Slide 1 Anthony Affolder US Module LT meeting June 17, 2004 UCSB Module LT Testing.

Slides:



Advertisements
Similar presentations
Slide 1L3 Testing Meeting March 7, 2003UCSB Status-Anthony Affolder UCSB Testing Status Anthony Affolder (for the UCSB module testing group) Current testing.
Advertisements

Slide 1Module Testing Meeting March 7, 2003US Hybrid/Module/Rod Testing Model-Anthony Affolder US Hybrid/Module/Rod Testing Model Anthony Affolder (for.
Slide 1X-Calibration Common Testing Issues-Anthony AffolderModule Testing Meeting, June 3, 2003 X-Calibration Common Testing Issues: Grounding, Environmental.
May 13, FNAL Hybrid Thermal Test Status  Hybrid Thermal Test Procedure  Test Results Eva Medel FNAL CMS Group June 22, 2004.
Recent TOB Developments First LT failure and Stereo Module Status J. Incandela With slides provided by E. Chabalina, A. Affolder, Dean White.
1 Hybrid & Module Testing Status Week of 6/6-6/10.
6/22/04 Slide 1 Hybrid Testing Status Lance Simms 6/22/04.
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
Slide 1UCSB Rod Production presented by Jim LambDOE review, January 20, 2004 UCSB Rod Production UCSB Rod Production, Jan , presented by Jim Lamb.
Slide 1 Anthony Affolder US Silicon Meeting, March 9, 2004 Equipment Status ARCS equipment status à Single module and 4 hybrid DAQ equipment status à Vienna.
Slide 1Electrical Testing at UCSB -Anthony AffolderDOE review, January 20, 2004 Module Testing at UCSB: Simulated Production Derek Barge On behalf.
1 US Testing Status-Anthony AffolderModule Testing Meeting, Dec. 11, 2003 Update of US Testing Status Anthony Affolder On behalf of the US testing group.
Slide 1Rod Production presented by Jim Lamb (UCSB)April 9, 2004 Rod Production Rod Production, April , presented by Jim Lamb (UCSB)
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update.
Slide 1 Electrical Testing at UCSB -Anthony AffolderDOE review, January 18, 2005 Electrical Testing at UCSB: Hybrids & Modules Anthony Affolder On behalf.
CMS Tracker Week, CERN, Apr Apr 2004CMS Tracker Week - Module ProductionSalvatore Costa - Catania Module Production ___________ Report on.
Defect Analyzer for Rods Patrick Gartung. Installation Tried to install and compile on my desktop –Fermi Linux LTS 3.0 –Newer system QT library caused.
Tracker Week, CERN, Oct Oct 2003Tracker Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting 21 Oct.
Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 1 Results from module testing E.Chabalina University of Illinois (Chicago)
28 June 2004ATLAS Pixel/SCT TIM FDR/PRR1 TIM tests with ROD Crate John Hill.
Catania Production Center S.Albergo Universita’ & INFN Catania.
MODULE QUALIFICATION STATUS AT LIVERPOOL
UCSB Hybrid Bonding & Testing
DAQ Equipment Status 2 fully equipped Vienna boxes at UCSB and FNAL
On behalf of the US TOB testing group
UCSB Testing Status Anthony Affolder
Defect Analysis algorithms for the ARC, Lt and LtStruct tests
Hybrid & Module Testing Status
Update of US Testing Status
UCSB Testing Status Anthony Affolder
Hamburg Bonding Report
Results from module testing
Local database Local testing database seems necessary in current situation A common solution for UCSB/FNAL would be optimal Based in root, ascii file summaries,
UCSB Testing Status Anthony Affolder
US Module Production Quality
Module Failures on RODs
FNAL Module Testing Status
On behalf of the US TOB testing group
Module production in Italy
US Testing Update Anthony Affolder (On behalf of the US testing group)
Operations/Failure Analysis
UCSB Qualification Module Grading
Hybrid & Module Electrical Testing
US Hybrid/Module/Rod Testing Model
Hybrid & Module Testing Status
Modules Produced With Low Rint Sensors
Anthony Affolder UC Santa Barbara
Module Testing in Florence Carlo Civinini INFN-Florence
Electrical Testing at UCSB: Hybrids & Modules
US Module Testing Progress Report
Operations/Failure Analysis
5018 Sensors Channels 420 at 150 V.
Electrical Testing at UCSB: Hybrids, Modules, & Rods
TOB Module Production Overview and Plan
FNAL module testing summary
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Module Failures on Rods
Module Testing Status Week of 3/14-3/18.
Hybrid & Module Testing Status
US Module Testing Progress Report
Operations/Failure Analysis
Hybrid & Module Testing Status
Equipment Status ARCS equipment status DAQ equipment status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
5018 Sensors Channels 420 at 150 V.
Hardware needs (ARCS) Current ARCS capabilities at both sites should be able to keep up with production assuming software changes Automatic I-V curves,
FNAL Hybrid Testing Status
Presentation transcript:

Slide 1 Anthony Affolder US Module LT meeting June 17, 2004 UCSB Module LT Testing

Slide 2 Anthony Affolder US Module LT meeting June 17, 2004 Data Taking Scenarios used à Standard LT scenario (night.lt) –1 thermal cycle, tests at 20 C, -20 C, 20 C à Qualification scenario (3day-1daycold.lt) –1 day thermal cycling, 1 day -20 C, 1 day thermal cycling No verification/fault finding done by UCSB à Patrick has been analyzing the data for us, telling us if runs OK à Not a good idea for production. Would have lag-times in which we would have to find modules and re-test them. à We need the tools to do this semi-automatically No comparison of data to ARCS data done yet à We currently take a noise and LED run on the ARCS to confirm nothing changed. If anything does, then we look at root file à We definitely need a tool to compare ARCS and LT data to check for differences, confirm good data

Slide 3 Anthony Affolder US Module LT meeting June 17, 2004 second sensor which failed Strasbourg Vienna

Slide 4 Anthony Affolder US Module LT meeting June 17, 2004 Pre-series II sensors: optical inspection systematic optical inspection done, but only for the 10 first sensors tested (corresponding to 4 different batches): à all of them were fine before the test (not touched since they left STM) à after the test: stains and mainly dots seen for ALL of them (see next)  clear ageing effect again!

Slide 5 Anthony Affolder US Module LT meeting June 17, 2004 ID which failed the test only the most terrible pictures!

Slide 6 Anthony Affolder US Module LT meeting June 17, 2004 Database Currently we are doing nothing at UCSB with database, xml generation, validation, or uploading à Again, Patrick has been saving us over the short term Clearly, we need to do this on site as well à Preferably in a semi-automatic way which could also check the quality of the data We need to develop tools similar to the gantry database which will automatically move the root files to a common area, generate the xml, check the xml quality, and finally upload the data à I believe that the Defect Analyzer package Patrick has recently been using could do most of the work –We will need to write a tool for checking the xml quality

Slide 7 Anthony Affolder US Module LT meeting June 17, 2004 Equipment We are short 1 PAACB from running 10 slots à Does FNAL have a spare 1 (or 2 if they have more spares)? So far, our +5V LV supply failed/overheated and we have blown two fuses on the Vienna box power supply à We have spares of both After replacing backplane and using extensions, 2 slots not working à We need help in de-bugging these 2 slots and a set of procedures on how to de-bug these failures in the future.

Slide 8 Anthony Affolder US Module LT meeting June 17, 2004 Data Handling Short Term Patrick will show FNAL/UCSB how to use LTmacro and the Defect Analyzer à Need volunteers at FNAL/UCSB to run programs Check data visually à Need macro to make all plots needed (I-t especially) Manually check xml files until we believe results Manually update data

Slide 9 Anthony Affolder US Module LT meeting June 17, 2004 Data Handling Long Term Need a tool of move root file to analysis area (if necessary) Need to tune/confirm LTmacro and Defect Analyzer à Hopefully Patrick Need a tool to automatically run LTmacro in files in area à Need volunteer Need a tool to automatically run Defect Analyzer à Need volunteer Need a tool to confirm data is good in xml file à Need volunteer at both sites Need a tool to upload xml files à Need volunteer Need a tool to compare ARCS and LT data à Either compare macro outputs or bad channel flags in database à I believe the comparing bad channel flags in the database will be easier to maintain over the production à Again another volunteer