MERIT beam spot from optics (update of July 16,2008 talk) I.Efthymiopoulos – CERN, AB Dept. MERIT, VRVS Meeting September 25, 2008.

Slides:



Advertisements
Similar presentations
Matching Injector To Linac. Caveats This is all loose and fuzzy – sort of religion We dont have real tight control over and knowledge of the machine –
Advertisements

5/3/2015J-PARC1 Transverse Matching Using Transverse Profiles and Longitudinal Beam arrival Times.
J. Rudolph, Helmholtz-Zentrum Berlin EuCARD 2nd ANNUAL MEETING Slice emittance measurements at the ELBE superconducting RF photoinjector.
Cryomodule Quad Doublet Solutions – M Church 9/12/07 1 NML Cryomodule Quad Doublet Lattice Solutions  Question  Are quadrupoles required as part of the.
MERIT beam spot size Goran Skoro 15 July How to extract a beam size? z(x,y) distribution is in a saturation here 1 st approach: To fit projections*
MERIT beam spot size (Saturations & projections) Goran Skoro 13 August 2008.
Low beam intensity (MERIT beam spot size – part II) Goran Skoro 30 June 2008.
MERIT beam optics I.Efthymiopoulos – CERN, AB Dept. MERIT, VRVS Meeting July 16, 2008.
Elias Métral, COULOMB’05, Senigallia (AN), Italy, September 12-16, /29 OBSERVATION OF OCTUPOLE DRIVEN RESONANCE PHENOMENA WITH SPACE CHARGE AT THE.
Harold G. Kirk Brookhaven National Laboratory MERIT Experiment Status NFMCC Collaboration Meeting FNAL March 17-20, 2008.
Wayne R. Meier Lawrence Livermore National Lab Heavy Ion Fusion Modeling Update - Spot Size Model Changes* ARIES Meeting April 22-23, 2002 * This work.
Harold G. Kirk Brookhaven National Laboratory The MERIT High-Power Target Experiment Muon Collider Design Workshop BNL December 3-7, 2007.
Collaboration meeting, Ocotober 2005A.Fabich, CERN AB-ATBResponse from the APC, 1 MERIT beam request A.Fabich CERN AB-ATB
Report on E-165 Steve Schnetzer MCC Meeting June 28.
Thomas Roser Muon collaboration meeting February 8-10, 2002 AGS beam intensity upgrades What has been achieved Sextupole power supply upgrades Bunch manipulation.
NFMCC Meeting - 13 March 2006 I.Efthymiopoulos, A.Fabich, CERN AB-ATB-EA1 MERcury Intense Target (MERIT) Experiment Installation Issues I. Efthymiopoulos.
Super-B Factory Workshop January 19-22, 2004 Beam pipes M. Sullivan 1 Detector Beam Pipe Diameter Discussion M. Sullivan Super-B Factory Workshop Hawaii.
Beam line characterization with the TOFs1 Demonstrating the emittance-momentum matrix Mark Rayner, CM26 California, 24 March Initial.
Energy deposition of 24 GeV/c protons in gravity affected mercury jet Sergei Striganov Fermilab April 1, 2009.
MERIT beam spot size Goran Skoro 18 June How to extract a beam size? z(x,y) distribution is in a saturation here 1 st approach: To fit projections*
Harold G. Kirk Brookhaven National Laboratory Proton Beam Spot Size MERIT EVO Meeting September 10, 2008.
MERIT Autoradiographs P. Thieberger, BNL (Dec. 21, 2011)
1 August 12, 2005 Running 2mrad IR in e-e- mode: BDS constraints A.Seryi August 12, 2005.
Mark Rayner, Analysis workshop 4 September ‘08: Use of TOFs for Beam measurement & RF phasing, slide 1 Use of TOFs for Beam measurement & RF phasing Analysis.
Harold G. Kirk Brookhaven National Laboratory The High-Power Target Experiment at CERN Muon Collaboration Meeting LBNL February 16, 2005.
Analysis of ATF EXT/FF Orbit Jitter and extrapolation to IP (Data of ) ATF2 Project Meeting K. Kubo.
CTF3 commissioning status R. Corsini - CTF3 committee 17 th September 2009 Update on CTF3 Operations and schedule This time I will try to give a more complete.
Beam Instrumentations: Requirements for Proton and Electron Beams C. Bracco, E. Gschwendtner, B. Goddard, M. Meddahi, A. Petrenko, F. Velotti Acknowledgements:
MERIT analysis - Beam spot size Goran Skoro More details: UKNF Meeting, Oxford, 16 September 2008.
Emittance Growth from Elliptical Beams and Offset Collision at LHC and LRBB at RHIC Ji Qiang US LARP Workshop, Berkeley, April 26-28, 2006.
Matching recipe and tracking for the final focus T. Asaka †, J. Resta López ‡ and F. Zimmermann † CERN, Geneve / SPring-8, Japan ‡ CERN, Geneve / University.
After last meeting Matt, Riad and I discussed January energy choice…  Focus on Physics paper measurements  Focus on 5 MeV systematics  Pick “final”
Update of 3.2 km ILC DR design (DMC3) Dou Wang, Jie Gao, Gang Xu, Yiwei Wang (IHEP) IWLC2010 Monday 18 October - Friday 22 October 2010 Geneva, Switzerland.
C. Fischer – LHC Instrumentation Review – 19-20/11/2001 Gas Monitors for Transverse Distribution Studies in the LHC LHC Instrumentation Review Workshop.
J. Pasternak First Ideas on the Design of the Beam Transport and the Final Focus for the NF Target J. Pasternak, Imperial College London / RAL STFC ,
Page 1 Overview and Issues of the MEIC Interaction Region M. Sullivan MEIC Accelerator Design Review September 15-16, 2010.
Optics considerations for ERL test facilities Bruno Muratori ASTeC Daresbury Laboratory (M. Bowler, C. Gerth, F. Hannon, H. Owen, B. Shepherd, S. Smith,
Design of the Turnaround Loops for the Drive Beam Decelerators R. Apsimon, J. Esberg CERN, Switzerland.
A. Leveling - Fermilab Recent Operating Experience at the Antiproton Source Target Hall 3 rd High Power Targetry Workshop September 12, 2007 Fermilab Accelerator.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Jorg Kewisch, Dmitri Kayran Electron Beam Transport and System specifications.
MERIT review, Dec. 2005CERN AB-ATB1 CERN installation I. Efthymiopoulos, A. Fabich, J. Lettry CERN AB-ATB MERIT review, Dec.
Preliminary Design of Electron Beam line F. Velotti, C. Bracco, B. Goddard and M. Meddahi.
PSB-PS TRANSFER AT 2 GEV - CONCEPTS AND OPTICS W. Bartmann, J. Abelleira et al. ABT LIU Review, 20-Nov-15.
SL/BI 16/05/1999DIPAC’99 -- JJ Gras -- CERN SL/BI -- Adaptive Optics for the LEP 2 SR Monitors G. Burtin, R.J. Colchester, G. Ferioli, J.J. Gras, R. Jung,
1 Updated Run Plans. K.Tilley, MICO, 07/02/08 - pre-commissioning - Target, - beamline functionality - detectors, particle production - decay solenoid.
1 NFMCC Friday Meeting January 4, 2008 Optical Diagnostic Results of MERIT Experiment at CERN HeeJin Park.
Low Emittance Rings 2014 Workshop INFN-LNF, 18. September 2014 Low Emittance Studies at 3 GeV at PETRA III Joachim Keil DESY.
PRESENT AND FUTURE TEST FACILITIES FOR HIGH- INTENSITY TARGETRY CERN I.Efthymiopoulos, CERN with input from Jacques Lettry & Rende Steerenberg.
Layout and Arcs lattice design A. Chancé, B. Dalena, J. Payet, CEA R. Alemany, B. Holzer, D. Schulte CERN.
B. Marchetti R. Assmann, U. Dorda, J. Grebenyuk, Y. Nie, J. Zhu Acknowledgements: C. Behrens, R. Brinkmann, K. Flöttmann, M. Hüning,
Stopped K beam at J-PARC Designed by J.Doornbos 1)Optics design of a K0.8 branch 2)Performance 3)Pion contamination 4)Comments on K1.1 Nov. 4, 2005 Korea.
PS2 beam parameters and proposal for aperture strategy M. Benedikt , PS2 meeting1Beams and apertures, M.Benedikt.
Primary Beam Lines for the Project at CERN
Envelope tracking as a tool for low emittance ring design
Update of the SR studies for the FCCee Interaction Region
WP3 status Interaction Region design
Final Focus Synchrotron Radiation
Lecture 2 Live Feed – CERN Control Centre
LHC Emittance Measurements and Preservation
CNGS Proton Beam: Introduction

TT20 MD for the NA61/SHINE fragmented beam experiment
TT20 MDs for the NA61/SHINE fragmented beam experiment
ELENA Extra Low ENergy Antiproton Ring
MERIT beam request A.Fabich CERN AB-ATB
Present and Future test facilities for High-intensity Targetry CERN
Transverse emittance measurements from FWS
Injector Setup for G0 and HAPPEX & Lessons Learned
Hall A Beam Parameters Table
Option 1: Reduced FF Quad Apertures
Presentation transcript:

MERIT beam spot from optics (update of July 16,2008 talk) I.Efthymiopoulos – CERN, AB Dept. MERIT, VRVS Meeting September 25, 2008

MERIT Elements – Layout QFO.415s (focusing) quads 3 elements in series QDE.430s (de-focusing) quads 3 elements in series 2

Survey data after the MERIT run – September 25, 2008 Upstream face: -72.3cm 3

Beam optics Fit parameters: QFO, QDO strengths and locations (within limits) September 25, 20084

Beam envelope (1-sigma) -  =0.25 (mm.mrad), Dp=0.1% September 25, 2008 Without dispersion term  x) = 1.2mm,  y) = 1.1 mm TP With dispersion term  x) = 2.2mm,  y) = 1.1 mm TP 5

September 25, 2008 Reminder – Beam Emittance For proton machines, the emittance is measured by measuring the beam profile in a position of known beam parameters (optics) The convention is to use TWO sigma value  2  Emittance (87% of beam) Geometrical emittance:Normalized emittance: P [GeV/c] (  ) Including dispersion What is measured in the machine: 6

September 25, 2008 Beam Emittance measurement – 14 GeV/c Friday Beam intensity: h16, 1E13 7

September 25, 2008 Beam Emittance measurement – 14 GeV/c Friday Beam intensity: 2.5E11/bunch 2 extracted bunches, DT=1.7us 8

September 25, 2008 Beam Emittance measurement – 14 GeV/c Friday Beam intensity: 1.3E12/bunch 2 extracted bunches, DT=1.7us 9

September 25, 2008 Beam Emittance measurement – 24 GeV/c Friday Beam intensity: 2.5E11/bunch 16 bunches 10

September 25, 2008 Beam Emittance measurement – 24 GeV/c Friday Beam intensity: 16 bunches, 6E12 protons 11

Beam Emittance measurement Summary of measured data September 25, 2008 Using the formulas of slide #6 in good agreement with the online calculations 12

Emittance extrapolation September 25,

Estimated beam spot and density Use the extrapolated emittances to estimate the beam spot and energy density at target September 25,