GLAST LAT Project Instrument Analysis Meeting– May 27, 2005 Hiro Tajima, TKR Bad Strips 1 GLAST Large Area Telescope: TKR Bad strips analysis update Hiro.

Slides:



Advertisements
Similar presentations
GLAST LAT Project I&T Meeting – Jan 20,2004 E. do Couto e Silva 1 GLAST Large Area Telescope: EM1 Data Analysis and Calibration Summary Report Eduardo.
Advertisements

1 GLAST Large Area Telescope Monthly Mission Review LAT Flight Software Status June 6, 2007 Jana Thayer Stanford Linear Accelerator Center Gamma-ray Large.
GLAST LAT Project Apr 1, 2005 E. do Couto e Silva 1/31 Overview of End to End Runs Eduardo do Couto e Silva April 1, 2005 ( not it is not a joke, we finally.
GLAST LAT Project Instrument Analysis Workshop 6 – 06/02/27 F. Piron & E. Nuss (LPTA) 1 Trending CAL performance and mapping crystals Gamma-ray Large Area.
GLAST LAT Silicon Tracker Marcus ZieglerAPS April Meeting The GLAST Silicon Tracker Marcus Ziegler Santa Cruz Institute for Particle Physics University.
GLAST LAT ProjectNovember 04, 2005 Phase 0 TRR 1 GLAST Large Area Telescope: Integration and Test -Electrical Test- Phase 0 TRR Key Requirements Documents.
GLAST LAT Instrument GLAST Monthly Mission Review October 29, 2007 K. Fouts, SLAC 1 Monthly Mission Review Project Status Overview October 29, 2007 Ken.
GLAST LAT Project TKR Tower 4 and 5 hand-off review – June 8,2005 Hiro Tajima, TKR Tower 4 and 5 hand-ff review 1 GLAST Large Area Telescope: TKR Hand-off.
GLAST LAT Project Integration and Test SVAC Peer Review 1 GLAST Large Area Telescope: I&T Integration Readiness Review SVAC Peer Review July 21,
GLAST LAT Instrument GLAST Monthly Mission Review October 5, 2007 K. Fouts, SLAC 1 Monthly Mission Review Project Status Overview October 5, 2007 Ken Fouts.
GLAST LAT Project 1 Tracker “mini-tower” Full Size Calorimeter module Face to Face IDT meeting March 20, 2002 Convener: E. do Couto e Silva Engineering.
TkrRecon Status Perugia Software Workshop May, 2003.
Modeling TKR Readout Effects Part 2 Leon R. Analysis Group 12 September 2005.
A.Chekhtman1 GLAST LAT ProjectInstrument Analysis meeting, June, 24, 2005 CAL retriggering study with SLAC data. Alexandre Chekhtman NRL/GMU Gamma-ray.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: On-Orbit Calibration and.
GLAST LAT Project LAT Instrument Analysis Meeting – May 26, 2006 Hiro Tajima, TKR Efficiency Trending 1 GLAST Large Area Telescope: TKR Efficiency Trending.
GLAST LAT Project July 19, 2005 E. do Couto e Silva 1/17 Science Verification Analysis and Calibration GLAST Large Area Telescope Eduardo do Couto e Silva.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 6 of 12 LAT Test Results 1 GLAST Large Area Telescope Pre-Environmental Test.
GLAST LAT Readout Electronics Marcus ZieglerIEEE SCIPP The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus.
GLAST LAT Readout Electronics Marcus ZieglerIEEE SCIPP The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus.
GLAST LAT ProjectOctober 1st, 2004 GLAST LAT Tracker Anomaly Resolution Team 1 TMCM connector stay clear problem Alessandro Brez INFN - Pisa
A.Chekhtman1 GLAST LAT ProjectCAL Recon rewriting meeting, May, 11, 2005 In what cases we need external position estimation ? Alexandre Chekhtman NRL/GMU.
GLAST LAT Project Analysis Meeting March 22, 2004 E. do Couto e Silva 1/8 LAT Instrument Test Analysis Eduardo do Couto e Silva March 23, 2004.
IA meeting, Feb. 3, 2006 Mutsumi Sugizaki TKR Noise Stdudy 1 LAT TKR Noise Study Current Status Mutusmi Sugizaki (and short comment about TOT=255 event)
GLAST LAT Project Instrument Analysis Meeting– Dec 9, 2005 Takuya Kawamoto, TKR Noisy Strip determination 1 Noisy Strip determination Takuya Kawamoto (Hiroshima.
GLAST LAT Project SE Test Planning meeting October 4, 2004 E. do Couto e Silva 1/13 SVAC Data Taking during LAT SLAC Oct 4, 2004 Eduardo.
TriggerLatchingEffLAT_ ppt1 Status report of overall Trigger and Latching Efficiencies study Instrument Analysis meeting, May 13, 2005 Tsunefumi.
1 ACD studies: 1. Light Yield Determination for top ACD Tiles 2. Looking for holes (screws) in the ACD data Instrument Analysis Workshop VI Luis C. Reyes.
Geometry of the Tracker in the Flight Instrument The following slides present an overview of the geometry of the tracker. Dimensions corresponding to constants.
10/21/2005 Inst Ana Meeting TKR Noise Flares1 TKR Noise Flares observed in TKR #11 and #8 Mutsumi Sugizaki, Hiro Tajima, and TKR team.
GLAST CHEP 03 March R.Dubois1/17 GLAST Large Area Telescope: Overview of GLAST Offline Software Richard Dubois Stanford Linear Accelerator Center.
MAMMA data analysis Marco Villa – CERN 3 rd May 2011.
GLAST LAT ProjectMarch 24, F Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS F: On-Orbit Calibration and.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Ladder Fabrication A. Brez.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Engineering Model Tower.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
GLAST LAT Project LAT Instrument Analysis Workshop – Feb 27, 2006 Hiro Tajima, TKR Data Processing Overview 1 GLAST Large Area Telescope: TKR Data Processing.
Feb. 7, 2007First GLAST symposium1 Measuring the PSF and the energy resolution with the GLAST-LAT Calibration Unit Ph. Bruel on behalf of the beam test.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: EM Mini-Tower Robert Johnson.
Updates to Tracker Digitization Jeremy McCormick, SLAC.
Topology Relationships between features: Supposed to prevent:
GLAST Calorimeter Crystal Position Measurement Zach Fewtrell, NRL/Praxis GLAST Integration & Test Workshop SLAC July 14, 2005.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
Event Analysis for the Gamma-ray Large Area Space Telescope Robin Morris, RIACS Johann Cohen-Tanugi SLAC.
GLAST LAT Project CU Beam Test Workshop 3/20/2006 C. Sgro’, L. Baldini, J. Bregeon1 Glast LAT Calibration Unit Beam Test Status Report on Online Monitor.
Hypervelocity Impact Technology Facility (HITF)/SN3 NASA Johnson Space Center GLAST ACD Meteoroid/Debris Shielding Initial Test and Analysis Results NASA.
Tower A software alignment GLAST LAT Project Tower A software alignment 28 Jan 2005 M.Kuss, A.Brez1 Tower A software alignment 28 january 2005.
GLAST LAT Project LAT Instrument Analysis Meeting – June 30, 2006 Hiro Tajima, TKR Efficiency Trending, NRL 1 GLAST Large Area Telescope: TKR.
GLAST LAT Offline SoftwareWorkshop - SLAC, Jan , 2001 TKR Software Review -- Jan. 17, Topics for the TKR Software Review Tracy Usher, Leon.
Layer00 Efficiency Studies Stephen Levy, UChicago.
GLAST LAT Project Instrument Analysis Meeting– Feb 28, 2006 Tsunefumi Mizuno TowerTrend_ ppt 1 Tracker Parameters Trending Monitor GLAST I and.
Gamma-ray Large Area Space Telescope Tower 1 TVAC tests Bad ladders issues.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Instrument Configuration by File James Swain Stanford.
GLAST LAT Project LAT Instrument Analysis Meeting– Aug 29, 2005 Hiro Tajima, TKR Updates at SLAC 1 GLAST Large Area Telescope: TKR Updates at SLAC Hiro.
FP-CCD GLD VERTEX GROUP Presenting by Tadashi Nagamine Tohoku University ILC VTX Ringberg Castle, May 2006.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.
Mini-Tower test results
Comparison of GAMMA-400 and Fermi-LAT telescopes
The Status of the Data Analysis of the Beam Test at FZJ
GLAST LAT tracker signal simulation and trigger timing study
Integration and alignment of ATLAS SCT
GLAST Large Area Telescope:
Instrument Analysis Workshop II
LAT Test Results GLAST Large Area Telescope LAT Pre-Shipment Review
EEE telescope simulation
Mini Tower Preliminary Results
Tower A: A First Look Finding the Data: Login: THIS ONE! user: glast
GLAST Large Area Telescope:
Studies of the Time over Threshold
Analysis of GLAST Balloon Experiment Data
Presentation transcript:

GLAST LAT Project Instrument Analysis Meeting– May 27, 2005 Hiro Tajima, TKR Bad Strips 1 GLAST Large Area Telescope: TKR Bad strips analysis update Hiro Tajima (SLAC) TKR Gamma-ray Large Area Space Telescope

GLAST LAT Project Instrument Analysis Meeting– May 27, 2005 Hiro Tajima, TKR Bad Strips 2 New TKR Recon Side Effects Shadow of dead strips. –Tracking stops when no hit can be associated. Inclusion of dead strips to recon clusters. –Some dead strips appears alive. This is a feature of recon. –Not all dead strips are affected. (not understood) Digi clusters Recon clusters strip Id

GLAST LAT Project Instrument Analysis Meeting– May 27, 2005 Hiro Tajima, TKR Bad Strips 3 Cluster from Digi hits Form clusters from digi hits. Collect all clusters consistent with recon track. –Multiple clusters per layers allowed. –Requires geometry information. Tower center and layer z position can be obtained from recon clusters. Ladder gap and strip pitch is hard coded. –These parameters are very likely to be invariant. Cluster – track (mm)

GLAST LAT Project Instrument Analysis Meeting– May 27, 2005 Hiro Tajima, TKR Bad Strips 4 Result of digi clusters Digi clusters fix both problems. strip Id

GLAST LAT Project Instrument Analysis Meeting– May 27, 2005 Hiro Tajima, TKR Bad Strips 5 Utilization of Track Position Use track position “occupancy” as a reference to calculate Poisson probability for each strip. –Useful to get shape, not absolute rate. Track position Strip occupancy strip Id

GLAST LAT Project Instrument Analysis Meeting– May 27, 2005 Hiro Tajima, TKR Bad Strips 6 Layer Occupancies Under study Track position Digi clusters Recon clusters Accepted Digi clusters Plane Id