Edda Gschwendtner1 Status of the TPG B. Bene, A. Blondel, E. Gschwendtner, J.-P. Richeux, R. Sandstrom, O. Voloshyn Universite de Geneve S. Giani, J.-C.

Slides:



Advertisements
Similar presentations
1 Jim Thomas - LBL A Brief Introduction to the STAR Time Projection Chamber Jim Thomas Lawrence Berkeley National Laboratory June 4 th, 2009.
Advertisements

GEM Detectors for AnDY Nilanga Liyanage University of Virginia 1 Outline GEM chamber concept Large area GEM chamber projects Proposed GEM configuration.
TPC Proposal for the 35 Ton Liquid Argon Test Abstract We propose to equip the 35 ton cryostat with one APA and two CPA’s, and all the necessary equipment.
ALICE TPC field cage status Sardinia May 2004 Michael Hoch Cern-TA2.
CMS GEM Workshop III, April 20, 2012
D. Peterson, “Status of the Cornell/Purdue Program” TPC R&D Mini Workshop, Orsay 12-January Status of the Cornell/Purdue Program: first events with.
Edda Gschwendtner1 RF test of a small TPG detector prototype F. Ambrosino,C. D’Addio, F. Caspers, U. Gastaldi, E. Gschwendtner, E. Radicioni, G. Saracino.
RF test of the GEM detector prototipe Detector description RF test area (LINAC3) detector working conditions RF field measurement Detector measurements.
Tracking Detectors Working Group MICE Collaboration Meeting March 30, 2004 A. Bross.
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
SHMS Detector Commissioning and Installation Howard Fenker Hall-C Users Meeting Jan-2015.
Introduction to GEM detectors assembly Leszek Ropelewski CERN CompassTotem 33 cm NA61 30 cm 20 cm 66 cm Totem Upgrade 10 cm.
1 SBS Spectrometer / GEP5 Conf.. 2 Tracking Requirements Requirements Tracking Technology DriftMPGDSilicon High Rate: MHz/cm 2 (Front Tracker)
1 HBD Construction status Itzhak Tserruya DC meeting, BNL, February, 2006 Plans for Run-6 Box construction GEM assembly and testing Status of urgent items.
12/Dec/2012SBS-Meeting1 of 24 Status of the Front Tracker GEM and INFN Electronics 2013 – Feb – 20 SBS Weekly Meeting GEM Assembling SRS – INFN Electronics.
20/04/2012Rui De Oliveira1 20/04/2012. Rui De Oliveira2 30 cm x 30 cm example.
Large Area Endplate Prototype for the LC TPC 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes, S.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
Prototypes For Particle Detectors Employing Gas Electron Multiplier
The Bigbite second GEM tracker. SBS GEM Trackers Front Tracker Geometry x6 18 modules In Italy  50 cm x 40 cm Modules are assembled to form larger chambers.
12/Dec/2012SBS-Meeting1 of 24 Status of the Front Tracker GEM and INFN Electronics 2012 – Dec – 12 SBS Weekly Meeting GEM Assembling SRS – INFN Electronics.
The ALICE Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr Institute for the ALICE Collaboration.
TPC R&D status in Japan T. Isobe, H. Hamagaki, K. Ozawa, and M. Inuzuka Center for Nuclear Study, University of Tokyo Contents 1.Development of a prototype.
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
EPS-HEP 2015, Vienna. 1 Test of MPGD modules with a large prototype Time Projection Chamber Deb Sankar Bhattacharya On behalf of.
Malte Hildebrandt, PSIMEG - Review Meeting / 1   e  Drift Chambers Charge Division Test Chamber Testsetup for Cosmics Chamber Construction.
GEM R&D Update Kondo Gnanvo. Outline  GEM R&D and assembly facilities at UVa  Cosmic test results  Update on the 40 × 50 cm 2 GEM prototype  Plans.
Status of GEM T2 assembly Outline Status of the GEM components Summary Tests TOTEM Collaboration meeting CERN / Risto Orava for Kari Kurvinen.
CHANTI update F. Ambrosino, T. Capussela, D. Di Filippo, P. Massarotti, M. Mirra, M. Napolitano, L. Roscilli, G. Saracino.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
1 HBD update Itzhak Tserruya DC Upgrades meeting, January 14, 2005 NIM paper II: Generic R&D ~ completed Full scale prototype construction Pending issues.
Update on CHANTI F. Ambrosino, T. Capussela, D. Di Filippo, P. Massarotti, M. Napolitano, L. Roscilli, G. Saracino Università degli Studi di Napoli «Federico.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
1 TPC R&D proposal from the WIS group I. Ravinovich WIS I. Ravinovich12/15/2015.
Update on THGEMs and Micromegas production for RICH-1 COMPASS Upgrade on behalf of THGEM Trieste group INFN - Sezione di Trieste S . Levorato S. Levorato.
Long Bo for LAPD Hans Jostlein10/20/2011 December 15, 2015 Long Bo for LAPD 1.
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
M. Staib, M. Abercrombie, B. Benson, K. Gnanvo, M. Hohlmann Department of Physics and Space Sciences Florida Institute of Technology.
HBD Status Craig Woody BNL DC Meeting October 3, 2007.
Towards a 7-module Micromegas Large TPC prototype 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes,
Large-Area GEM Detector Development at CMS, RD51, and Fl. Tech – A brief overview – Marcus Hohlmann Florida Institute of Technology, Melbourne, FL PHENIX.
A. Bross MICE CM17 February MuCool RF Program 805 and 201 MHz Studies.
Update on CHANTI F.Ambrosino, M.B. Brunetti*, F. Canfora*, T. Capussela**, D. Di Filippo, P. Massarotti, M. Napolitano, L. Roscilli, G. Saracino Università.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
Chamber Quality Control Before the construction several checks are performed on:  Panels (cathode and pad PCB)  GEM foil Tests on assembled detector.
NA62 straw readout Characterization and qualification of the frontend electronics Detector and interface to frontend Small readout system Plans Expected.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
MICE CM39 St Catherine’s, Oxford, 26 June 2014 Paul Soler Instrumentation Global Commissioning Plan.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
The BoNuS Detector: A Radial Time Projection Chamber for tracking Spectator Protons Howard Fenker, Jefferson Lab This work was partially supported by DOE.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
TPC Large Prototype panels D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, S. Turnbull Status of the Micromegas Large Prototype.
Low Momentum dE/dx Testbeam H.P. 7/24/98. Goals for Spectrometer are based on tracking and PID –Multiparticle correlation –production of particle species.
RD51 GEM Telescope: results from June 2010 test beam and work in progress Matteo Alfonsi on behalf of CERN GDD group and Siena/PISA INFN group.
Villa Olmo, Como October 2001F.Giordano1 SiTRD R & D The Silicon-TRD: Beam Test Results M.Brigida a, C.Favuzzi a, P.Fusco a, F.Gargano a, N.Giglietto.
Status report on the development of a TPC readout system based on the SALTRO-16 chip and some thoughts about the next step Leif Jönsson AIDA Meeting Vienna.
Results on a Large Area triple-GEM Detector at LNF 5 th RD51 Collaboration Meeting Freiburg, 25 May 2010 D. Domenici - LNF.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Single-Phase ProtoDUNE Construction Planning Jim Stewart LBNC January 11, 2016.
T2 GEM Production in Helsinki Kari Kurvinen TOTEM T2 EDR meeting Radiation Detector Laboratory of Helsinki Institute of Physics (HIP) and Department.
Status of the TPG E.Radicioni MICE coll. Meeting - RAL, Oct
Trigger & Tracking detector for CMS
Commissioning and Calibration Strategies for Micromegas Vertex Tracker
HF Test station at P5 A.Mestvirishvili.
G.Alexeev for Dubna group ITEP, April 28, Muon System Status Report from Dubna.
status of the second field cage
On behalf of the GEMs for CMS Collaboration
Development of Gas Electron Multiplier Detectors for Muon Tomography
Preparation of the CLAS12 First Experiment Status and Time-Line
Limited Streamer Tube Project Summary
Presentation transcript:

Edda Gschwendtner1 Status of the TPG B. Bene, A. Blondel, E. Gschwendtner, J.-P. Richeux, R. Sandstrom, O. Voloshyn Universite de Geneve S. Giani, J.-C. Legrand, R. de Oliveira, L. Ropelewski, F. Sauli, M. Van Stenis CERN, Geneva M.G. Catanesi, E. Radicioni INFN, sezioni di Bari V. Ableev, U. Gastaldi, M. Lollo, M. Rigato, P. Temnikov INFN-LNL, Legnaro F. Abrosino, G. Chiefari, M. Napolitano, V. Palladino, L. Roscilli, G. Saracino Universita e sezioni INFN, Napoli M. Apollonio, P. Chimenti, G. Giannini Universita e sezione INFN, Trieste

Edda Gschwendtner2 TPG project TPC GEM hexaboard electronics mechanics Newly fabricated GEMs Hexaboard Mechanics Modifications Electronics  Preamps  FADCs HARP TPC Software

Edda Gschwendtner3 TPC The test-bed: available infrastructure from the HARP experiment  Beam area  Solenoid  Field-cage  Gas  Electronics  DAQ 2.2m long solenoid, 0.7T field.  <1% disuniformity over 1.5m 80cm diameter field-cage, 1.5m long

Edda Gschwendtner4 Modifications from HARP TPC to MICE TPC removal of the inner field cage installation of an adapter flange for hosting the TPG head modified end-plate with holders of X-ray sources

Edda Gschwendtner5 In the end, the test should provide simultaneously 1.Many longitudinal tracks (as in MICE) 2.With Kr in the gas, a flow of low energy photons 3.With calibration sources in the end-plates a first example of the calibration system for MICE and flows of photons of various energies (from few KeV to MeV) Altogether a demonstration very near the MICE conditions.

Edda Gschwendtner6 GEMs 6 GEM foils 6 support rings Assembly and certifying procedure:  HV tests both on raw GEMs and supports  Glue 1 GEM to 1 support  HV test on glued GEMs  Solder resistors  HV test again

Edda Gschwendtner7 GEMs and supports 3 circular GEM supports, with spacers and space provided for resistor chains GEM being stretched before gluing on support. Following previous experiences (i.e. COMPASS), the GEMs are divided in 8 sectors, powered independently.

Edda Gschwendtner8 GEM HV test Newly designed probe holder

Edda Gschwendtner9 GEM glued on support GEM completed with support and resistors for the voltage divider

Edda Gschwendtner10 Hexaboard First hexaboard is finished. Delivered on time but unusable for full test.  Damaged at last production step (pressing/gluing) The hexaboard has been characterized with measurements of strip capacitance Maybe usable for minor measurements, to be verified within a few days. 3 hexaboards are ordered  One will possibly be finished for test-beam measurements now!

Edda Gschwendtner11 Hexaboard: active surface Layer M Layer N Layer O Connector

Edda Gschwendtner12 Hexapads & strips Active surface of a prototype hexaboard 300  m 3 layers of strips running under the pads

Edda Gschwendtner13 Hexaboard back (connectors) side Mechanical support structure Prototype hexaboard glued to a support and seen from the connectors side.

Edda Gschwendtner14 1 st Hexaboard prototype characterization Capacitance between neighbouring strips are measured for the 3 layers. Typically good values are in the 10pF range. A short-circuit was verified with an ohmmeter… Extended areas in short and some strips with capacitance higher than normal, but overall shape of the plot is right  connections inside the Hexa are not just random

Edda Gschwendtner15 TPG head assembly and location of cables Design of the complete assembly of the TPG head, with HV guard ring: field-defining ring to be matched to the corresponding strip on the field- cage 3 GEM supports Hexaboard and its support Main flange with feeds for HV and gas Study of signal routing from the hexaboard to the preamplifier boards via flat cables. Similar to final MICE setup (RF shielding is here missing, not necessary for test beam).

Edda Gschwendtner16 Electronics 16 strips flexi-cables 48 channels preamp board Pico-coax bundle 2 x 24 channels to FADC Pico-coax bundle Actions:  Inverted polarity at FADCs: hardware modification, simple but lengthy  Measure gain curves for preamplifiers

Edda Gschwendtner17 Software DAQ  HARP, done Reconstruction  geometry and unpacking  Modify clustering First in planes Then in pads Pattern Recognition & Fit  Use same software as for HARP

Edda Gschwendtner18 Plans: first stage All components are ready. NOW detector is being assembled. Test of TPG head in small volume  Assemble hexaboard, 3 GEMs  Gas-piping... Ar/CO2 80/20  Assemble TPG head and close with 5cm field-cage  Instrument detector  X-ray measurements  Possibly tracks, but no magnetic field. TPG head can be tested without waiting 2 days for gas flushing or purging in the big field cage Good test already for many parameters relevant to MICE

Edda Gschwendtner19 Plans: second stage Mount into HARP TPC only after TPG head fully commissioned  First gas: Ar/CH4 91/9  Present time window for measurements with magnetic field (X-rays, cosmics, parasitic beam), is until  Longer period maybe possible, to be seen with PS coordination Winter shutdown of the CERN accelerator complex lasts till next spring.  Resuming operation in April.  Complete characterization of the detector.