- Station Space Frame Patch Panel / Vacuum Seal Light Guide Map Position of Degrader/Support.
Clear Fiber and Wave Guide Fab. Makoto YOSHIDA (Osaka Univ.) July MICE FT
QA for the Fibre Tracker 28 October 2004Brunel QA for fibre bundling Dr Paul Kyberd and Dr Peter Hobson School of Engineering & Design Brunel University,
Cosmic Ray Analysis 1M.Ellis - CM23 - Harbin - 15th January 2009  Not enough time to go into detail, so just a quick summary of the status since CM22:
T. Matsushita 1 Station 5 as of 28 Nov 2006 All planes bundled All planes connectorised All planes glued Fibres potted Ready for cut/polishing Shift takers;
6 th April 2005 Malcolm Ellis, Imperial College London 1 Sci Fi Status & KEK Test.
G.Barber 28 Oct Construction/Refurbishment Of The Tracker Prototype Contents:- Welcome Back Plans Layout Things to be addressed New Schematic.
Tracker QA P. Kyberd, M. Takahashi 1 Quality Assurance for SciFi Tracker (Brunel, FNAL, IC, Osaka) A status report: A procedure for ensuring the quality.
Takashi Matsushita Imperial College T. Matsushita 1 Engineering (Mechanical) Geoff Barber.
Final Tracker Connection Map Version 1 1 Connection Mapping for the Final Mice Trackers Geoff Barber November 2005 TM – 03 Jul 06 TM – 21 Jul 06.
Takashi Matsushita Imperial College T. Matsushita 1 Full tracker station assembly/QA, schedule.
Takashi Matsushita Imperial College T. Matsushita 1 Station5 in UK.
G.Barber Mice Tracker Mechanical Progress Imperial Tracker Update Contents:- Components Station Layout Light Guide Map QA Patch Panel Alignment.
Tracker Refurbishment. What was done… Over the past 3-4 months Trackers 1 and 2 have been refurbished. What does this mean? The trackers were removed.
Stave core assembly Stephanie Yang WP4 face to face meeting, Lancaster University 20 Feb 2014.
MICE Tracker Update Alan Bross NFMCC Friday Meeting November 10, 2006.
Takashi Matsushita Imperial College T. Matsushita 1 Tracker Status.
Waveguide for Station 5 M. Yoshida (Osaka Univ.).
1 SciFi Results and Comparison Malcolm Ellis, for the MICE Scintillating Fibre Group Abingdon, 31 st October 2003.
1 MICE Tracking Detectors Malcolm Ellis NFMCC Meeting 12 th March 2006.
Tracker QA Paul Kyberd Quality Assurance A status report: A procedure for ensuring the quality of the finished tracker has been designed following our.
G.Barber KEK Test Beam Update, Berkeley 9 Feb KEK Test Beam – Tracker Progress Contents:- Station Space Frame Light Guide Map Station Connectors.
G.Barber: Mice-International Meeting Plans for Sci-Fi Prototyping. Contents:- Mechanical Layout of Sci-Fi Design of the Fibre Optic Connectors.
Sci-Fi Tracker: Progress Report Malcolm Ellis, MICE Video Conference Wednesday 6 th October 2004.
Tracker Summary Alan Bross MICE CM October 10, 2007.
MINERvA Mini-Review Debbie Harris Jeff Nelson Kevin McFarland Jeff’s slides version 1.
G. Barber Sci-Fi Tracker Progress Ral 28 Oct Progress On The Design Of The Full Tracker Contents:- Recap of New Station Layout Version 2.5 Version.
Takashi Matsushita On behalf of IC/Brunel team Imperial College T. Matsushita 1 Preparation for station five Construction/bundling/connectorisation.
Status of cosmic-ray test of the SciFi prototype and SciFi software in G4MICE M. Yoshida (Osaka Univ.)
1M. Ellis - NFMCC - 31st January 2007 MICE Tracker.
Takashi Matsushita Imperial College T. Matsushita 1 Station5 Assembly/QA status, schedule.
Light Loss Tests Update Aron Fish 22/02/06 Mice Tracker Phone Conference.
1M. Ellis - 17th May 2007 SciFi Decoding (Everything you never wanted to know but couldn’t avoid going over and over)  VLSB Data (unpacking to AFE, MCM,
Takashi Matsushita Imperial College T. Matsushita 1 Quality Control of Station Assembly.
Tracker Summary Alan Bross MICE CM17 CERN February 25, 2007.
Stave C channel side closeout gluing jig S Yang WP4 monthly meeting at Liverpool University 26 th March 2014.
G.Barber: Sci-Fi Mechanical Design - Tracker Meeting Cern 29 March Latest thoughts on Mechanical Design Contents:- Revised Fibre Pitch Fibre Optic.
G.Barber/Peter Cooke: Mechanical Design Update Imperial 22 July Mechanical Update for Tracker workshop Contents:- New Station Layout Light Guide.
M. Takahashi, 21 January, 2016 Station Acceptance (SA)
Final Tracker Connection Map Version 1 1 Connection Mapping for the Final Mice Trackers Geoff Barber November 2005 TM – 03 Jul 06 TM – 21 Jul 06.
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
G.Barber Mice Tracker Integration Harbin Jan Mice Tracker Integration Installation requirements & Procedure.
T. Matsushita 1 Scintillating fibre tracker The scintillating fibre tracker reconstructs muon tracks before and after the MICE cooling section in 4 T magnetic.
Main Parts of a Drilling Machine
Tracker 1. Status 2. Expected delivery date of system to RAL 3. Required support infrastructure needed for setup and initial debug. Things like vacuum,
MICE Phone Meeting 26 October Status report of Waveguides for Station5 Hideyuki Sakamoto Contents Review of production process Present status Plans.
G.Barber Mice Tracker Mechanical Progress Tracker Update Contents:- Components Station Layout Light Guide Map QA Patch Panel Alignment of Tracker.
T. Matsushita 1 News Ribbons - i Inspection at IC All five ribbons have production date Two ribbons have mold ID + production ID (e.g. mold4#1) One ribbon.
G.Barber: Summary of Mice Fibre Tracker Meeting FermiLab 8-12 March Developments during Tracker workshop Contents:- Revised Fibre Pitch Fibre Optic.
G.Barber: Mice Collaboration Meeting 29 March Plans for Sci-Fi Prototyping. Contents:- Mechanical Layout of Sci-Fi Design of the Single Stage Design.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
T. Matsushita 1 QA: Fibre Counting Software 1. Take CCD image of comb/connector 2. Cut noise 3. Find bundles: Nearest Neighbour Clustering, merge clusters.
K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb 08 1 Mice Tracker Mechanical Status Contents:- Tracker 1 Status Tracker 2 Status Further Hardware.
Aron Fish Imperial College Mice Video Conference 01/02/06
Mechanics: (Tim).
Open Issues Modification of Cactus Arm bending tool required
Scintillating Fiber/Clear Fiber QA and Ribbon Production
Presentation transcript:

Takashi Matsushita Imperial College T. Matsushita 1 Station 5

T. Matsushita 2 Contents Introduction Components Schedule Assembly plans QA development status Summary

T. Matsushita 3 Introduction Fifth station The first production version of tracker stations Finalise quality assurance and quality control procedures during assembly of the fifth station QA/QC procedures will be documented to initiate station production line Milestone Finish assembly of the fifth station this September Performance check Station performance, e.g. light-yield, efficiency, uniformity and dead- channels, will be checked with source scan

T. Matsushita 4 Components Scintillating fibre Purchased and delivered to FNAL New mold to make doublet-layers is ready Doublet-layers for the 5 th station will be ready in July Carbon-fibre station Ready at Liverpool Optical connectors on station To be prepared

T. Matsushita 5 Schedule We have schedule to finish the 5 th station this September

T. Matsushita 6 Assembly - sequence Sequence used to build prototype stations 1. Cut scintillating fibres, polish one end and apply Al mirror 2. Place scintillating fibres on mould with adhesive and teflon/mylar films to make a doublet-layer 3. Ship doublet-layers from FNAL to IC 4. Visual inspection of the doublet-layers for any damage caused in transit 5. Align the doublet-layers on a vacuum chuck 6. Bundle seven fibres with rubber sleeves (QA) 7. Thread the bundle into a station connector (QA) 8. Put the vacuum chuck on an assembly jig 9. Fix a carbon-fibre station to the assembly jig 10. Glue the doublet-layers to carbon-fibre station 11. Attach doublet-layers connectors to the carbon-fibre station 12. Cut the fibres 13. Pot the fibres 14. Polish the fibres

T. Matsushita 7 Assembly - tools Tools for station assembly and QA are ready/being developed Carbon-fibre station holder Bundling Comb - QA Connectorisation bridge - QA Vacuum chuck Alignment jig Station holder on Alignment jigVacuum chuck with comb

T. Matsushita 8 Assembly - doublet-layer alignment The first step is to align a doublet-layer onto the vacuum chuck Doublet-layer aligned with respect to vacuum chuck, ~100  m over ~30cm, 0.03  rad tilt 1000  m Reference fibre

T. Matsushita 9 Assembly - fibre bundling I Starting from the centre fibre, bundles of seven fibres are placed in the groove of the comb Centre fibre will be clearly marked at FNAL Channel 214 Channel 1 Channel 107 Channel 108 View from end of chuck looking at the connector end of the fibre ribbon Chuck with numbering for planes ‘V’ & ‘W’ Mylar Centre Fibre Comb to help bundling and quality assurance procedure Once double-layer is placed on the vacuum chuck, we start fibre bundling

T. Matsushita 10 Assembly - fibre bundling II Fibre bundling with comb under development Better to trim fibres to ease counting/recording of seven fibres held in a rubber sleeve => need to trim fibres without damaging them Different colouring of top and bottom fibres could help to identify correct seven fibres during bundling => possibility to be checked Bundles of seven fibres held together with rubber sleeve, placed in grooves Groove cover to prevent tangled fibres

T. Matsushita 11 Assembly - fibre bundling III Fibre scan with LED as a QA procedure under development, in order to check correct bundling The top right picture taken with 370nm LED The movie taken with 400nm LED; attempt to check fibre sequence difficult to check; top fibre is bright and the bottom fibre is dark. Whenever the bottom layer is illuminated the top layer is illuminated. Prefere < 400nm LED; fibre degradation test with UV LED is planned Need to cover larger area with CCD to check cross-wiring between bundles in different grooves. At least three grooves to be covered.

T. Matsushita 12 Assembly - connector QA We had a problem of misalignment of the station connectors, which led to lower light yield from the 4 th station. For example, at the station connector C16, loss of light due to misalignment is estimated as ~16%. We will use QA gauge to ensure that the connectors have aligned holes. QA gauge

T. Matsushita x x Assembly - connectorisation Bundle is threaded into correct hole in a connector and placed on “bridge” QA ensures correct threading; procedure to be developed View ‘W’ 20 Way Bundles 1 – 20 To Bulkhead Connectors 1, 6, 11, 16 & 21 Station connector Viewed from the polished face. Internal light-guide connector viewed from rear or fibre entry side.

T. Matsushita 14 Assembly - final steps Put the vacuum chuck on an assembly jig Fix a carbon-fibre station to the assembly jig Glue doublet-layer to carbon-fibre station Connectors on “bridge” are attached to the correct position Cut fibres Pot fibres Cut fibres Polish fibres View of the station onto the polished face of the connector

T. Matsushita 15 Assembly - prototype

T. Matsushita 16 Summary We will build the fifth station with the improved assembly procedure which incorporates QA Components are ready/being prepared We have assembly sequence Developing QA procedures with “comb” and “bridge” Finalise QA procedures during assembly of the fifth station We will have the fifth station this autumn Station performance; light-yield, uniformity, dead-channel, will be checked with source