Project Management Aim To introduce best practice in the management of research projects outlining the need to plan, schedule and effectively control assignments.

Slides:



Advertisements
Similar presentations
Project Management.
Advertisements

Project Management Concepts
for Computing Research Projects
Project Management 6e..
Aaker, Kumar, Day Ninth Edition Instructor’s Presentation Slides
Chapter 3 Managing the Information Systems Project
Chapter 2 The Analyst As Project Manager In Managing Information Systems 2.3.
Copyright 2006 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Third Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
Appendix A © 2014 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole.
Project Management.
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project 3.1 Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
Defining the Project CHAPTER FOUR Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
McGraw-Hill/Irwin© 2008 The McGraw-Hill Companies, All Rights Reserved Defining the Project (modified for 2015) Chapter 4.
Chapter 14 INTRODUCTION TO SYSTEMS DEVELOPMENT. Systems Development Methodology Important issues in systems development: Must be aligned to business strategy.
Modern Systems Analysis and Design Third Edition
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project 3.1 Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
Project Management and Management Tools Geography 176C Thanks to: Sean Benison.
What is a project? Project Management Institute definition
Project Management 30 January. Odds and ends Tournament on the webweb In the newsnews.
Chapter 3 Managing the Information Systems Project
Managing Projects. Contemplative Questions  What does project management entail?  Do I want to be a project manager? What is the nature of the work?
4. 2Object-Oriented Analysis and Design with the Unified Process Objectives  Explain the elements of project management and the responsibilities of a.
Unit Slides by UK Versity.  Unit aims:  This unit aims to help the learner with an opportunity to develop their project management and research skills.
Engineering Design Development. Turner College and Career High School.
Chapter 14 INTRODUCTION TO SYSTEMS DEVELOPMENT. Systems Development Methodology Important issues in systems development: Must be aligned to business strategy.
Community Capacity Building Program Strategic Planning
The Operational Planning Process
Management of a Training Program January 12 – 14, 2009.
Aaker, Kumar, Day Seventh Edition Instructor’s Presentation Slides
Project Management and Scheduling
GANTT Charts. What is a GANTT chart? A Gantt chart is a type of bar chart that illustrates a project schedule. Gantt charts illustrate the start and finish.
Marketing Research Aaker, Kumar, Day and Leone Tenth Edition Instructor’s Presentation Slides.
Copyright 2002 Prentice-Hall, Inc. Managing the Information Systems Project 3.1 Chapter 3.
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
© 2006 ITT Educational Services Inc. System Analysis for Software Engineers: Unit 5 Slide 1 Chapter 3 Managing the Information Systems Project.
Computer System Analysis
Chapter 3 : Managing the Information Systems Project.
Copyright © 2009 Pearson Education, Inc. Publishing as Prentice Hall Essentials of Systems Analysis and Design Fourth Edition Joseph S. Valacich Joey F.
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall Essentials of Systems Analysis and Design Fourth Edition Joseph S. Valacich Joey F.
PRODUCTS Existing New Existing MARKETS New
 A project is “a unique endeavor to produce a set of deliverables within clearly specified time, cost and quality constraints”
Managing the Design Process Project must  Accomplish the goals - scope  Be done within resources - spending  Be done on time - scheduling.
Switch off your Mobiles Phones or Change Profile to Silent Mode.
BIS 360 – Lecture Two Ch. 3: Managing the IS Project.
Tm&i 2010 VI.1 technology management & innovation introduction to project management (ii) project planning methods & tools.
Software Project Management
McGraw-Hill/IrwinCopyright © 2008 by The McGraw-Hill Companies, Inc. All Rights Reserved. Defining the Project Chapter 4.
11/24/2015Dr. SASTRY-PROJ SOFTWARE PROJECT MANAGEMENT By Dr. M V S PERI SASTRY. B.E,Ph.D.
Project Management Cross lifecycle Activity
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project 3.1 Modern Systems Analysis and Design.
Information Systems System Analysis 421 Chapter 3 Managing the Information Systems Project.
Project Management Inspections and Reviews 1 February.
Project Management Organization Scheduling 31 January.
Copyright 2001 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Chapter 2 Managing the Information Systems Project 2.1.
1 Project Management Software management is distinct and often more difficult from other engineering managements mainly because: – Software product is.
Switch off your Mobiles Phones or Change Profile to Silent Mode.
The Marketing Plan. Executive Summary  This is at the beginning of the marketing plan and is an overview of the entire marketing plan  It briefly addresses.
The Marketing Plan. Executive Summary  This is at the beginning of the marketing plan and is an overview of the entire marketing plan  It briefly addresses.
Project Management in Marketing Deirdre Makepeace Level Verifier – Professional Diploma Assignment brief June and September 2014.
Event Project Management By: Zhou Chunlin School of Tourism, Conference and Exhibitions Henan University of Economics and Law.
Cover slide Project, course, team, date. Outline welcome  1 slide introducing the key sections/ information items in this presentation.
Project Management in Marketing Assignment briefing June and September 2013 Frank McKee Senior Examiner Professional Diploma in Marketing.
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
Tools to Help  Product flow Dependencies and relationships of deliverables  Work breakdown structure The parts  PERT charts Program Evaluation and.
Project Planning Ing. Athanasios Podaras, Ph.D Faculty of Economics Department of Informatics Technical University of Liberec.
Project Management and Management Tools
PERT & GANTT CHARTS An Introduction.
REQUIREMENTS Project management tools
Presentation transcript:

Project Management Aim To introduce best practice in the management of research projects outlining the need to plan, schedule and effectively control assignments. Structure Conceptualising the problem Research plan and proposal Gantt Charts and PERT Case Study Example: Herbal Revitalising Fruit Juice Summary and conclusions

Conceptualising the Problem Research must be cost effective if it is to be useful and effective research requires considerable planning, scheduling and control. Task 1: Get to the heart of the problem. Clear focus on issue faced. Follow Rickards (1974) technique-goal orientation approach.: Problem, Need, Obstacles & Constraints. Problem redefinition & focus on key unanswered questions.

The Research Plan and Proposal A plan is a blueprint for the design, execution and monitoring of a study. Start from unanswered questions. Secondary data Primary Data a) Select methodology: data collection method, means of analysis and sampling frame b) Data Analysis; c) Interpretation of Results; d) Presentation of results and scenario planning. Conclusions

Gantt Charts and PERT Tools to aid effective management of market research projects. PERT - Project Evaluation and Review Technique. Tool to monitor and organise resources to complete on time and within budget. PERT 3-part technique a) Planning: identify all the stages and tasks involved in the project (work packages). b) Scheduling: determine start and finish times for phases c) Controlling: Schedule to monitor progress (milestones) & outputs (deliverables).

Project Management Case Study Feasibility Study for a herbal based revitalising fruit juice A Flow Chart of the Methodology Work Package Outlines - assign responsibility SWOT Analysis FCB Grid

Example of Workpackages

Gantt Chart

Herbal based revitalising fruit juice: S.W.O.T Analysis Strengths  Perceived High quality.  Revitalising.  Natural.  Fresh.  Supermarket interest - distribution outlets.  Young professional segment positive.

Integrating Research and Promotional Activity (FCB Matrix) HABITUAL SATISFACTION INFORMATIVEAFFECTIVE >> HIGH LOW Involvement > >

Conclusions Conceptualisation of problem. For example is there a gap in the market for a low fat cereal or is the present marketing mix for Clarks’ shoes satisfactory? Specification of information required What information will best meet the research objectives? Use secondary data. If primary data collection, design method. Decide on sampling design / construction of data collection instrument. Data Collection. Analysis and interpretation of results. Communicate the findings and implications. Integrate into decision-making.