CMS week – December 8-12, 20031 TOB sensor quality Regina Demina University of Rochester.

Slides:



Advertisements
Similar presentations
January 22, Run IIB Silicon workshop Purdue University Bortoletto Daniela, Bolla Gino, Canepa Anadi Hamamatsu testing I-V characteristics up to 1000V.
Advertisements

Tracker Week – UCSB Gantry Status – April 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara Dean White.
Database entry of irradiation data PROBLEMS New form of DB data One set of data may de-qualify whole batch of sensors  composite of composite action:
US Production Report - September 4, Incandela 1 US Production Report CMS Tracker Steering Committee 4 September 2003 J. Incandela University of.
DOE REVIEW 1/20/04 – Dean White 1 Gantry Module Assembly TOB & TEC Dean White University of California, Santa Barbara.
May 13, FNAL Hybrid Thermal Test Status  Hybrid Thermal Test Procedure  Test Results Eva Medel FNAL CMS Group June 22, 2004.
Slide 1CMS Database Issues-Derek BargeDOE review, January 20, 2004 CMS Database Issues Derek Barge.
Bias Ring Current Carl Goodrich 2/26/08. Carl Goodrich- VELO Meeting2 Sensor: Measurement: IV Data from December V bias Ground.
1 CMS week 15/03/05, Module Production Meeting, Dean White - UCSB Status of Sensor Bias Connection Dean White For the US CMS Group.
4/25/2006 Puneeth Kalavase, UC, Santa Barbara On behalf of US Tracker Outer Barrel group Construction and Testing of CMS “Rods”
Test Results Highlighted Material Batches tested 6WA –263(1) 230(1) 265(2) 272(1) 273(3) (3) 305(1) (6) (2) 6WB –278(1) 279(9) 282.
Anthony AffolderUS CMS Meeting 12/3/02Previous Burn-in Experience CDF Burn-in Experience Hybrid Burn-in à 4 days with extensive tests at start/end à ~9.
1 US Testing Status-Anthony AffolderModule Testing Meeting, Dec. 11, 2003 Update of US Testing Status Anthony Affolder On behalf of the US testing group.
Status on the VELO sensors in the vacuum chamber Gwen & Ray 08/14/2007.
CMS Week – UCSB Gantry Status – June 8, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave Staszak.
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update.
Frank Hartmann --- Karlsruhe 2 nd bond test 2nd bond test pieces received from institutes sent in their 2nbond sample Torino, Wien, Karlsruhe, FNAL,
1/13/2004USCMS Tracker Meeting Sergey Korjenevski U of R Status Report IV curve and “second kink” QA stand status - R poly measurement has been debugged.
October 7, 2003 US Silicon Tracker group Sergey Korjenevski University of Rochester 1 Quality Assurance Test Stand University of Rochester oQTC at Rochester,
Database entry of irradiation data PROBLEMS New form of DB data 1. One set of data may de-qualify whole batch of sensors  composite of composite action:
Fractions, Decimals, & Percents. I. How to convert fractions to decimals There is only 1 step in these types of problems:  Take the top number of your.
CMS Tracker Week, CERN, July July 2003Tracker Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting.
Status Brussels GANTRY Ê Overview of the pilot run (second week of October) 4 aims and achievements 4 accuracy on position and angles 4 residual features.
Offline Tracker DQM Shift Tutorial. 29/19/20152 Tracker Shifts Overview Online Shifts at P5 (3/day for 24 hours coverage) – One Pixel shifter and one.
February, 2004CMS Tracker Week1 Sensor Stability Measurements Objective: find simple method of observing sensor stability -> measure fluctuations in overall.
CMS Week, CERN, Mar Mar 2004CMS Week - Module ProductionSalvatore Costa - Catania Report on Module Bonding Salvatore Costa Università di.
CMS Sensormeeting : Probestation 1: 6“ (200mm * 300mm + 360° rotation + 15mm Z) Mechanical Assembly ready Instruments: LCR, Electrometer, PS, Quasistatic.
ObservationsInferences vs.
2004/09/07 Junkichi Asai (RBRC) (Kieran Boyle (SBU))
© Hamilton Trust Keeping Up Term 2 Week 1 Day 3 Objective: Understand and convert between mixed numbers and improper fractions.
Warm Up 2 4 x ÷
Guido_Tonelli / CMS_TSC / 5 February Time stability of ST sensors The problem The sensors re-measuring campaign Failure analysis Conclusions.
Testing Site Qualification Purpose: –Perform detailed scans of the silicon microstrips to make sure they all work. –Check HPK. Candidates for Certification:
Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 1 Results from module testing E.Chabalina University of Illinois (Chicago)
WEEK 1 You have 10 seconds to name…
Run Iib Workshop Dec 12-13, 2002 Silicon sensors procurement and quality assurance WBS Regina Demina Kansas State University.
Regina Demina, Hadron collider workshop, FNAL, October 16-18, SLHC tracking issues Regina Demina, University of Rochester International Workshop.
Production Readiness Review of L0/L1 sensors for DØ Run IIb R. Demina, August, 2003 Irradiation studies of L1 sensors for DØ 2b Regina Demina University.
Sensor Testing Phil Turner. LHCb PRR - P. Turner Contents Reception Inspection Metrology Mounting Electrical tests Storage Changes since EDR Results Throughput.
Lyon Gantry Status CERN 15 Sept D. Contardo Calibration Plates and Tools Readiness for production.
Observation vs. Inferences The Local Environment.
Percents to Fractions and Decimals Review from Last Week -A percent is always a number out of % is equal to 40 out of 100 -Change a percent to a.
Hybrid & Module Testing Status
Update of US Testing Status
Results from module testing
Overview Time structure of leakage currents
FNAL Module Testing Status
Second Grade High Frequency Words Second Nine Weeks
Discoloration of Passitivation
Noise in TOB modules and sensor quality
Saturday, December 08, 2018 Decimals Division of decimals.
How it works Detection at 21 hours Time (hours)
OGP Surveying & DB Entry
Hybrid & Module Testing Status
FNAL LT Testing Status Modules – were tested during Aug 2 – Aug 9.
FNAL Hybrid Testing Status
Noise in TOB modules and sensor quality
US Module Testing Progress Report
UCSB Module Assembly Week of 12/5 – 12/9/05 Week of 12/5 – 12/9/2005.
Process of Science Observation Idea Hypothesis Experiment
ADDITIVE VS. MULTIPLICATIVE RELATIONSHIPS
FNAL Hybrid Testing Status
TOB Module Production Overview and Plan
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Module Testing Status Week of 3/14-3/18.
US Module Testing Progress Report
Bell Work December 2 – 5, 2013.
Infusion R&D at DESY TTC Meeting at TRIUMF –
FNAL Hybrid Testing Status
Presentation transcript:

CMS week – December 8-12, TOB sensor quality Regina Demina University of Rochester

CMS week – December 8-12, OutlineOutline Stability of IV Leaky strips

CMS week – December 8-12, IV vs time Current at 400V FNAL remeasurement vs DB 3/61 failed on retest 0/65 failed on retest 17/250 failed on retest

CMS week – December 8-12, IVCV no vacuum effect so far Sensor left on chuck for several hours between measurements 1 and 2. Just needed rest?

CMS week – December 8-12, I leak and I strip

CMS week – December 8-12, SummarySummary Some instability of I leak vs time is observed 2002 sensors seem to be the worst, fraction of originally passed sensors failing retests –6.8% 2003 sensors look better (but maybe not enough time) I leak increase seems to be related to leaky strip development