Chapter 11 Replacement Decisions

Slides:



Advertisements
Similar presentations
(c) 2001 Contemporary Engineering Economics 1 Chapter 15 Replacement Decisions Replacement Analysis Fundamentals Economic Service Life Replacement Analysis.
Advertisements

Contemporary Engineering Economics, 4 th edition, © 2007 Replacement Decisions Lecture No. 58 Chapter 14 Contemporary Engineering Economics Copyright ©
TYPES OF REPLACEMENT DECISIONS
Asst. Prof. Dr. Mahmut Ali GÖKÇE, Izmir University of Economics Spring, Replacement Basics.
Asst. Prof. Dr. Mahmut Ali GÖKÇE, Izmir University of Economics Spring, 2007 (c) 2001 Contemporary Engineering Economics 1 Replacement.
Lecture No. 47 Chapter 14 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5th edition, © 2010.
McGraw-Hill/Irwin Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights reserved. 7-0 Corporate Finance Ross  Westerfield  Jaffe Seventh Edition.
Engineering Economic Analysis Canadian Edition
Contemporary Engineering Economics, 4 th edition, © 2007 Replacement Analysis Fundamentals Lecture No. 56 Chapter 14 Contemporary Engineering Economics.
Chapter 11: Cash Flows & Other Topics in Capital Budgeting  2000, Prentice Hall, Inc.
Dealing With Uncertainty
COMPARING ALTERNATIVES
Engineering Economy IEN255 Chapter 10 - Replacement Analysis  4-6 best investment alternative  How to add profit  but what about not increasing sales,
(c) 2001 Contemporary Engineering Economics 1 Chapter 8 Annual Equivalent Worth Analysis Annual equivalent criterion Applying annual worth analysis Mutually.
Chapter 15 Replacement Decisions
Machine Replacement or Retention Pertemuan 21 s.d 22 Matakuliah: D 0094 Ekonomi Teknik Tahun: 2007.
Chapter 11 Replacement Analysis.
(c) 2001 Contemporary Engineering Economics 1 Chapter 7 Present Worth Analysis Describing Project Cash Flows Initial Project Screening Method Present Worth.
CHAPTER 9 Replacement Analysis.
Chapter 8 Annual Equivalent Worth Analysis
© 2012 by McGraw-Hill All Rights Reserved 11-1 Lecture slides to accompany Engineering Economy 7 th edition Leland Blank Anthony Tarquin Chapter 11 Replacement.
Contemporary Engineering Economics, 4 th edition, © 2007 Economic Service Life Lecture No. 57 Chapter 14 Contemporary Engineering Economics Copyright ©
ENGM 661 Engineering Economics Replacement Analysis.
Copyright ©2009 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights reserved. Engineering Economy, Fourteenth Edition By William.
Accounting Principles, Ninth Edition
Chapter 26 Part 1.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Replacement Analysis with Tax Consideration.
Comparing Mutually Exclusive Alternatives & Capital Budgetting Ref: Chapter 5 & section 10.4.
Slide Sets to accompany Blank & Tarquin, Engineering Economy, 6 th Edition, 2005 © 2005 by McGraw-Hill, New York, N.Y All Rights Reserved 6-1 Developed.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Replacement Analysis Fundamentals.
Evaluating a Single Project
Lecture No.20 Chapter 6 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5 th edition, © 2010.
1 Modeling Economic Life… Total EAC = EAC of Ownership + EAC of Operation Objective is to determine the optimum number of years to own an asset that minimizes.
8-1 Copyright  2007 McGraw-Hill Australia Pty Ltd PPTs t/a Fundamentals of Corporate Finance 4e, by Ross, Thompson, Christensen, Westerfield & Jordan.
1 Replacement Decisions How should an asset be replaced? If an asset can be overhauled and used a little longer, should those funds be invested in the.
Cost/Benefit Analysis Review Cost/Benefit can done using NPW or EAW, pick one! (choose whichever method is easiest for the problem statement) Criteria:
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Generalized Cash Flow Approach –
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Replacement Decisions Lecture No.
Slide Sets to accompany Blank & Tarquin, Engineering Economy, 6 th Edition, 2005 © 2005 by McGraw-Hill, New York, N.Y All Rights Reserved 11-1 Developed.
Lecture No. 46 Chapter 14 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5th edition, © 2010.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Applying Annual Worth Analysis Lecture.
Contemporary Engineering Economics, 4 th edition, © 2007 Applying Annual Worth Analysis Lecture No.20 Chapter 6 Contemporary Engineering Economics Copyright.
Ch 10-1 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating.
8-1 Copyright  2007 McGraw-Hill Australia Pty Ltd PPTs t/a Fundamentals of Corporate Finance 4e, by Ross, Thompson, Christensen, Westerfield & Jordan.
Project cash flow n A B Example 1: Consider the following two mutually exclusive investment projects. Assume.
Matakuliah: D0762 – Ekonomi Teknik Tahun: 2009 Replacement Analysis Course Outline 10.
Matakuliah: D0762 – Ekonomi Teknik Tahun: 2009 Annual Worth Analysis Course Outline 5.
Chapter 10 - Cash Flows and Other Topics in Capital Budgeting.
1 Replacement Decision Models Lecture No. 28 Chapter 11 Fundamentals of Engineering Economics Copyright © 2008.
3/16/2016rd1 Engineering Economic Analysis Chapter 13  Replacement Analysis.
Engineering Economic Analysis Canadian Edition
Cash Flows and Other Topics in Capital Budgeting
Chapter 6 Annual Equivalent Worth Criterion. Chapter 6 Annual Equivalence Analysis  Annual equivalent criterion  Applying annual worth analysis  Mutually.
Chapter 12 Analyzing Project Cash Flows. Copyright ©2014 Pearson Education, Inc. All rights reserved.12-2 Slide Contents Learning Objectives 1.Identifying.
Replacement Analysis and Economic Life Should we replace an asset that we own now or later?
Comparison of alternatives
Replacement Analysis Lecture No. 46 Chapter 14
Applying Annual Worth Analysis
Engineering Economics
Evaluation Alternatives Present Worth Analysis
Engineering Economy: Replacement Study
Chapter 7 Present Worth Analysis
Evaluation Alternatives Present Worth Analysis
Chapter 9: Replacement Analysis
Relevant Information and Decision Making: Production Decisions
RATE OF RETURN ANALYSIS CHAPTER 7
REPLACEMENT DECISIONS
Chapter 8 - Cash Flows and Other Topics in Capital Budgeting
OUTLINE QUESTIONS? NEWS? REMINDERS: EVALUATIONS
Presentation transcript:

Chapter 11 Replacement Decisions Replacement Analysis Fundamentals Economic Service Life Replacement Analysis When a Required Service is Long

Replacement Terminology Sunk cost: any past cost unaffected by any future decisions Trade-in allowance: value offered by the vendor to reduce the price of a new equipment Defender: an old machine Challenger: a new machine Current market value: selling price of the defender in the market place

(economic depreciation) Sunk Cost associated with an Asset’s Disposal (Example 11.1 Macintosh Printing Inc.) Original investment (printing machine) $20,000 Lost investment (economic depreciation) Market value Repair cost $10,000 $10,000 $5000 Sunk costs = $15,000 $0 $5000 $10,000 $15,000 $20,000 $25,000 $30,000

Replacement Analysis Fundamentals Replacement projects are decision problems involve the replacement of existing obsolete or worn-out assets. When existing equipment should be replaced with more efficient equipment. Examine replacement analysis fundamentals Approaches for comparing defender and challenger Determination of economic service life Replacement analysis when the required service period is long

Replacement Decisions Cash Flow Approach Treat the proceeds from sale of the old machine as down payment toward purchasing the new machine. This approach is meaningful when both the defender and challenger have the same service life. Opportunity Cost Approach Treat the proceeds from sale of the old machine as the investment required to keep the old machine. This approach is more commonly practiced in replacement analysis.

Example 11.2 Defender Challenger Market price: $10,000 Remaining useful life: 3 years Salvage value: $2,500 O&M cost: $8,000 Challenger Cost: $15,000 Useful life: 3 years Salvage value: $5,500 O&M cost: $6,000

Replacement Analysis – Cash Flow Approach Sales proceeds from defender $10,000 $5500 $2500 0 1 2 3 0 1 2 3 $6000 $8000 (a) Defender (b) Challenger $15,000

Annual Equivalent Cost - Cash Flow Approach Defender: PW(12%)D = $8,000 (P/A, 12%, 3) -$2,500 (P/F, 12%, 3) = $17,434.90 AEC(12%)D = PW(12%)D(A/P, 12%, 3) = $7,259.10 Challenger: PW(12%)C = $5,000 + $6,000 (P/A, 12%, 3) - $5,500 (P/F, 12%, 3) = $15,495.90 AEC(12%)C = PW(12%)C(A/P, 12%, 3) = $6,451.79 Replace the defender now!

Example 11.3 Comparison of Defender and Challenger Based on Opportunity Cost Approach Figure: 14-02EXM

Annual Equivalent Cost - Opportunity Cost Approach Defender: PW(12%)D = -$10,000 - $8,000(P/A, 12%, 3) + $2,500(P/F, 12%, 3) = -$27,434.90 AEC(12%)D = -PW(12%)D(A/P, 12%, 3) = $11,422.64 Challenger: PW(12%)C = -$15,000 - $6,000(P/A, 12%, 3) + $5,500(P/F, 12%, 3) = -$25,495.90 AEC(12%)C = -PW(12%)C(A/P, 12%, 3) = $10,615.33 Replace the defender now!

Economic Service Life + Minimize Ownership (Capital) cost Operating Definition: Economic service life is the remaining useful life of an asset that results in the minimum annual equivalent cost. Why do we need it?: We should use the respective economic service lives of the defender and the challenger when conducting a replacement analysis. Minimize Ownership (Capital) cost Annual Equivalent Cost + Operating cost

Economic Service Life Continue…. Capital cost have two components: Initial investment (I) and the salvage value (S) at the time of disposal. The initial investment for the challenger is its purchase price. For the defender, we should treat the opportunity cost as its initial investment. Use N to represent the length of time in years the asset will be kept; I is the initial investment, and SN is the salvage value at the end of the ownership period of N years. The operating costs of an asset include operating and maintenance (O&M) costs, labor costs, material costs and energy consumption costs.

Mathematical Relationship Objective: Find n* that minimizes total AEC AE of Capital Cost: AE of Operating Cost: Total AE Cost:

AEC OC (i) CR(i) n*

Example 11.4 Economic Service Life for a Lift Truck

Steps to Determine an Economic Service Life N = 1 (if you replace the asset every year) AEC1 = $18,000(A/P, 15%, 1) + $1,000 - $10,000 = $11,700

N = 2 (if you replace the asset every other year) AEC2 = [$18,000 + $1,000(P/A, 15%, 15%, 2)](A/P, 15%, 2) - $7,500 (A/F, 15%, 2) = $8,653

AEC if the Asset were Kept N Years N = 3, AEC3 = $7,406 N = 4, AEC4 = $6,678 N = 5, AEC5 = $6,642 N = 6, AEC6 = $6,258 N = 7, AEC7 = $6,394 Minimum cost If you purchase the asset, it is most economical to replace the asset for every 6 years Economic Service Life

Required Assumptions and Decision Frameworks Now we understand how the economic service life of an asset is determined. The next question is to decide whether now is the time to replace the defender. Consider the following factors: Planning horizon (study period) By planning horizon, it is mean that the service period required by the defender and a sequence of future challengers. The infinite planning horizon is used when we are unable to predict when the activity under consideration will be terminated. In other situation, the project will have a definite and predictable duration. In these cases, replacement policy should be formulated based on a finite planning horizon.

Decision Frameworks continue……. Technology Predictions of technological patterns over the planning horizon refer to the development of types of challengers that may replace those under study. A number of possibilities exist in predicting purchase cost, salvage value, and operating cost as dictated by the efficiency of the machine over the life of an asset. If we assume that all future machines will be same as those now in service, there is no technological progress in the area will occur. In other cases, we may explicitly recognize the possibility of future machines that will be significantly more efficient, reliable, or productive than those currently on the market. (such as personal computers) Relevant cash flow information Many varieties of predictions can be used to estimate the pattern of revenue, cost and salvage value over the life of an asset. Decision Criterion The AE method provides a more direct solution when the planning horizon is infinite (endless). When the planning horizon is finite (fixed), the PW method is convenient to be used.

Replacement Strategies under the Infinite Planning Horizon Compute the economic lives of both defender and challenger. Let’s use ND* and NC* to indicate the economic lives of the defender and the challenger, respectively. The annual equivalent cost for the defender and the challenger at their respective economic lives are indicated by AED* and AEC* . Compare AED* and AEC*. If AED* is bigger than AEC*, we know that it is more costly to keep the defender than to replace it with the challenger. Thus, the challenger should replace the defender now. If the defender should not be replaced now, when should it be replaced? First, we need to continue to use until its economic life is over. Then, we should calculate the cost of running the defender for one more year after its economic life. If this cost is greater than AEC* the defender should be replaced at the end of is economic life. This process should be continued until you find the optimal replacement time. This approach is called marginal analysis, that is, to calculate the incremental cost of operating the defender for just one more year.

Example 11.5 Relevant Cash Flow Information (Defender) Figure: 14-07EXM

ECONOMIC SERVICE LIFE OF DEFENDER General equation for AE calculation for the defender is as follows: AE (15%) = $6,200(A/P, 15%, N) + 2000 + $1,500 (A/G, 15%, N) – 1,000 (5 – N) (A/F, 15%, N) for N = 1,2,3,4, and 5 Cash flow diagram for defender When N = 4 years

ECONOMIC SERVICE LIFE OF DEFENDER AE (15%)1 = $6,200 (A/P, 15%, 1) + 2000 + $1,500 (A/G, 15%, 1) – 1,000 (5 – 1) (A/F, 15%, 1) AE (15%)1 = 7,130 + 2,000 + 0 – 4,000 = $5,130 OR CR (15%)N = I (A/P, 15%, N) – SN (A/F, 15%, N) AEOC =Σ [OCn (P/F, 15%, N)] (A/P, 15%, N) CR (15%)1 = 6,200 (1.15) – 4,000 (1.0) = 7,130 – 4,000 = $3,130 AEOC1 = 2,000 (0.8696) (1.15) = 1739.2 x (1.15) = $2,000 Σ AE1 = CR (15%)1 + AEOC1 = 3,1,30 + 2,000 = $5,130

Objective is : Find n* that minimizes total AEC AE of Capital Cost: AE of Operating Cost: Total AE Cost:

N = 2 Σ AE2 = CR (15%)2 + AEOC2 = 2,418.32 + 2,697.55 = $5,116 AE (15%)2 = $6,200 (A/P, 15%, 2) + 2000 + $1,500 (A/G, 15%, 2) – 1,000 (5 – 2) (A/F, 15%, 2) AE (15%)2 = 3,813.62 + 2,000 + 697.65 – 1,395.3 = $5,116 OR CR (15%)2 = I (A/P, 15%, 2) – S2 (A/F, 15%, 2) CR (15%)2 = 6,200 (0.6151) – 3,000 (0.4651) = $2,418.32 AEOC2 =Σ [ OC1 (P/F, 15%, 1) + OC2 (P/F, 15%, 2) ] (A/P, 15%, 2) AEOC2 = [2,000 (0.8696) + 3,500 (0.7561)] (0.6151) = $2,697.55 Σ AE2 = CR (15%)2 + AEOC2 = 2,418.32 + 2,697.55 = $5,116

Σ AE3 = CR (15%)3 + AEOC3 = 2,139.6 + 3,360.7 = $5,500 N = 3 AE (15%)3 = $6,200 (A/P, 15%, 3) + 2000 + $1,500 (A/G, 15%, 3) – 1,000 (5 – 3) (A/F, 15%, 3) AE (15%)3 = 2,715.6 + 2,000 + 1,360.65 – 576 = $5,500 OR CR (15%)3 = I (A/P, 15%, 3) – S3 (A/F, 15%, 3) CR (15%)3 = 6,200 (0.4380) – 2,000 (0.2880) = $2,139.6 AEOC3 =Σ [ OC1 (P/F, 15%, 1) + OC2 (P/F, 15%, 2) + OC3 (P/F, 15%, 3) ] x (A/P, 15%, 3) AEOC3 = [2,000 (0.8696) + 3,500 (0.7561) + 5,000 (0.6575)] (0.6151) AEOC3 = $3,360.7 Σ AE3 = CR (15%)3 + AEOC3 = 2,139.6 + 3,360.7 = $5,500

Σ AE4 = CR (15%)4 + AEOC4 = 1,971.56 + 3,989.75 = $5,961 N = 4 AE (15%)4 = $6,200 (A/P, 15%, 4) + 2000 + $1,500 (A/G, 15%, 4) – 1,000 (5 – 4) (A/F, 15%, 4) AE (15%)4 = 3,813.62 + 2,000 + 697.65 – 1,395.3 = $5,961 OR CR (15%)4 = I (A/P, 15%, 4) – S4 (A/F, 15%, 4) CR (15%)4 = 6,200 (0.3503) – 1,000 (0.2003) = $1,971.56 AEOC4 =Σ [ OC1 (P/F, 15%, 1) + OC2 (P/F, 15%, 2) + OC3 (P/F, 15%, 3) + OC4 (P/F, 15%, 4)] x (A/P, 15%, 4) AEOC4 = [2,000 (0.8696) + 3,500 (0.7561) + 5,000 (0.6575) + 6,500 (0.5718) ] x (0.6151) AEOC4 = $3,989.75 Σ AE4 = CR (15%)4 + AEOC4 = 1,971.56 + 3,989.75 = $5,961

ECONOMIC SERVICE LIFE OF DEFENDER AE (15%) 5 = $6,200 (A/P, 15%, 5) + 2000 + $1,500 (A/G, 15%, 5) – 1,000(5 – 5) (A/F, 15%, 3) AE (15%)5 = 1,849.46 + 2,000 + 2,584.2 + 0 = $6,434 OR CR (15%)5 = I (A/P, 15%, 5) – S5 (A/F, 15%, 5) CR (15%)5 = 6,200 (0. 2983) – 0 (0.1483) = $1,850 AEOC5 =Σ [ OC1 (P/F, 15%, 1) + OC2 (P/F, 15%, 2) + OC3 (P/F, 15%, 3) + OC4 (P/F, 15%, 4) + OC5 (P/F, 15%, 5)] x (A/P, 15%, 5) AEOC5 = [2,000 (0.8696) + 3,500 (0.7561) + 5,000 (0.6575) + 6,500 (0.5718) + + 8,000 (0.4972)] x (0.2983) AEOC5 = $4,584 Σ AE5 = CR (15%)5 + AEOC 5 = 1,850 + 4,584 = $6,434

For N = 1 to 5, the results are as follows: N = 1: AE (15%) = $5,130 N = 2: AE (15%) = $5,116 N = 3: AE (15%) = $5,500 N = 4: AE (15%) = $5,961 N = 5: AE (15%) = $6,434 When N = 2 years, we get the lowest AE value. Thus the defender’s economic life is two years.

AEC as a Function of the Life of the Defender (Example 11.5) Figure: 14-08

ECONOMIC SERVICE LIFE OF CHALLENGER (Example 11.5) Investment cost = $10,000 Salvage value N = 1: $6,000 N > 1: decreases at a 15% over previous year Operating cost N = 1: $2,000 N > 1: increases by $800 per year (G = $800) Rate of return 15%

ECONOMIC SERVICE LIFE OF CHALLENGER General equation for AE calculation for the challenger is as follows: AE (15%)N = $10,000(A/P, 15%, N) + 2000 + $800 (A/G, 15%, N) – $6,000(1 – 15%)N-1 (A/F, 15%, N) for N = 1,2,3,4, and 5  N =1 AE (15%)1 = $10,000(A/P, 15%, 1) + 2000 + $800 (A/G, 15%, 1) – $6,000(0.85)1-1 (A/F, 15%, 1) AE (15%)1 = 11500 + 2,000 + 0 – 6,000 = $7,500 OR CR (15%)N = I (A/P, 15%, N) – SN (A/F, 15%, N) AEOC =Σ [OCn (P/F, 15%, N)] (A/P, 15%, N) CR (15%)1 = 10,000 (1.15) – 6,000 (1.0) = 11,500 – 6,000 = $5,500 AEOC1 = 2,000 (0.8696) (1.15) = 1739.2 x (1.15) = $2,000 Σ AE1 = CR (15%)1 + AEOC1 = 3,130 + 2,000 = $7,500

N =2 Σ AE2 = CR (15%)2 + AEOC2 = 2,418.32 + 2,697.55 = $6,151 AE (15%)2 = $10,000(A/P, 15%, 2) + 2000 + $800 (A/G, 15%, 2) – $6,000(0.85)2-1 (A/F, 15%, 2) AE (15%)1 = 6151 + 2,000 + 372.08 – 2,372 = $6,151 OR CR (15%)2 = I (A/P, 15%, 2) – S2 (A/F, 15%, 2) CR (15%)2 = 10,000 (0.6151) – 5,100 (0.4651) = $3,779 AEOC2 =Σ [ OC1 (P/F, 15%, 1) + OC2 (P/F, 15%, 2) ] (A/P, 15%, 2) AEOC2 = [2,000 (0.8696) + 2,800 (0.7561)] (0.6151) = $2,372 Σ AE2 = CR (15%)2 + AEOC2 = 2,418.32 + 2,697.55 = $6,151

Σ AE3 = CR (15%)3 + AEOC3 = 2,139.6 + 3,360.7 = $5,857 N =3 AE (15%)3 = $10,000(A/P, 15%, 3) + 2000 + $800 (A/G, 15%, 3) – $6,000(0.85)3-1 (A/F, 15%, 3) AE (15%)3 = 4380 + 2,000 + 625.68 – 1,248.48 = $5,857 OR CR (15%)3 = I (A/P, 15%, 3) – S3 (A/F, 15%, 3) CR (15%)3 = 10,000 (0.4380) – 4335 (0.2880) = $3,132 AEOC3 =Σ [ OC1 (P/F, 15%, 1) + OC2 (P/F, 15%, 2) + OC3 (P/F, 15%, 3) ] x (A/P, 15%, 3) AEOC3 = [2,000 (0.8696) + 2,800 (0.7561) + 3,600 (0.6575)] (0.4380) AEOC3 = $2,725 Σ AE3 = CR (15%)3 + AEOC3 = 2,139.6 + 3,360.7 = $5,857

Σ AE4 = CR (15%)4 + AEOC4 = 2,765 + 3,061 = $5,826 N =4 AE (15%)4 = $10,000(A/P, 15%, 4) + 2000 + $800 (A/G, 15%, 4) – $6,000(0.85)4-1 (A/F, 15%, 4) AE (15%)4 = 3,503 + 2,000 + 1,061.04 – 738 = $5,826 OR CR (15%)4 = I (A/P, 15%, 4) – S4 (A/F, 15%, 4) CR (15%)4 = 10,000 (0.3503) – 3,685 (0.2003) = $2,765 AEOC4 =Σ [ OC1 (P/F, 15%, 1) + OC2 (P/F, 15%, 2) + OC3 (P/F, 15%, 3) + OC4 (P/F, 15%, 4)] x (A/P, 15%, 4) AEOC4 = [2,000 (0.8696) + 2,800 (0.7561) + 3,600 (0.6575) + 4,400 (0.5718) ] x (0.3503) AEOC4 = $3,061 Σ AE4 = CR (15%)4 + AEOC4 = 2,765 + 3,061 = $5,826

Σ AE5 = CR (15%)5 + AEOC 5 = 2,519 + 3,378 = $5,897 N =5 AE (15%)5 = $10,000(A/P, 15%, 5) + 2000 + $800 (A/G, 15%, 5) – $6,000(0.85)5-1 (A/F, 15%, 5) AE (15%)5 = 2,983 + 2,000 + 1378.24 – 464.48 = $5,897 OR CR (15%)5 = I (A/P, 15%, 5) – S5 (A/F, 15%, 5) CR (15%)5 = 10,000 (0. 2983) – 3,132 (0.1483) = $2,519 AEOC5 =Σ [ OC1 (P/F, 15%, 1) + OC2 (P/F, 15%, 2) + OC3 (P/F, 15%, 3) + OC4 (P/F, 15%, 4) + OC5 (P/F, 15%, 5)] x (A/P, 15%, 5) AEOC5 = [2,000 (0.8696) + 2,800 (0.7561) + 3,600 (0.6575) + 4,400 (0.5718) + 5,200 (0.4972)] x (0.2983) AEOC5 = $3,378 Σ AE5 = CR (15%)5 + AEOC 5 = 2,519 + 3,378 = $5,897

The economic service life of the challenger is four years. N = 1 year: AE(15%) = $7,500 N = 2 years: AE(15%) = $6,151 N = 3 years: AE(15%) = $5,857 N = 4 years: AE(15%) = $5,826 N = 5 years: AE(15%) = $5,897 The economic service life of the challenger is four years. NC*=4 years AEC*=$5,826

Replacement Decisions Should replace the defender now? No, because AECD < AECC If not, when is the best time to replace the defender? Need to conduct the marginal analysis. NC*= 4 years AEC*=$5,826

Marginal Analysis – When to Replace the Defender Question: What is the additional (incremental) cost for keeping the defender one more year from the end of its economic service life, from Year 2 to Year 3? Financial Data: Opportunity cost at the end of year 2: $3,000 (market value of the defender at the end year 2) Operating cost for the 3rd year: $5,000 Salvage value of the defender at the end of year 3: $2,000

Step 1: Calculate the equivalent cost of retaining the defender one more from the end of its economic service life, say 2 to 3. $3,000 (F/P,15%,1) + $5,000 - $2,000 = $6,450 Step 2: Compare this cost with AEC = $5,826 of the challenger. Conclusion: Since keeping the defender for the 3rd year is more expensive than replacing it with the challenger, DO NOT keep the defender beyond its economic service life. $2000 2 3 $3000 $5000 2 3 $6,450