Topics Today Conversion for Arithmetic Gradient Series

Slides:



Advertisements
Similar presentations
Systems Eng. Lecture 2 Begin Reading Chapter , Problems 1, 3, 5 by Wednesday, January 24, 2001.
Advertisements

Chapter 4 More Interest Formulas
Engineering Economic Analysis - Ninth Edition Newnan/Eschenbach/Lavelle Copyright 2004 by Oxford Unversity Press, Inc.1 Engineering Economic Analysis 9th.
© Mcgraw-Hill Companies, 2008 Farm Management Chapter 17 Investment Analysis.
Engineering Economics I
Econ. Lecture 3 Economic Equivalence and Interest Formula’s Read 45-70
Engineering Economics ENGR 3300
1 Warm-Up Review Homepage Rule of 72 Single Sum Compounding Annuities.
Chapter 17 Investment Analysis
Chapter 2 Applying Time Value Concepts Copyright © 2012 Pearson Canada Inc. Edited by Laura Lamb, Department of Economics, TRU 1.
Engineering Economics Outline Overview
(c) 2002 Contemporary Engineering Economics 1 Chapter 4 Time Is Money Interest: The Cost of Money Economic Equivalence Development of Interest Formulas.
Lecture No.3.  Interest: The Cost of Money  Economic Equivalence  Interest Formulas – Single Cash Flows  Equal-Payment Series  Dealing with Gradient.
© 2012 by McGraw-Hill, New York, N.Y All Rights Reserved 3-1 Lecture slides to accompany Engineering Economy 7 th edition Leland Blank Anthony Tarquin.
State University of New York WARNING All rights reserved. No part of the course materials used in the instruction of this course may be reproduced in any.
(c) 2002 Contemporary Engineering Economics
ENGR 280 Engineering Economics Course Review November 29, 2005.
CHAPTER 8 PRICE CHANGES and ECHANGE RATES. Definitions Inflation –An increase in the average price paid for goods and services bringing about a reduction.
ENGR 280 Engineering Economics Faculty of Engineering University of Victoria Fall 2005.
Chapter 7 Engineering Economic Analysis Time Value of Money.
Engineering Economics in Canada
(c) 2002 Contemporary Engineering Economics
Financial Accounting Introduction. Copyright © 2006 Pearson Education Canada Inc. 6-2 Engineers need to understand how financial data is recorded and.
Engineering Economics in Canada Chapter 9 Inflation.
Interest Formulas – Equal Payment Series
1 Feedback and Warm-Up Review Feedback of your requests Cash Flow Cash Flow Diagrams Economic Equivalence.
LECTURE 6 NONUNIFORM SERIES Prof. Dr. M. F. El-Refaie.
EGR 403 Capital Allocation Theory Dr. Phillip R. Rosenkrantz
Chapter 2 Factors: How Time and Interest Affect Money
British Columbia Institute of Technology
Interest Formulas (Gradient Series) Lecture No.6 Professor C. S. Park Fundamentals of Engineering Economics Copyright © 2005.
Chapter 4 The Time Value of Money Chapter Outline
6-0 Week 3 Lecture 3 Ross, Westerfield and Jordan 7e Chapter 6 Discounted Cash Flow Valuation.
Naval Postgraduate School Time Value of Money Discounted Cash Flow Techniques Source: Raymond P. Lutz, “Discounted Cash Flow Techniques,” Handbook of Industrial.
Summer Time Value of Money Session 2 07/02/2015.
PRINCIPLES OF MONEY-TIME RELATIONSHIPS. MONEY Medium of Exchange -- Means of payment for goods or services; What sellers accept and buyers pay ; Store.
Single-Payment Factors (P/F, F/P)
Economic System Analysis January 15, 2002 Prof. Yannis A. Korilis.
Chapter 26 Capital Investment Decisions
MIE Class #3 Manufacturing & Engineering Economics Concerns and QuestionsConcerns and Questions Quick Recap of Previous ClassQuick Recap of Previous.
FINANCE IN A CANADIAN SETTING Sixth Canadian Edition Lusztig, Cleary, Schwab.
Equivalence and Compound interest
Interest Formulas (Gradient Series)
Engineering Economics. Excel Financial Functions.
Series and Sequences An infinite sequence is an unending list of numbers that follow a pattern. The terms of the sequence are written a1, a2, a3,...,an,...
ENGINEERING ECONOMICS ISE460 SESSION 3 CHAPTER 3, May 29, 2015 Geza P. Bottlik Page 1 OUTLINE Questions? News? Recommendations – no obligation Chapter.
Chapter 8 Long-Term (Capital Investment) Decisions.
ENSC 201: The Business of Engineering Instructor: John Jones Office Hours: 4:00-6:00 Wednesdays, TT 8909 Course Website:
Arithmetic Gradient Factors (P/G, A/G) Cash flows that increase or decrease by a constant amount are considered arithmetic gradient cash flows. The amount.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Interest Formulas (Gradient Series)
Interest Formulas for Single Cash Flows
Introduction to Accounting I Professor Marc Smith CHAPTER 1 MODULE 1 Time Value of Money Module 3.
MER Design of Thermal Fluid Systems Econ Lecture 2 Professor Bruno Winter Term 2002.
1 Engineering Economics.  Money has a time value because it can earn more money over time (earning power).  Money has a time value because its purchasing.
Example 1: Because of general price inflation in the economy, the purchasing power of the Turkish Lira shrinks with the passage of time. If the general.
Economic Equivalence Lecture No.3 Chapter 2 Fundamentals of Engineering Economics Copyright © 2008.
Faculty of Applied Engineering and Urban Planning Civil Engineering Department Engineering Economy Lecture 1 Week 1 2 nd Semester 20015/2016 Chapter 3.
Basic Of Engineering Economy
Arithmetic and Geometric sequence and series
Interest Formulas (Gradient Series)
Chapter 2 Time Value of Money
Interest Formulas for Single Cash Flows
Chapter 4: The Time Value of Money
Engineering Economy [3] Combining Factors Examples
Geometric Sequences and Series
Chapter 4: The Time Value of Money
OUTLINE Questions? News, Experiences? Chapter 3
Chapter 4: The Time Value of Money
Contemporary Engineering Economics
Presentation transcript:

Topics Today Conversion for Arithmetic Gradient Series Conversion for Geometric Gradient Series Quiz Review Project Review

Series and Arithmetic Series A series is the sum of the terms of a sequence. The sum of an arithmetic progression (an arithmetic series, difference between one and the previous term is a constant) Can we find a formula so we don’t have to add up every arithmetic series we come across?

Sum of terms of a finite AP

Arithmetic Gradient Series A series of N receipts or disbursements that increase by a constant amount from period to period. Cash flows: 0G, 1G, 2G, ..., (N–1)G at the end of periods 1, 2, ..., N Cash flows for arithmetic gradient with base annuity: A', A’+G, A'+2G, ..., A'+(N–1)G at the end of periods 1, 2, ..., N where A’ is the amount of the base annuity

Arithmetic Gradient to Uniform Series Finds A, given G, i and N The future amount can be “converted” to an equivalent annuity. The factor is: The annuity equivalent (not future value!) to an arithmetic gradient series is A = G(A/G, i, N)

Arithmetic Gradient to Uniform Series The annuity equivalent to an arithmetic gradient series is A = G(A/G, i, N) If there is a base cash flow A', the base annuity A' must be included to give the overall annuity: Atotal = A' + G(A/G, i, N) Note that A' is the amount in the first year and G is the uniform increment starting in year 2.

Arithmetic Gradient Series with Base Annuity

Example 3-8 A lottery prize pays $1000 at the end of the first year, $2000 the second, $3000 the third, etc., for 20 years. If there is only one prize in the lottery, 10 000 tickets are sold, and you can invest your money elsewhere at 15% interest, how much is each ticket worth, on average?

Example 3-8: Answer Method 1: First find annuity value of prize and then find present value of annuity. A' = 1000, G = 1000, i = 0.15, N = 20 A = A' + G(A/G, i, N) = 1000 + 1000(A/G, 15%, 20) = 1000 + 1000(5.3651) = 6365.10 Now find present value of annuity: P = A (P/A, i, N) where A = 6365.10, i = 15%, N = 20 P = 6365.10(P/A, 15, 20) = 6365.10(6.2593) = 39 841.07 Since 10 000 tickets are to be sold, on average each ticket is worth (39 841.07)/10,000 = $3.98.

Arithmetic Gradient Conversion Factor (to Uniform Series) The arithmetic gradient conversion factor (to uniform series) is used when it is necessary to convert a gradient series into a uniform series of equal payments. Example: What would be the equal annual series, A, that would have the same net present value at 20% interest per year to a five year gradient series that started at $1000 and increased $150 every year thereafter?

Arithmetic Gradient Conversion Factor (to Uniform Series) 1 2 3 4 5 1 2 3 4 5 $1000 $1150 A A A A A $1300 $1450 $1600

Arithmetic Gradient Conversion Factor (to Present Value) This factor converts a series of cash amounts increasing by a gradient value, G, each period to an equivalent present value at i interest per period. Example: A machine will require $1000 in maintenance the first year of its 5 year operating life, and the cost will increase by $150 each year. What is the present worth of this series of maintenance costs if the firm’s minimum attractive rate of return is 20%?

Arithmetic Gradient Conversion Factor (to Present Value) $1600 $1450 $1300 $1150 $1000 1 2 3 4 5 P

Geometric Gradient Series A series of cash flows that increase or decrease by a constant proportion each period Cash flows: A, A(1+g), A(1+g)2, …, A(1+g)N–1 at the end of periods 1, 2, 3, ..., N g is the growth rate, positive or negative percentage change Can model inflation and deflation using geometric series

Geometric Series The sum of the consecutive terms of a geometric sequence or progression is called a geometric series. For example: Is a finite geometric series with quotient k. What is the sum of the n terms of a finite geometric series

Sum of terms of a finite GP Where a is the first term of the geometric progression, k is the geometric ratio, and n is the number of terms in the progression.

Geometric Gradient to Present Worth The present worth of a geometric series is: Where A is the base amount and g is the growth rate. Before we may get the factor, we need what is called a growth adjusted interest rate:

Geometric Gradient to Present Worth Factor: (P/A, g, i, N) Four cases: (1) i > g > 0: i° is positive  use tables or formula (2) g < 0: i° is positive  use tables or formula (3) g > i > 0: i° is negative  Must use formula (4) g = i > 0: i° = 0 

Compound Interest Factors Discrete Cash Flow, Discrete Compounding

Compound Interest Factors Discrete Cash Flow, Discrete Compounding

Compound Interest Factors Discrete Cash Flow, Continuous Compounding

Compound Interest Factors Discrete Cash Flow, Continuous Compounding

Compound Interest Factors Continuous Uniform Cash Flow, Continuous Compounding

Quiz---When and Where Quiz: Tuesday, Sept. 27, 2005 11:30 - 12:20 (Quiz: 30 minutes) Tutorial: Wednesday, Sept. 28, 2005 ELL 168 Group 1 (Students with Last Name A-M) ELL 061 Group 2 (Students with Last Name N-Z)

Quiz---Who will be there U, U, U, U, and U!!!! CraigTipping    ctipping@uvic.ca Group 1 (Last NameA-M) ELL 168 LeYang             yangle@ece.uvic.ca       Group 2 (Last Name N-Z) ELL 061

Quiz---Problems, Solutions Do not argue with your TA! Question? Problems? TAWei Solutions will be given on Tutorial Bring: Blank Letter Paper, Pen, Formula Sheet, Calculator, Student Card Write: Name, Student No. and Email

Quiz---Based on Chapter 1.2.3. Important: Wei’s Slides Even More Important: Examples in Slides 1 Formula Sheet is a good idea 5 Questions for 1800 seconds. Wei used 180 seconds (relax)

Quiz---Important Points Simple Interests Compound Interests Future Value Present Value Key: Compound Interest Key: Understand the Question

Quiz---Books in Library!!! Engineering Economics in Canada, 3/E Niall M. Fraser, University of Waterloo Elizabeth M. Jewkes, University of Waterloo Irwin Bernhardt, University of Waterloo May Tajima, University of Waterloo   Economics: Canada in the Global Environment by Michael Parkin and Robin Bade.

Calculator Talk No programmable No economic function Simple the best Trust your ability Trust your teaching group

Questions? (Sorry I forget the problems)

Project----Time Table Find your group: Mid-October Select Topic: End of October Survey finished: End of October Project: November (3 Weeks) Project Report Due: Final Quiz

Project----Requirements Group: 3-6 Students Topic: Practical, Small Report: On Time, Original Marks: 1 make to 1 report Report: 25 marks out of 100

Project Topic----What to do You Find it Practical Example: Run a Pizza Shop Example: Run a Store for computer renting Example: Survey on the Tuition Increase Example: Why ??? Company failed….. Team Work

Project----Recourse Not your teaching group No spoon feed: Independent work Example: Government Web Example: Library, Database, Google Example: Economics Faculty Example: Newspaper, TV Example: Friends

Summary Conversion for Arithmetic Gradient Series Conversion for Geometric Gradient Series Quiz: My slides and the examples in slides Project: Good Idea, be open, independent