4-1 Collect & Interpret Data The Quality Improvement Model Use SPC to Maintain Current Process Collect & Interpret Data Select Measures Define Process.

Slides:



Advertisements
Similar presentations
Quality control tools
Advertisements

Displaying Data Objectives: Students should know the typical graphical displays for the different types of variables. Students should understand how frequency.
17- 1 Chapter Seventeen McGraw-Hill/Irwin © 2005 The McGraw-Hill Companies, Inc., All Rights Reserved.
1 © The McGraw-Hill Companies, Inc., 2006 McGraw-Hill/Irwin Technical Note 9 Process Capability and Statistical Quality Control.
6-1 Is Process Stable ? The Quality Improvement Model Use SPC to Maintain Current Process Collect & Interpret Data Select Measures Define Process Is Process.
Quality management: SPC II
Seven Quality Tools The Seven Tools
Histogram CA/PA-RCA : Basic Tool Bob Ollerton
Chapter 5. Methods and Philosophy of Statistical Process Control
Quality Control Chapter 8- Control Charts for Attributes
Chapter 18 Introduction to Quality
Introduction to Control Charts.
Total Quality Management Tools
8-1 Quality Improvement and Statistics Definitions of Quality Quality means fitness for use - quality of design - quality of conformance Quality is.
9-1 Improve Process Capability The Quality Improvement Model Use SPC to Maintain Current Process Collect & Interpret Data Select Measures Define Process.
4-1 Collect & Interpret Data The Quality Improvement Model Use SPC to Maintain Current Process Collect & Interpret Data Select Measures Define Process.
THE MANAGEMENT AND CONTROL OF QUALITY, 5e, © 2002 South-Western/Thomson Learning TM 1 Chapter 12 Statistical Process Control.
Statistical Process Control
Sexual Activity and the Lifespan of Male Fruitflies
Total Quality Management BUS 3 – 142 Statistics for Variables Week of Mar 14, 2011.
ISHIKAWA’S BASIC SEVEN TOOLS OF QUALITY
Defects Defectives.
Control Charts for Moving Averages
Chapter 2 Frequency Distributions and Graphs 1 © McGraw-Hill, Bluman, 5 th ed, Chapter 2.
THE MANAGEMENT AND CONTROL OF QUALITY, 5e, © 2002 South-Western/Thomson Learning TM 1 Chapter 12 Statistical Process Control.
1 Software Quality Engineering CS410 Class 5 Seven Basic Quality Tools.
Steps in Using the and R Chart
Frequency Distributions and Graphs
© 2008 Pearson Addison-Wesley. All rights reserved Chapter 1 Section 13-1 Visual Displays of Data.
Frequency Distributions and Graphs
Thinking Mathematically
Copyright © 2015 The McGraw-Hill Companies, Inc. Permission required for reproduction or display. 1 C H A P T E R T W O Frequency Distributions and Graphs.
DATA FROM A SAMPLE OF 25 STUDENTS ABBAB0 00BABB BB0A0 A000AB ABA0BA.
Lesson 7.1 Quality Control Today we will learn to… > use quality control charts to determine if a manufacturing process is out of control.
Organizing Data Section 2.1.
Control Charts for Attributes
Problem Solving.
Seven Quality Tools The Seven Tools –Histograms, Pareto Charts, Cause and Effect Diagrams, Run Charts, Scatter Diagrams, Flow Charts, Control Charts.
Slide Slide 1 Copyright © 2007 Pearson Education, Inc Publishing as Pearson Addison-Wesley. Lecture Slides Elementary Statistics Tenth Edition and the.
6Sigma Chapter 3. Six Sigma Quality: DMAIC Cycle  Define, Measure, Analyze, Improve, and Control (DMAIC)  Developed by General Electric as a means of.
Section 2.2 Bar Graphs, Circle Graphs, and Time-Series Graphs 2.2 / 1.
Measure : SPC Dedy Sugiarto.
McGraw-Hill/IrwinCopyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 2 Descriptive Statistics: Tabular and Graphical Methods.
Project Management Methodology Quality Control Diagrams Seven basic tools of quality.
Frequency, Percentage, and Proportion Statistical Based Graphical Displays.
Statistical Quality Control
McGraw-Hill/IrwinCopyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 2 Descriptive Statistics: Tabular and Graphical Methods.
Slide 1 Copyright © 2004 Pearson Education, Inc..
Quality Control  Statistical Process Control (SPC)
The seven traditional tools of quality I - Pareto chart II – Flowchart III - Cause-and-Effect Diagrams IV - Check Sheets V- Histograms VI - Scatter Diagrams.
Basic 7 Tools of Quality Presented by: Rajender Kumar, Asst. Prof.
Quality Control Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
10 March 2016Materi ke-3 Lecture 3 Statistical Process Control Using Control Charts.
Section Copyright © 2014, 2012, 2010 Pearson Education, Inc. Lecture Slides Elementary Statistics Twelfth Edition and the Triola Statistics Series.
Chapter 16 Introduction to Quality ©. Some Benefits of Utilizing Statistical Quality Methods Increased Productivity Increased Sales Increased Profits.
QUALITY CONTROL CHAPTER 8.
PROCESS CAPABILTY AND CONTROL CHARTS
How to use SPC Before implementing SPC or any new quality system, the manufacturing process should be evaluated to determine the main areas of waste. Some.
Chapter 7 Process Control.
Fundamentals of Statistical Process Control
Statistical Process Control (SPC)
Other Variable Control Charts
Effect of Measurement Error on SPC
Higher National Certificate in Engineering
Process Capability.
2-1 Data Summary and Display 2-1 Data Summary and Display.
Statistics for Business and Economics
Objectives Discuss advantages of a control chart over a run chart Describe how to set limits and revise limits on a control chart.
Histogram CA/PA-RCA : Basic Tool Bob Ollerton
The Quality Improvement Model
Presentation transcript:

4-1 Collect & Interpret Data The Quality Improvement Model Use SPC to Maintain Current Process Collect & Interpret Data Select Measures Define Process Is Process Capable ? Improve Process Capability Is Process Stable ? Investigate & Fix Special Causes No Yes No Yes Collect & Interpret Data: Displaying Measures Purpose:Begin collecting and analyzing data from the process.

4-2 Collect & Interpret Data Graphical Tools for Displaying Measures from Processes l Run Charts l Histograms l Pareto Charts

4-3 Collect & Interpret Data Run Charts l A plot of the data in time order. l Time is on the horizontal axis and the data values are plotted on the vertical axis. l Run charts show the process variation over time Day Measure

4-4 Collect & Interpret Data Histograms l A bar chart showing frequency of occurrence is shown on the vertical axis. l Histograms show the pattern of variation Frequency Measure

4-5 Collect & Interpret Data Pareto Charts l A bar chart showing the relative importance of some observed characteristic. l The frequency, percent or cost is shown on the vertical axis. l The characteristic (type of defect, cause, etc.) is shown on the horizontal axis. l The characteristic is usually plotted in order of decreasing magnitude. Frequency Cause CAEBDF

4-6 Collect & Interpret Data Pump Maintenance For each week (time period) record the number of pump failures. One possible run chart would be to plot the number of pump failures for each week (time period). The opportunity for failures should remain constant from week to week. Collect information about causes for each failure for use in a Pareto Chart. Pareto Charts could also be based on pump location, pump environment, etc. Week # FailuresFailure Type 16Seal, Align... 21Fitting, Seal... 32Align, Gear... 44Seal, Fitting Align, Seal... Pump Maintenance Pump Maintenance Pump Failure Week 1Week 2Week 3Week 4Week 20 6 failed1 failed2 failed4 failed 7 failed

4-7 Collect & Interpret Data Pump Maintenance Data Run Chart Number of Failures Week Pareto Chart SealAlignmentFittingGearOther # Failures Type Failure Frequency Histogram # Failures

4-8 Collect & Interpret Data Shipping Process Shipping On-Time Shipments Made On-Time Late On-Time For a specified time period: n = Shipments Made x = Late Shipments p = x/n A good run chart would be to plot p for each time period. A time period could be a week or month. It would also be good to collect other information about the late shipments for use in a Pareto Chart. Weekn# Late p Reason A,C,F B,F,A F,B,B B,F,I...

4-9 Collect & Interpret Data Shipping Data Run Chart Proportion LateProportion Late Week Histogram Frequency Proportion Late

4-10 Collect & Interpret Data Purchase Order Process Purchase Order Process Purchase Order Process Completed Purchase Orders 5 Purchase Orders are selected each week. The time (in days) it took to process each of the 5 PO’s is recorded, and the average of the 5 calculated. The average is the measure tracked. A possibility would be to subgroup the data( i.e. combine 5 purchase orders and plot their average.) It might also be informative to plot a histogram of all the times to see the pattern of variation. WeekABCDEAverage Week 1 Week 2 Week 3 Week 4 Week 20 2,7,5,4,5 3,10,2,5,3 5,7,3,12,1 4,7,8,3,5 3,3,9,2,4

4-11 Collect & Interpret Data Purchase Order Data Run Chart of 20 Averages (of size 5) Time (Days) Histogram of 100 total observations Time (Days) Frequency Week Sample Taken >

4-12 Collect & Interpret Data Polymer Manufacturing Process One possibility would be to collect a sample of the product every 4 hours, and measure the characteristic of interest on that sample. A run chart could then be constructed of this data. It would also be informative to plot a histogram of all the times to see the pattern of variation. Production Process Material Produced (lots) Samples A quality characteristic is measured on each sample. Sample b* b* is a measure of yellowness

4-13 Collect & Interpret Data Polymer Manufacturing Data b* Sample Run Chart Note: b* is a measure of yellowness LS is the Lower Specification Limit US is the Upper Specification Limit b* Histogram LS US