CMS Hadron Calorimeter

Slides:



Advertisements
Similar presentations
DCS meeting, CERN, 17 June 2002Børge Svane Nielsen, NBI1 Forward Detectors DCS Forward Detectors (FWD): T0- quartz Cherenkov V0 - plastic scintillator.
Advertisements

HCAL RBX PRR Overview Jim Freeman RBX PRR March 1-2, 2001.
CMS Outer Hadron Calorimeter (HO) Project Naba K Mondal Tata Institute, Mumbai, India.
Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, HCAL Status CMS HCAL Status Jim Freeman.
TileCal Electronics A Status Report J. Pilcher 17-Sept-1998.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
CMS Week Sept 2002 HCAL Data Concentrator Status Report for RUWG and Calibration WG Eric Hazen, Jim Rohlf, Shouxiang Wu Boston University.
USCMS/Rochester. Oct 20, 2001HCAL TriDAS1 HCAL TPG and Readout CMS HCal meeting at Rochester Oct Oct 2001 Tullio Grassi, Drew Baden University of.
CMS/CERN. Nov, 2001HCAL TriDAS1 HCAL Fiber Link Issues Use of CMS Tracker Fiber Links Drew Baden University of Maryland John Elias Fermilab.
Andris Skuja: US CMS Annual DOE/NSF Review, May 19, CMS HCAL Report US CMS HADRON CALORIMETER REPORT Andris Skuja University of Maryland US CMS Annual.
CMS WeekDec 2002E. Hazen HF Electronics Status Report E. Hazen, J. Rohlf, E. Machado Boston University.
Status of the Optical Multiplexer Board 9U Prototype This poster presents the architecture and the status of the Optical Multiplexer Board (OMB) 9U for.
06-Dec-2004 HCAL TriDAS 1 TriDAS Status HF Luminosity HF Trigger Slicing.
RBX PRR - March 1-2, H C A L HCAL RBX PRR Readout Box (RBX) PRR Dan Green HCAL Project Manager.
CMS Experiment CMS Hadron Calorimeter - Arie Bodek
HCAL RBX for HB, HE, and HO Status and Planning R. Ruchti Department of Physics University of Notre Dame Notre Dame, IN USA.
Andris Skuja: US CMS DOE/NSF Review: HCAL Subsystem Session May 20, 2003: Schedule, etc. 1 WBS 2 - Hadron Calorimeter Andris Skuja HCAL Schedule at CERN.
CMS/CERN. Nov, 2001HCAL TriDAS1 HCAL TPG and Readout CMS HCAL Readout Status CERN Tullio Grassi, Drew Baden University of Maryland Jim Rohlf Boston University.
Drew Baden, UMD Nov HCAL Trigger/Readout CMS/Tridas November 2000 Drew Baden, Tullio Grassi University of Maryland.
HCAL FIT 2002 HCAL Data Concentrator Status Report Gueorgui Antchev, Eric Hazen, Jim Rohlf, Shouxiang Wu Boston University.
Lab5 Production Status: Optics and RBX integration Pawel de Barbaro U. of Rochester.
E. Hazen, Boston University BU Meeting, Apr. 6, 2001 Front-end Readout of the CMS Hadronic Forward Calorimeter (HF) Conceptual Design (Summary) by Eric.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
AHCAL – Electromechanical Integration EUDET annual meeting – Paris Oct M. Reinecke.
21 January 2003Paul Dauncey - UK Electronics1 UK Electronics Status and Issues Paul Dauncey Imperial College London.
TRIGGER-LESS AND RECONFIGURABLE DATA ACQUISITION SYSTEM FOR POSITRON EMISSION TOMOGRAPHY Grzegorz Korcyl 2013.
October 2002US CMS HCAL at BU1 US CMS HCAL Meeting Boston University Vasken Hagopian Florida State University.
DOE/NSF Review of the U.S. ATLAS Construction Project June 3-4, 2002 WBS 1.1 Silicon Subsystem Abe Seiden UC Santa Cruz.
M. Lo Vetere 1,2, S. Minutoli 1, E. Robutti 1 1 I.N.F.N Genova, via Dodecaneso, GENOVA (Italy); 2 University of GENOVA (Italy) The TOTEM T1.
September 8-14, th Workshop on Electronics for LHC1 Channel Control ASIC for the CMS Hadron Calorimeter Front End Readout Module Ray Yarema, Alan.
CALOR2006 June 7, Julie Whitmore Fermilab Overview of the CMS Hadron Calorimeter.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
HPD Development Project is DONE! The Future is Quality assurance Database management Alignment Production of cookies and mounts Electronics interfacing.
CPT Week, April 2001Darin Acosta1 Status of the Next Generation CSC Track-Finder D.Acosta University of Florida.
CMX status and plans Yuri Ermoline for the MSU group Level-1 Calorimeter Trigger Joint Meeting CERN, October 2012,
Background Physicist in Particle Physics. Data Acquisition and Triggering systems. Specialising in Embedded and Real-Time Software. Since 2000 Project.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
CSC ME1/1 Upgrade Status of Electronics Design Mikhail Matveev Rice University March 28, 2012.
U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS1 CMS Project at UR Pawel de Barbaro University of Rochester DoE Review July 15-16, 2002.
Kavita Lalwani, Pooja Saxena, Kirti Ranjan, Ashutosh Bhardwaj Department of Physics & Astrophysics University of Delhi Manoj Sharan High Energy Nuclear.
Motivation General rule for muon triggers: Never neglect a possible backup reduction factor. It will always come back to you. Even if RPC trigger works.
GlueX electronics Collaboration Meeting December, 2003 Paul Smith.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
1 US CMS DOE/NSF Review: May 8-10, WBS 4.0 The Electromagnetic Calorimeter Roger Rusack The University of Minnesota US-CMS L2 ECAL Manager.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
1 H C A L S.Sergueev, NEC2001, Varna, September 2001 CMS HCAL Slow Control System for the CMS Hadron calorimeter S.Sergueev, FNAL/JINR CMS HCAL.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
US CMS DOE/NSF Review: April 11-13, Trig. - Estimate to Complete.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
H C A L 11 th International Conference on Advanced Technology and Particle Physics Villa Olmo (Como - Italy), October 5 - 9, 2009 THE PERFORMANCE OF THE.
Plans and Progress on the FPGA+ADC Card Pack Chris Tully Princeton University Upgrade Workshop, Fermilab October 28, 2009.
MINER A at the Triple Point: Three Phases at once Deborah Harris AEM August 31, 2009.
1 hcal installation and commissioning status pawel de barbaro, vitali smirnov, june 11, 2007.
Feb 2002 HTR Status CMS HCal meeting at FIT Feb. 7-9, 2002 Tullio Grassi University of Maryland.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
CMS-UK Oversight Committee 17/11/06 D.J.A. Cockerill - RAL 1 The CMS Electromagnetic Calorimeter UK Responsibilities Procurement and testing of VPTs Design.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
25 Sept 2001Tullio Grassi From MAPLD2001 ( space community conference ) Major causes of failures.
29/05/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
HF ROBOX PRR3 Apr 2003E. Hazen HF Front-End Electronics ● System Description – Overview – PMT Board, ROBOX, Patch Panel – Signal Cable, Front-end boards.
The CMS HCAL Data Concentrator: A Modular, Standards-based Design
EURONu Collaboration Board,
The CMS HCAL Data Concentrator: A Modular, Standards-based Design
HCAL Data Concentrator Production Status
The CMS HCAL Data Concentrator: A Modular, Standards-based Design
Introduction HCAL Front-End Readout and Trigger Joint effort between:
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
USCMS HCAL FERU: Front End Readout Unit
HCAL DAQ Interface Eric Hazen Jim Rohlf Shouxiang Wu Boston University
Presentation transcript:

CMS Hadron Calorimeter Andris Skuja Lv.2 HCAL Project Manager’s Overview US CMS Annual Meeting Riverside, California May 19, 2001

System Overview HCAL: US does all of HB and optical cables, transducers, front end and readout electronics for HO, HE and HF. HO HB HF HE

US HCAL Responsibilities The US construction responsibilities for all HCAL subdetectors are well defined: HB: absorber, megatile production (optics), optical cables & connectors, readout boxes, photodetectors (HPD’s), front end electronics, trigger/DAQ electronics, power supplies, controls: US CMS HE brass (75%) & scintillator acquisition (only): US CMS HE optical cables (materials) & connectors, readout boxes, photodetectors (HPD’s), front end electronics, trigger/DAQ electronics, power supplies, controls: US CMS HO readout boxes, photodetectors, front end electronics, trigger/DAQ electronics, power supplies, controls: US CMS HF and HF shielding mechanical design: US CMS HF quartz fiber (Plastic cladding): US CMS HF readout boxes, photomultipliers, front end electronics, trigger/DAQ electronics, power supplies, controls: US CMS

Non-US Responsibilities Responsibilities of CMS collaborators HE: absorber manufacture, megatile production (optics) : R/DMS HO installation brackets & tooling, megatiles (including scintillator), optical cables & connectors: India HF absorber manufacture and installation tooling: Russia HF shielding, support structure: CERN, Russia, Turkey, Iran HF quartz fiber installation: Hungary HB/HE/HF: HV Supply Engineering: Bulgaria

Absorber & Tooling The HB Absorber Team is headed by Jim Freeman Two HB prototype wedges (PPP1 and PPP2) have been manufactured and delivered to CERN. All HB- wedges are complete and their assembly tested. Twelve HB+ wedges are finished and six more are in the final machining phase. All 18 HB+ wedges await final test assembly at Felguera in June/July 2001. All HB Installation Tooling is close to being finished at Felguera of Spain. The chief mechanical engineer for the design and fabrication of the absorber and installation tooling is Igor Churin (FNAL). He is aided by 3 Guest Engineers (Yuri Orlov, Valeri Polubotko and Vladimir Siderov). Igor Churin will oversee the HB- and HB+ assembly at CERN (2 months in 2001 and 2 months in 2002).

Barrel HCAL

HB- Absorber HB- absorber is complete. It passed all QC tests and has been disassembled and shipped to CERN.

HB- at CERN HB- wedges and scintillator crates in Bldg 186 at CERN. Scintillators will be installed into wedges in June.

Interior of cryostat Rail support Interior of vacuum vessel for superconducting magnet. The HBs rest on the rail.

HB+ 12 of 18 HB+ Wedges are complete Cradle and tooling ready HB+ will be complete by end of July, ahead of schedule

Cable block stabilizer HCAL Tooling Completed: Cradles, spiders, lifting fixture, support beams Left to do: Tie rods, stabilizer Cable block stabilizer Tie rods Spider Cradle Riser Support Beam

The Optical System The HB megatiles are being fabricated at FNAL in Labs 5 & 8 Pawel de Barbaro (Rochester) has overall production responsibility for the optical system Readout Fiber (Pigtail) Assembly in Lab 5 is supervised by Howard Budd (Rochester). The lead technical personnel are Jim Blomquist, Todd Nebel and Ewa Skup. The 14 full time production personnel include Russian (2) and Chinese (2) visitors allowing for quality control transfer to our colleagues abroad. PPP1 & PPP2 megatiles have been delivered to CERN. More than 80% of the megatiles for HB- and HB+ are finished and many have been shipped to CERN as well. We are on schedule for megatile production being finished in September of 2001. Optical cable is being manufactured by UIC (Mark Adams). This task will be finished in June of ‘01.

Megatile design, top view Components are the machined scintillator plates, cover plates, fiber assembly (WLS spliced to clear fiber, optical connector) pigtails

Megatile cross-sectional view

HCAL Optics Factory Status: May, 2001

Readout Boxes (RBX’s) US CMS is responsible for the Readout Boxes (RBX’s) for all HCAL subsystems (HB,HO,HE,HF) . The light signals from the scintillator tile layers are summed optically in the Boxes to form Calorimeter towers. A new design now exists for HB and HE RBX’s that is modular and can co-exist with the services surrounding HE and HB. The box shell contains a backplane and a cooling circuit. HPD RM’s (Readout Modules) containing a 19-channel or a 73-channel HPD and its corresponding ODU (Optical Decoder Unit) are plugged into the box. It also contains a Calibration Unit and a Clock & Control Module (CCM) as well as HV/LV plug-ins. Randy Ruchti of Notre Dame is leading the design and fabrication team of this complex item. At Notre Dame he is assisted by Barry Baumbaugh (EE) and Jeffrey Marchant. Jim Reidy is leading the Mississippi effort to fabricate HE Box shells. Mark Adams and the UIC group are fabricating optical “pigtails” for the ODU’s.

HB RBX Detail View

HB RBX Full RBX with 19 ch RMs RBX Interior -- HV distributor and backplane

RBX Readout Module The readout module (RM) integrates the HPD, front end electronics, and digital optical drivers. Electronics cards HPD Mount HV Interface Card Optical Sorter

Photodetectors The photodetectors for the optical readout of HB, HE and HO are DEP Hybrid Photodetectors (HPD’s) with either 19 or 73 pixel readout. They reside in the Readout Boxes, aligned with the 4T magnetic field. The H1 signals are directed to the 73 pixel HPD’s, while the H2 signals are routed to the 19 pixel HPD’s. Towers with multiple readouts may be processed by either tube type. We are studying the necessity of an independent H1 readout. Eliminating it could realize savings of about $1 million and add time contingency to the project. Prisca Cushman of Minnesota is responsible for the HPD procurement , characterization and testing. She is assisted by electronics/optical engineer Arjan Heering. Sergey Los & Anatoly Ronzhin of Fermilab have measured the HPD response at high frequencies. High Frequency cross-talk was observed in ‘99 as were a number of HV problems. These have been solved, one step taken being the aluminization of the diodes. This step contributed to optical cross talk (real photon back scattering) which had to be reduced by 1/4 wavelength coating. We have discovered no new problems and pre-production prototypes will be ready by Fall ‘01.

The Hybrid Photodiode Tube Fabrication by Delft Electronic Products (Netherlands) Subcontracts: Canberra (Belgium) 22% for diodes Schott Glass (USA) 8% for fiber optic windows Kyocera (Japan) 4% for vacuum feedthru/ceramic carrier CMS Design 19 x 5.5mm 73 x 2.75mm 12 kV across 3.5 mm gap with Vth < 3 kV => Gain of 2500 Silicon PIN diode array, T-type Thin (200 mm) with 100 V reverse bias for fast charge (holes) collection

Test Confirms Reflected Light Light injected thru fiber APD views reflected light Light Re-emitted photoelectrons photoelectrons pe backscatter

HCAL Electronics The HCAL Electronics is divided into Front End Electronics (residing in the RBX’s) and the Trigger/DAQ interface electronics (HCAL TRIDAS). The HV/LV support systems as well as the monitoring system complete the electronics system. John Elias of FNAL is the overall coordinator for this entire hardware subsystem. The Front End electronics design is supervised by Elias and Terri Shaw (EE) of FNAL. A number of FNAL ASIC designers complete the team. The TRIDAS project is supervised by Drew Baden of Maryland. The Maryland EE team includes Rob Bard and Tullio Grassi. BU is a major contributor to the TRIDAS project (Jim Rohlf and Eric Hazen (EE)) . Mark Adams of UIC rounds out the design effort. Chris Tully of Princeton is working on the VME readout chain. The HV system is the responsibility of Fermilab (Anatoly Ronzhin and Sergey Los). The PS’s are being manufactured in Sofia, Bulgaria. The LV system is the responsibility of FNAL (Claudio Rivetta) The monitoring task is supervised by John Elias, but consists of many contributors from a number of institutions.

HCAL Electronics Overview

Front End Electronics The Front End Electronics design and fabrication is an FNAL project. John Elias is the overall manager and coordinator of the electronics project. Theresa (Terri) Shaw (EE at FNAL) is the electronics integration engineer. The FNAL micro-electronics group is leading the front-end electronics ASIC design effort (supervised by Ray Yarema). The front end electronics design now consists of a modified KTeV QIE chip with an on-board flash ADC on the same ASIC followed by a Channel Control ASIC (CCA). Sergey Los and Alan Baumbaugh (EE’s) act as interface engineers. The digitized output signals are transmitted over optical links to the CMS Counting Room. Three (or two) ADC channels per link will be transmitted over the CMS rad-hard CERN solution to the counting house. The ASIC project no longer defines our CRITICAL PATH. We expect to complete these ASICs by August of 2002.

Calibration System The Calibration system consists of: Radioactive source system (primary and absolute calibration of all megatiles) Laser system (stability monitoring and timing system for all megatiles) LED’s (stand alone system) QA/QC stations have also been manufactured to ensure megatile uniformity (FSU: megatile scanner; Notre Dame: Pigtail scanner) Vasken Hagopian of Florida State is the overall manager of all calibration systems. He is directly responsible for the laser system (aided by Kurtis Johnson). Virgil Barnes and Alvin Laasanen are responsible for the implementation of the radioactive source system. They are responsible for a similar system on CDF. Yasar Onel is responsible for the implementation of the LED system. All calibration systems could be finished by end of ‘01 for installation at CERN on time and on budget.

HB Calibration Box PPP3

Calibration Box Schematic

HB Calib Box PPP2 CERN Bldg 186 Calibration Box #2 prototype P2

HCAL SOURCE CALIBRATION Schematic layout of HB Air-Motor Source Driver Envelope is 410 mm x 700 mm

HCAL SOURCE CALIBRATION Indexer  Reel  Schematic layout of HE Air-Motor Source Driver in the RBX “notch”. Design drawing by A. Surkov

Trigger/DAQ Electronics The HCAL Trigger/DAQ electronics serves as an interface between the HCAL raw data and the CMS Level I and Level II trigger electronics or computers. The design is based on modern FPGA’s (leading to future and present flexibility). Drew Baden of Maryland is the manager for this task. Recently he has been joined by Jim Rohlf (of BU), who is assisting with oversight of these many distributed tasks that constitute this subsystem. The engineering design and electronics manufacture has been divided between Maryland Boston and UIC (HCAL Trigger Card (HTR): Maryland; Data Concentrator Card (DCC): Boston; and the HCAL Readout Controller (HRC): UIC) The project consists of a Demonstrator phase (2000); a Prototype phase (2001) and a Production phase (2002). The Demonstrator has assumed some of the functionality of the Prototype so that the engineering has overlapped.

CMS TriDAS Architecture Data from CMS FE to T/DAQ Readout Crates Level 1 “primitives” Crossing determined Summing Tx to Level 1 Trigger Data is pipelined waiting decision Level 1 accepts cause Tx raw data to concentrators Buffered and wait for DAQ readout System communication via separate path (TTC) Clock, resets, errors, L1 accepts… Event Builder Event Manager Level 1 Trigger Detector Front End Online Controls Computing Services Readout Crates Level 2/3 Filter Units

HCAL Contribution to Trigger/DAQ Includes: Receiver cards ( including fiber input receivers and deserializers) Cables to Level 1 Trigger system Concentrators VME crate CPU module VME crates and racks Everything between but not including: Fibers from QIE FEs DAQ cables Trigger/DAQ Front End Readout Crate - Level 1 Buffer - Level 2 Concentrator - Crate CPU Level 2 and DAQ CMS HCAL HCAL Data QIE Fibers Level 1 Trigger

FE/DAQ Readout

HTR/Integration@UMD HTR (Maryland): 6U Front end emulator and LHC emulator finished 6U Demonstrator board finished FE  TriDAS Links R&D on G-Links 800 Mbps finished R&D on Gigabit Ethernet 1.6 Gbps now beginning Some work to do to pin down parallel optical links (PAROLI) Decreases cost from $100 to $50/fiber Cost and availability concerns Evaluation of FPGA choices still underway Functionality: Understand of FPGA resource requirements Overall integration FNAL Aug ’01 source calibration tests FPGA code very simple – no trigger requirement Demonstrate Data receiving, pipeline, synchronization, transmission to DCC FPGA code development underway shortly 1 or 2 EE graduate students Baden

DCC@BU VME Motherboard DCC Logic Board TTCRx Xilinx VirtexII XC2V1000 2Mx32 DDRSDRAM S-Link Source Card (optical fibre to DAQ) 3-Channel LVDS Serial Link Receiver (6 used in final DCC) PC-MIP PCI standard VME Motherboard Two prototypes working; 5 more boards being built Link Receiver Board (LRB) 10 second-generation boards working DCC Logic Board PCB Design complete; being fabricated FPGA coding underway Test Stand Hardware Complete Pentium/Linux computer, TTC System Working Link Transmitters S-Link cards available Companion LVDS Serial Link Transmitter (for testing only)

Forward Calorimeter (HF) The forward calorimeter (HF) is essential for Missing Energy determination as well as for tagging Higgs production HF is also an optical device, but a Cherenkov light device, sitting in a very high radiation environment. The Cherenkov light is produced and transmitted via quartz fibers to photomulitpliers. The entire electronics and calibration chain for HF is similar/identical to that of HB. Nural Akchurin of the Texas Tech is the Technical Coordinator of the HF system. HF University groups contribute to the design and manufacture of specific HF subsystems: Larry Sulak, Jim Rohlf & Eric Hazen of Boston University (electronics); Walter Anderson of Iowa State, Yasar Onel of Iowa and Dave Winn of Fairfield (photomultipliers); John Hauptman of Iowa State (HV); Nural Akchurin of TTU (fiber testing and source calibration); Marc Baarmand of FIT (laser calibration); Greg Snow of Nebraska and Richard Wigmans of TTU (luminosity monitoring).

USCMS Responsibility Matrix Front End, Trig/DAQ (FNAL, BU) DCS , Voltage (FNAL) Backplane matrix (TTU) Optics and Fibers (TTU, Iowa - QP) Absorber (FNAL-Design) Luminosity (Nebraska, TTU) Photodetectors (Iowa, TTU) Base + HV Design (ISU, TTU) Calibration (Iowa - LED) (FSU - Laser) (TTU + PU - Source) Readout Boxes (TTU) Transporter (FNAL - Design) End Plug (FNAL - Design)

HF Wedge and Detector HF 20-degree sectors will be assembled into a superstructure with the aid of two L-shaped lifting fixtures. Each sector is optically and electronically independent. The design and assembly concepts are developed at FNAL.

Optics: Fiber Routing and Termination Fibers Source Tubes Wedge Ferrules Preliminary fiber insertion studies have been carried out with the PPP2 wedge in Bat186. The optical assembly procedures and quality control process are being worked out by the US and the Hungarian colleagues from KFKI-Budapest.

Summary and Conclusions HCAL is 60% finished Remaining US tasks are readout and trigger electronics related We have an aggressive schedule to complete by the magnet installation in early 2004, but we believe we can accomplish all our tasks