MERIT Beam Collimator Design Nicholas Olesen 9 August 2006.

Slides:



Advertisements
Similar presentations
Energy deposition in Q0 Elena Wildner 19/04/07. Strategy 1. Define a TAS to protect the Q0 2. Optics:  *= 0.25m 3. Calculate, with some optimization.
Advertisements

Neutrinos from Stored Muons STORM Target Station Conceptual Design 15-April-2013 Kris Anderson Fermilab/Accelerator Division/Mechanical Support Department.
Wire scanners MDW chicane energy collimator 3 MPS collimators in this region end of linac Damage Simulation in MPS Collimators L. Keller Apr. 9, 2006.
Simulations with ‘Realistic’ Photon Spectra Mike Jenkins Lancaster University and The Cockcroft Institute.
The FAIR Antiproton Target B. Franzke, V. Gostishchev, K. Knie, U. Kopf, P. Sievers, M. Steck Production Target Magnetic Horn (Collector Lens) CR and RESR.
MERIT Hg System Final Design Review Hg Target System Design Interfaces V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Collaboration Meeting MIT Plasma.
ISS, 23 September 2005E. Gschwendtner, CERN1 Beam Instrumentation at CNGS 1. Introduction 2. Layout 3. Beam Instrumentation 4. Summary.
24/01/08Energy deposition, LIUWG, Elena Wildner1 Upgrade phase 1: Energy deposition in the triplet Elena Wildner Francesco Cerutti Marco Mauri.
UCNA specs – JWM 9/4/7 Proton beam energy = 800 MeV Peak proton current = 40 uA Duty cycle = 1/10 (1 sec on, 10 sec off) Therefore time-averaged current.
Mercury Jet Studies Tristan Davenne Rutherford Appleton Laboratory Joint UKNF, INO, UKIERI meeting 2008 University of Warwick, Physics Department 3-4 April.
MC/NF TARGET SHIELDING STUDIES. NICHOLAS SOUCHLAS (10/29/2010)‏ 1.
Harold G. Kirk Brookhaven National Laboratory MERIT Installation Issues CERN Meeting June 20, 2006.
1 Optical Diagnostic Results of Hg Jet Target and Post-Simulation H. Park, H. Kirk, K. McDonald Brookhaven National Laboratory Princeton University Stonybrook.
3D Target Simulations with Front Tracking/Ghost Fluid Method Wurigen Bo (Sept. 9, 2009) Brookhaven National Lab.
Optimization of Target Parameters for a Tungsten Target (Half Density) at 8GeV X. Ding Target Studies Nov. 2, 2010.
1 Optical Diagnostic Results of MERIT (Mercury Intense Target) Experiment at CERN H. Park, H. Kirk, T.Tsang, K. McDonald, F. Ladeinde NFMCC Meeting Fermilab,
Baseplates and Hg System Handling V.B. Graves P.T. Spampinato MERIT Hg System Safety Review CERN June 19-20, 2006.
 Stephen Brooks / UKNF meeting, Warwick, April 2008 Pion Production from Water-Cooled Targets.
1 Comparison of Power Depositions X. Ding, D. B. Cline, UCLA H. Kirk, J. S. Berg, BNL Collaboration Meeting July 2, 2010.
Comparison of Power Deposition in SC1 Coil Xiaoping Ding UCLA Target Studies Jun. 29, 2010.
1 3D Simulations for the Elliptic Jet W. Bo (Aug 12, 2009) Parameters: Length = 8cm Elliptic jet: Major radius = 0.8cm, Minor radius = 0.3cm Striganov’s.
MERIT Experiment Status MERcury Intense Target K. McDonald for the MERIT Collaboration August 30, 2007 TT2/TT2A: MERIT Build.272: Offices & Control Room.
Hybrid QD0 Studies M. Modena CERN Acknowledgments: CERN TE-MSC CLIC Magnets Study Team: A.Aloev, E. Solodko, P.Thonet, A.Vorozhtsov “CLIC/ILC QD0” Meeting.
COMPUTED TOMOGRAPHY - I RAD 365 CT - Scan
LINAC 4 Project L4T/L4Z Design Status J.Humbert / B.Riffaud on behalf of EN-MME design team 1 st September 2011 LINAC4 – BEAM COORDINATION COMMITTEE B.Riffaud.
 A GEANT4-based simulation was performed of the production target, solenoid, selection channel, and spectrometer.  The acceptance was found to be 8.3x10.
Large Colimator Study EAR2 Christina Weiss, CERN.
1 Optical Diagnostic Results of MERIT Experiment and Post-Simulation H. Park, H. Kirk, K. McDonald Brookhaven National Laboratory Princeton University.
AWAKE Electron Spectrometer Simon Jolly, Lawrence Deacon, Matthew Wing 28 th January 2015.
20to2T5m100cm Images Van Graves February 13, 2014.
Permanent Magnet Quadrupoles for the CLIC Drive Beam Jim Clarke, Norbert Collomb, Neil Marks, James Richmond, and Ben Shepherd STFC Daresbury Laboratory,
ASTeC Report for CLIC-UK Jim Clarke on behalf of all ASTeC & Technology Department staff contributing to CLIC-UK STFC Daresbury Laboratory, UK CERN-UK.
Status of Phase II Energy Loss Studies 1. FLUKA with “simple” CERN-provided input file modeling ~40m around primary collimators used for all SLAC studies.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
First AWAKE dump calculations Helmut Vincke. Beam on dump Muon axis inside and outside CERN Distances: Beam impact point to end of West hall: ~300 m Beam.
Estimation of temperature increase in the dump through Monte – Carlo simulations and rough calculations N. Charitonidis (EN/MEF)
RaDIATE October Technical MeetingOctober BLIP Irradiation Planning Radiation Damage In Accelerator Target Environments.
Update for muon studies Helmut Vincke. Additional dump calculations Two options were studied: Option 1: beam is bend by 2 degree towards soil and beam.
COMPUTED TOMOGRAPHY - I RAD 365 CT - Scan
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
Collimator and beamline heating External Review of the LHC Collimation Project CERN Wed 30/6/2004.
RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team.
EAR2 Beam Line Report on the Status C. Weiss EAR2 Beam Line - Report on the Status1.
1 Question to the 50GeV group 3GeV からの 54π と 81π 、 6.1π の関係 fast extraction 部の acceptance (81π?) Comments on neutrino beamline optics?
Baseplates and Hg System Handling V.B. Graves P.T. Spampinato MERIT Hg System Safety Review CERN June 19-20, 2006.
Recent Studies on ILC BDS and MERIT S. Striganov APD meeting, January 24.
Heat Deposition Pre-Evaluation In the context of the new cryo-collimator and 11-T dipole projects we present a review of the power deposition studies on.
Structural Drafting Assembly Clearance Dimensions.
T2K Remote Handling T. Sekiguchi (KEK) on behalf of Tada (KEK) 2012/11/10.
1 February 07, 2008 Simulation Status of Mercury Jet Target HeeJin Park.
Simulation of heat load at JHF decay pipe and beam dump KEK Yoshinari Hayato.
Racquetball Launcher Project [Names]. Initial Launcher Design Drawing [Insert your first design drawing here.]
Ids120h_side. ids120h_top ids120h_iso ids120h_end.
CBM magnet overview of the BINP work
BEAM LOSS MONITORING SYSTEM
Positron production rate vs incident electron beam energy for a tungsten target
Preliminary result of FCC positron source simulation Pavel MARTYSHKIN
Physics Case of the Day - Sunday
Components for the Machine-Interface Regions
Studies on Energy Deposition and Radiation for the 4horn system
BEAM LOSS MONITORING SYSTEM
Proposed Offset Mirror System
Objective - To identify how perimeter and area relate.
Magnetic gap calculation
MQYY: superconducting Quadrupole magnet for Hl-lhc
OLYMPUS Collaboration Meeting Luminosity Monitor Calorimeter
Gas cell apertures with dimensions (original)
MERIT Beam Collimator Design
SoLID SIDIS He3 target collimator optimization
US LHC Accelerator Research Program
Presentation transcript:

MERIT Beam Collimator Design Nicholas Olesen 9 August 2006

2 Contents Collimator Role Requirement Specifications Proposed Design Additional Information

3 Collimator Role Beam of ~30 x protons per pulse, integrated power of ~140kW Align the proton beam with the mercury target Prevent proton beam from hitting and damaging experiment equipment

4 Requirement Specifications Nominal position at beam height of 120cm above concrete floor Located 2m upstream of magnet – must be non-magnetic material Length of 1m Collimator block area of at least 150mm x 150mm

5 Proposed Design All requirement specs are met Collimator block area of 160mm x 160mm Hole radius of 20mm Lateral movement (x and y axes) of +30mm, longitudinal movement (z axis) of +55mm; manually adjustable Uses CERN standard parts wherever possible

6

7 Additional Information Target dimensions confirmed Collimator insert Needs to be exchangeable (e.g. for different sized aperture) Material is tungsten Need drawings of CERN standard parts for alignment Calculations for energy deposited by beam