SuperB Meeting Apr 06 M W Poole UK Accelerator Activity ASTeC Role and National Programme Perspectives Mike Poole ASTeC Director.

Slides:



Advertisements
Similar presentations
Cockcroft/ASTeC Joint Workshop Jan 06 M W Poole ASTeC Research Strategy Mike Poole Director.
Advertisements

Research Instrumentation Special Interest Group Sensors & Instrumentation Knowledge Transfer Network Report on American Light Source Facilities Oliver.
Page 1 Collider Review Retreat February 24, 2010 Mike Spata February 24, 2010 Collider Review Retreat International Linear Collider.
Chris Tennant Jefferson Laboratory March 15, 2013 “Workshop to Explore Physics Opportunities with Intense, Polarized Electron Beams up to 300 MeV”
ERLP Overview Hywel Owen ASTeC Daresbury Laboratory.
Nick Walker KEK-DESY meeting 7 th March 2005.
JCS e + /e - Source Development and E166 J. C. Sheppard, SLAC June 15, 2005.
Accelerator and Beam Delivery The LC-ABD (Linear Collider: Accelerator and Beam Delivery) consortium is a group of UK institutes aiming to develop new.
February 19, 2008 FACET Review 1 Lab Overview and Future Onsite Facilities Persis S. Drell DirectorSLAC.
BDS GDE context LC-ABD2 : WP4 - Beam Line Design 12 th April 2007, LC-ABD Plenary, RHUL Deepa Angal-Kalinin ASTeC, The Cockcroft Institute.
European Design Study Towards a TeV Linear Collider WP 2 : Beam Delivery System Co-ordinator: Deepa Angal-Kalinin CCLRC, Daresbury Laboratory.
ISIS, FETS and ASTeC David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ASTeC 10 Years On, Thursday 13 October.
Accelerator R&D and HL-LHC in the UK Grahame Blair Executive Director, Programmes Directorate, STFC HL-LHC 11 th November 2013.
FFAG Fixed Field Alternating Gradient synchrotrons, FFAGs, combine some of the main advantages of both cyclotrons and synchrotrons:  Fixed magnetic field.
M W PooleJoint DL-RAL Accelerator Workshop Jan 09 Introduction to ASTeC Programmes M W Poole Director.
The EMMA Project Rob Edgecock STFC Rutherford Appleton Laboratory & Huddersfield University.
Cockcroft SAC Nov 06 M W Poole ASTeC and the DL Campus Horizon Mike Poole ASTeC Director.
Electromagnetic radiation sources based on relativistic electron and ion beams E.G.Bessonov 1.Introduction 2.Spontaneous and stimulated emission of electromagnetic.
Proton driver front end test stand Plans and organisation for 2004–05 David Findlay ISIS Accelerator Division STVLTVS EST QVI ACCELERATORIBVS CVRANDIS.
UK/EU Plans for ATF2 G.A. Blair ATF2-IN2P3-KEK kick-0ff meeting, Annecy, 8 th October 2006 Overview EUROTeV UK.
The ISIS strong focusing synchrotron also at the Rutherford Appleton Laboratory. Note that ISIS occupies the same hall as NIMROD used to and re- uses some.
M W PooleASTeC Ten Years On Origins of ASTeC Mike Poole Former ASTeC Director.
Snapshot of UK graduate training Philip Burrows John Adams Institute for Accelerator Science Oxford University Philip Burrows TIARA Kickoff Meeting, CERN,
E.Elsen European LC Workshop, Cockcroft, UK, Jan 2007 Perspectives for European LC R&D.
Related poster [1] TPAG022: Slow Wave Electrode Structures for the ESS 2.5 MeV Chopper – Michael A. Clarke-Gayther Status Funding bids have been prepared.
D. Angal-KalininEUROTeV Annual Meeting, DESY WP2 : Beam Delivery System D. Angal-Kalinin ASTeC, STFC, Daresbury Laboratory 4 th EUROTeV Annual.
THE COCKCROFT INSTITUTE of ACCELERATOR SCIENCE and TECHNOLOGY John Dainton CI Jan 25/ The Cockcroft Institute John Dainton
F Project X Overview Dave McGinnis October 12, 2007.
Synchronisation Activities for 4GLS Supported by EUROFEL DS3 G J Hirst CCLRC Central Laser Facility.
Advanced Accelerator Design/Development Proton Accelerator Research and Development at RAL Shinji Machida ASTeC/STFC/RAL 24 March 2011.
J. Pozimski UKNF WP1 meeting 10 March 2010 UKNF WP1 milestone table status.
Secondary Particle Production and Capture for Muon Accelerator Applications S.J. Brooks, RAL, Oxfordshire, UK Abstract Intense pulsed.
UKNF OsC RAL – 31 st January 2011 UKNF - Status, high lights, plans J. Pozimski.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
1 of 12 Stephen Brooks JAI Advisory Board, February 2006  Neutrino Factory Muon Beam Production Studies.
FALC Technology Benefits study P. Grannis Beijing GDE meeting Feb. 7, 2007 FALC = Funding Agencies for Large Colliders is composed of representatives from.
Pavel Karataev John Adams Institute for Accelerator Science At Royal Holloway, University of London oPAC Advanced School on Accelerator Optimisation 7-11.
1 FFAG Role as Muon Accelerators Shinji Machida ASTeC/STFC/RAL 15 November, /machida/doc/othertalks/machida_ pdf/machida/doc/othertalks/machida_ pdf.
Office of Science U.S. Department of Energy 1 International Linear Collider In August 2004 ICFA announced their technology selection for an ILC: 1.The.
Non-scaling FFAGs in UK EMMA Requirement for (at least) one non-scaling FFAG clear: - multi-resonance crossings - huge/tiny momentum compaction - asynchronous.
John Womersley Welcome Director of Particle Physics, CCLRC International Scoping Study Meeting, RAL April 2006.
Project X Injector Experiment (PXIE) Sergei Nagaitsev Dec 19, 2011.
CTF3 Probe Beam G. A. Blair Royal Holloway Univ. London CTF3 Meeting, CERN 30 th November 2005 Introduction – UK Context Draft Proposal Future prospects.
NEUTRINO DETECTORS Cutting-Edge Accelerator Research for a Neutrino Factory and Other Applications Ajit Kurup for the FETS and UKNF Collaborations Cutting-Edge.
ILC/CLIC e + generation working group Jim Clarke, STFC Daresbury Laboratory and Louis Rinolfi, CERN.
WG2 (Proton FFAG) Summary G.H. Rees. Proton Driver Working Group  Participants: M. Yashimoto, S. Ohnuma, C.R. Prior, G.H. Rees, A.G. Ruggiero  Topics:
IDS-NF Accelerator Baseline The Neutrino Factory [1, 2] based on the muon storage ring will be a precision tool to study the neutrino oscillations.It may.
Introduction to the Non-Scaling Electron Model Rob Edgecock CCLRC Rutherford Appleton Laboratory For the EMMA Collaboration Motivation Basic EMMA parameters.
E.Elsen GDE Meeting, Beijing, Feb 2007 Perspectives and Planning for European LC R&D.
Commissioning and Utilisation of ERLP David Holder ASTeC, Daresbury Laboratory.
The Next Generation Light Source Test Facility at Daresbury Jim Clarke ASTeC, STFC Daresbury Laboratory Ultra Bright Electron Sources Workshop, Daresbury,
Status of Project X Keith Gollwitzer Accelerator Division Fermilab MAP Winter Meeting - March 1, 2011.
DESY. Status and Perspectives in Particle Physics Albrecht Wagner Chair of the DESY Directorate.
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
J. Corlett. June 16, 2006 A Future Light Source for LBNL Facility Vision and R&D plan John Corlett ALS Scientific Advisory Committee Meeting June 16, 2006.
UK X-FEL National Laboratory Perspective Susan Smith STFC ASTeC IoP PAB/STFC Workshop Towards a UK XFEL 16 th February 2016.
The ISIS Facility John Thomason Synchrotron Group Leader ISIS Department Rutherford Appleton Laboratory / STFC (With thanks to David Findlay) Fermilab,
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
Introduction to NS-FFAGs and EMMA Rob Edgecock STFC Rutherford Appleton Laboratory.
Overview Turkish Projects TAC / TARLA Avni Aksoy Ankara University Institute of Accelerator Technologies.
Fermilab-India Agreements and Collaboration Shekhar Mishra Project-X, International Collaboration Coodinator Fermi National Accelerator Laboratory Batavia,
Capabilities and Programmes of STFC’s Accelerator Science & Technology Centre (ASTeC)
UK Neutrino Factory Conceptual Design
Accelerator R&D for Future Neutrino Projects
Introduction to ASTeC Programmes
Accelerator R&D for Future Neutrino Projects
ILC/CLIC e+ generation working group
Accelerator Layout and Parameters
Jim Clarke ASTeC Daresbury Laboratory March 2006
WELCOME TO SOLEIL Amor Nadji On behalf of Synchrotron SOLEIL
Presentation transcript:

SuperB Meeting Apr 06 M W Poole UK Accelerator Activity ASTeC Role and National Programme Perspectives Mike Poole ASTeC Director

SuperB Meeting Apr 06 M W Poole Role of AST in CCLRC Core Business for CCLRC DL and RAL created for particle physics: NINA NIMROD 40+ years expertise in electron, proton and ion accelerators Design, build and operate Large User Facilities latterly photon and neutron sources: SRS ISIS HELIOS Develop next generation solutions DIAMOND ESS ERLP/4GLS ( ILC, NF, ……..) Underpinning R&D programmes Interdisciplinary skills plus operational scale

SuperB Meeting Apr 06 M W Poole CCLRC AST Review Major skill bases remained in ISIS and SR Departments Particle physics accelerator expertise (almost) lost Accelerator Science and Technology Centre (ASTeC) created in 2001, initially 20 staff - now ~50 staff - accelerator specialists only - £7M pa programme by 2005 Expansion stimulated by SR02 awards to CCLRC + PPARC Major development activities continue in ISIS Department, partly supported by ASTeC (~£1M pa)

SuperB Meeting Apr 06 M W Poole ASTeC Strategic Objectives Establish and consolidate UK core accelerator skills base –leadership and advice to stakeholders Ensure international competitiveness –(people + programmes) Develop future LSF –(advice, design, prototype, construction, commission) Pursue underpinning technology –(inc. experiments) Encourage significant collaborations –(HEIs + international) Promote AST inside and outside CCLRC

SuperB Meeting Apr 06 M W Poole Key Elements Underpinning design studies on future user facilities Frontier beam dynamics simulations New technology demonstrations Advanced beam test facilities Major networking with HEIs and overseas laboratories Knowledge transfer Recruitment/retention

SuperB Meeting Apr 06 M W Poole ASTeC Structure Five Groups: –Accelerator Physics (Susan Smith)(16) –Intense Beams (Chris Prior)(7) –RF and Diagnostics (Peter McIntosh)(15) –Magnetics and Radiation Sources(Jim Clarke)(7) –Vacuum Science (Joe Herbert)(6) Restrict to AST specialisms - CCLRC engineering etc New style of funded Technology Centre within CCLRC Income received also from DIAMOND, SRS, 4GLS, EU… and PPARC

SuperB Meeting Apr 06 M W Poole Themes for 21st Century Energy frontier (or efficiency) Extreme power proton drivers Ultra-high brightness electron drivers Solution (often) = New technology eg SRF

SuperB Meeting Apr 06 M W Poole Principal ASTeC Sponsored Programmes Light sources - 4GLS, FELs, ERLP Linear collider - ILC, CLIC Neutron source - generic next generation (MW), FETS Neutrino factory - MICE, design concepts, proton driver, FFAG DIAMOND design/procurement role (CDR/TDR; now greatly reduced) SRS support/development (hands-on role and training until 2008) Blue Skies (laser-plasma projects) Underpinning technology (eg undulators, NEG pumps, RF systems etc) NB Sundry smaller scale projects/collaborations include KATRIN

SuperB Meeting Apr 06 M W Poole Joint CCLRC/PPARC Programme Funded from SR02 allocations Dedicated to LC and NF (+ Accelerator Institutes) Responsive mode grants awarded to LC and NF Collaborations (CCLRC + 15 HEIs) –Birmingham Cambridge Dundee Durham Lancaster Liverpool Manchester Oxford QMUL RHUL UCL –Glasgow IC Liverpool Oxford Sheffield Warwick Funded April 04-March 07: –LC-ABD= £9.1M (PPARC) + £1.5M (CCLRC) –UK-NF= £2.0M (PPARC) NB Additional £9M on Accelerator Institutes to 2012 (<£2M this period)

SuperB Meeting Apr 06 M W Poole PPARC Award to CCLRC ( ) Total funds £4.7M(75% LC, 25% NF) Staff support £3.2M (ie ~50 sy) ASTeC gets £2.4M to cover its staff This covers both LC and NF activities NB ASTeC adds £3M to this Joint Programme (inc MICE)

SuperB Meeting Apr 06 M W Poole LC-ABD National Collaboration Linear Collider studies now organised in UK largely through LC-ABD Collaboration with HEIs ( ) Strategic decision to concentrate on Beam Delivery System Major funding initiatives (~ £11M over 3 years) ASTeC takes lead role in Beam Dynamics and in Magnet and RF Technologies. New Beam Dump topic now initiated. Further major ASTeC role in Beam Diagnostics NB Also participate in EUROTeV programme - leverage used (and extra topics)

SuperB Meeting Apr 06 M W Poole Configuration for 500 GeV machine Expandability to 1 TeV ILC Baseline Configuration (2006)

SuperB Meeting Apr 06 M W Poole LC Beam Dynamics at ASTeC ILC Baseline BDS –Mainly 2 mrad crossing studies –Final Focus optimisation design with local chromaticity correction –Compensation of higher order aberrations –Extraction line design –Collimation region design and simulations –Ground motion modelling for the linear collider Necessary beam dynamics codes for these studies have been implemented. These are PPARC funded Work Packages - HEI collaborations

SuperB Meeting Apr 06 M W Poole LC Technology at ASTeC Polarised positron source (SCM) Crab RF system(SRF) Collimation solutions Diagnostics(nm + fs) Multi-MW beam dump (just initiated) These are PPARC and CCLRC funded Work Packages - HEI collaborations NB ASTeC also funds support for SLAC ESA station master

SuperB Meeting Apr 06 M W Poole Other LC-ABD Activities Laser wire Longitudinal bunch structure Polarisation analysis Laser alignment surveyor and Stabilisation Intra--bunch fast feedback Spectrometry Led by HEIs

SuperB Meeting Apr 06 M W Poole Muon Storage Ring High current H – source Proton Driver TargetCapture Cooling Muon Acceleration ‘near’ detector (1000–3000km) ‘far’ detector (5000–8000km) ‘local’ detector Schematic Neutrino Factory

SuperB Meeting Apr 06 M W Poole NF Accelerator Challenges 5-10 MW proton beam generation Pion target survival Muon capture (and cooling ?) Muon acceleration and storage Conceptual studies have UK funding Probable EU FP7 Design Study bid ( ) UK could host ?

SuperB Meeting Apr 06 M W Poole ASTeC Neutrino Factory Studies PPARC funded programme with HEIs ASTeC conceptual studies of proton driver options (including high intensity synchrotrons) and muon accelerators High power target studies Pre-FP7 Scoping Study (joint CCLRC/PPARC initiative) Direct financing of MICE Phase 1 (and RF activities for Phase 2) International collaborations, including FFAG development These are PPARC and CCLRC funded Work Packages - HEI collaborations

SuperB Meeting Apr 06 M W Poole MICE Project Muon Ionisation Cooling Experiment Under construction at RAL

SuperB Meeting Apr 06 M W Poole ASTeC Expenditure Overview 2005/6

SuperB Meeting Apr 06 M W Poole 800 MeV protons, 200 µA, 160 kW on tungsten target ~2×10 16 neutrons/second (mean) from spallation ISIS Neutron Source At RAL site H – ion source (17 kV) 665 kV H – RFQ 70 MeV H – linac 800 MeV proton synchrotron World record

SuperB Meeting Apr 06 M W Poole Intense Neutron Source ISIS is present world record holder (160kW+) ISIS upgrade to 1 MW studied and feasible CCLRC major contribution to ESS Design Studies (multi-MW) Front End Test Stand (FETS) develops intense LE solutions –ion source LEBT (75 keV) RFQ MEBT (3 MeV) diagnostics (Linac ?) Proton driver synergy with Neutrino Factory Combined ISIS/ASTeC activity

SuperB Meeting Apr 06 M W Poole Daresbury Laboratory

SuperB Meeting Apr 06 M W Poole Daresbury SRS Concept Storage Ring Booster Linac Beamlines 80 keV 12 MeV 600 MeV World’s first dedicated x-ray source 2 GeV Synchrotron becomes a storage ring

SuperB Meeting Apr 06 M W Poole SRS Layout UK National Light Source operated since to be replaced by DIAMOND 300 mA Daily fills Pioneering magnetic insertion devices Closes down Dec 2008 !!!

SuperB Meeting Apr 06 M W Poole The Nobel Prize: F1 ATPase structure Sir John Walker won a share of the 1997 Nobel Prize for Chemistry for solving the structure of the F1 ATPase enzyme using the SRS Developed an important new technique; opens the way for new insights into metabolic and degenerative disease

SuperB Meeting Apr 06 M W Poole Alternative Compact Light Source Designed at Daresbury Sold by Oxford Instruments to IBM in lithography Operated successfully for 10 years 700 MeV

SuperB Meeting Apr 06 M W Poole The DIAMOND Project Transfer line STORAGE RING 3 GeV 24 cells Instrument BOOSTER 3 GeV LINAC 100 MeV Circumference = 560 m 5 m and 8 m straights 300 mA

SuperB Meeting Apr 06 M W Poole Linac and Booster - Dec 2005

SuperB Meeting Apr 06 M W Poole First beam in the booster Dec. 21 st 2005 DIAMOND Commissioning Milestone

SuperB Meeting Apr 06 M W Poole Storage Ring Installation - Dec 2005

SuperB Meeting Apr 06 M W Poole DIAMOND SRF Cavity (Cornell ring)

SuperB Meeting Apr 06 M W Poole DIAMOND Experimental Hall (Late 2005)

SuperB Meeting Apr 06 M W Poole Next Generation Light Source Strong UK communities exploiting existing advanced storage ring and ‘table top’ laser facilities (SRS, ESRF, CLF) DIAMOND will serve the x-ray community from 2007 (XFEL ?) Low energy (< 1 keV) requires a separately optimised source Users have identified the need to supplement transverse brightness by compression longitudinally - fs pulses Many scientific applications need multiple sources –eg pump-probe SYNERGIES: ULTRA HIGH BRIGHTNESS ELECTRON BEAMS

SuperB Meeting Apr 06 M W Poole DIAMOND Construction (late 2005)

SuperB Meeting Apr 06 M W Poole DIAMOND on RAL Site

SuperB Meeting Apr 06 M W Poole Storage Ring Limitations Equilibrium beam dimensions set by radiation emission Beam lifetime limits bunch density (10 11 turns) Demanding UHV environment Undulators restricted by cell structure and apertures Most issues worse at low energies (eg < 1 GeV) FUNDAMENTAL 3GLS LIMITATIONS

SuperB Meeting Apr 06 M W Poole Linac Based Light Source Storage ring (10 11 turns) fundamental limitations (  ) Linacs can deliver very high quality electron beams Temporal pulse pattern flexibility High average flux requires Energy Recovery Linac (ERL) Superconducting RF technology can be exploited High average brightness gun is essential development

SuperB Meeting Apr 06 M W Poole New UK Light Source Strong UK communities exploit existing storage ring and ‘table top’ laser facilities (SRS, ESRF, CLF) DIAMOND serves x-ray community from 2007 Low energy (< 1 keV) requires separately optimised source Users need to supplement high transverse brightness by compression longitudinally - fs pulses Many scientific applications need multiple sources –eg pump-probe

SuperB Meeting Apr 06 M W Poole ERL Prototype (ERLP) Project Partnership: DL (ASTeC + SRS) RAL (CLF) HEIs (Manchester/Liverpool/Strathclyde) Jefferson Lab Stanford Rossendorf Principal challenges: High brightness and intensity gun High current superconducting linac Beam transport optics (bunch compression, CSR, wakes) Diagnostics and: Lack of experience

SuperB Meeting Apr 06 M W Poole ERLP Detailed Layout Chirped beam compression ~100 fs FEL included

SuperB Meeting Apr 06 M W Poole ERLP Layout in Tower Building

SuperB Meeting Apr 06 M W Poole ERLP Progress Design challenges overcome - engineering solutions produced Construction well advanced Commissioning all systems late 2006 Experimental exploitation planning onwards

SuperB Meeting Apr 06 M W Poole Proposed 4GLS Schematic Layout

SuperB Meeting Apr 06 M W Poole 590 MeV Linac 600 MeV Dump (1 kW) XUV FEL Spent Beam Undulator Photon Beams to Experiments HHG Seed Laser 160 MeV XUV FEL Gun Bunch Compressor 3 rd Harmonic Cavity IR FEL THz Source Photon diagnostics & Filtering High Average Current Branch VUV-FEL Spontaneous Sources 750 MeV 200 MeV Bending magnet Source High Current Gun 10 MeV Dump (~1MW) 750 to 950 MeV Timing Signal IR FEL Gun XUV Injector Linac 50 MeV IR Booster Linac 15 to 50 MeV Dump (50 kW) Bunch Compressor XUV Booster Linac Outward Arc Insertion Device Beamlines Optical Delay 0 to few ns 10 MeV Photon Beams to Experiments IR for Combined Source Experiments Optical Delay Return Arc Distributed Bunch Compression Pulse Pattern in Linac Pulse Pattern in Spontaneous Branch Pulse Pattern in XUV FEL Branch 1 kHz Pulse Pattern in IR FEL Branch IR XUV FEL Branch Pulse Pattern in Photon Beams 1 kHz Pulse Pattern in Photon Beams 4GLS Multi-Source Concept

SuperB Meeting Apr 06 M W Poole Provisional 4GLS Layout

SuperB Meeting Apr 06 M W Poole 4GLS Source - International Comparison

SuperB Meeting Apr 06 M W Poole 4GLS Project Status Conceptual Design Report (CDR) - April 2006 Technical Design Report - Early 2007 Possible bid - Late 2007 Possible construction

SuperB Meeting Apr 06 M W Poole ERLP as an Accelerator Test Facility ? Chirped beam compression ~100 fs FEL included

SuperB Meeting Apr 06 M W Poole Proposed site for EMMA: e-FFAG Model Build for £4M ?

SuperB Meeting Apr 06 M W Poole 20 to 400 keV Operated at MURA in 1956 Bohr Chandrasekhar FFAGs have Ancient History

SuperB Meeting Apr 06 M W Poole Orbit excursion ~0.9m + where k=7.5 Magnets are large, complex & expensive Scaling and Non-scaling FFAG Pioneered in Japan - Scaling Type Bz(r) r r Non-scaling

SuperB Meeting Apr 06 M W Poole Electron model - baseline design done Selected lattice: - 10 to 20 MeV42 cells, doublet lattice - 37cm cell length~16m circumference - RF alternate cells1.3GHz Specification of hardware started Possible location - Daresbury EMMA

SuperB Meeting Apr 06 M W Poole 674 cells 16 turns EMMA Simulations

SuperB Meeting Apr 06 M W Poole Other Underpinning R&D Collaborations Laser based accelerator systems (with CLF and HEIs) Novel magnet systems (with EID and HEIs) Vacuum science research collaborations (inc MMU contract) Advanced RF technology (with HEIs) ca £500k pa staff costs (70% ASTeC) NB This excludes generic R&D elements of funded project programmes

SuperB Meeting Apr 06 M W Poole The Accelerator Institutes Formal ASTeC policy is to collaborate with both CI and JAI Search for synergies with broad range of ASTeC programmes ASTeC will fund 2 joint appointments (or equivalent) in each Institute ASTeC is equal partner in CI, participates fully in management and policy issues and will share building at DL in April 06 - CCLRC on CI Board. Many CI staff already housed with ASTeC on DL site Negotiations underway with JAI on joint programmes and appointments ASTeC is represented on JAI Executive Committee

SuperB Meeting Apr 06 M W Poole VISION UK to play major role in future international PP Facilities Participation via skill base and ‘in kind’ delivery AST investment for international competitiveness Maintain flexibility Crucial CCLRC role: –core skills –interdisciplinary integration –mega-technology –project management

SuperB Meeting Apr 06 M W Poole CCLRC Investment Priorities Sustainable skill base Funding of prototypes Integrated SRF design/construction/testing facility Build and operate e-FFAG Model (on ERLP) Construct e and p Accelerator Test Facilities (DL + RAL) Ramp up R&D funding prior to Capital Facility NB All of these involve HEI collaboration and cross-Council interests

SuperB Meeting Apr 06 M W Poole SRF Technology Initiative ? Maturity and applicability of superconducting RF systems including ILC - potential major UK industrial role ? Demanding superconducting RF infrastructure Integrated design, build and test (HP) - nowhere in Europe ! Collaboration ASTeC/HEIs/Industry/Faraday Partnership/NWDA Exploit Daresbury infrastructure Unsuccessful bids to PPARC etc (£10M ?)

SuperB Meeting Apr 06 M W Poole Conclusions AST in UK has recovered its international status Investment has established strong CCLRC + HEI base Career attraction needs reinforcement Programme should be broadened Evolution to prototyping will be expensive ! CCLRC/PPARC close policy cooperation is crucial