Read-out strips (roughly). Some initial observations: *) We are exercising the chip well above the “tracking” region. Lowest workable input charges are.

Slides:



Advertisements
Similar presentations
OCCULAR OCCUltation Limovie Analysis Routine Presented by: Bob Anderson and Tony George (IOTA) A program to easily detect and time occultations and standardize.
Advertisements

Sci-Fi tracker for IT replacement 1 Lausanne 9. December 2010.
Astronomical Detectors
MDC-II LVL-1 Trigger Khaled Teilab for the MDC Trigger Team.
SCIPP R&D on Long Shaping- Time Electronics SLAC SiD Workshop October 26-29, 2006 Bruce Schumm.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting Oct, 3, 2007.
9/11/2007JC Wang1 Track Resolution Scale, assume equal  meas for different planes. HP3 HP4 All 6 measurements. Without leftmost one. Without rightmost.
ARA Testbed Efficiency (Rough Cut) November 29 th Ben Rotter.
GLAST LAT Readout Electronics Marcus ZieglerIEEE SCIPP The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus.
GLAST LAT Readout Electronics Marcus ZieglerIEEE SCIPP The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus.
SCIPP R&D on Long Shaping- Time Electronics SLAC SiD Workshop October 26-28, 2006 Bruce Schumm.
Patrick Spradlin, SCIPP trip to LLU, May 2, 2001 Detector Characteristics.
J. Estrada - Fermilab1 AFEII in the test cryostat at DAB J. Estrada, C. Garcia, B. Hoeneisen, P. Rubinov First VLPC spectrum with the TriP chip Z measurement.
19 March 2005 LCWS 05 M. Breidenbach 1 SiD Electronic Concepts SLAC –D. Freytag –G. Haller –J. Deng –mb Oregon –J. Brau –R. Frey –D. Strom BNL –V. Radeka.
ECAL electronics Guido Haefeli, Lausanne PEBS meeting 10.Jan
STS Simulations Anna Kotynia 15 th CBM Collaboration Meeting April , 2010, GSI 1.
Performance of SPIROC chips in SKIROC mode
MR (7/7/05) T2K electronics Beam structure ~ 8 (9?) bunches / spill bunch width ~ 60 nsec bunch separation ~ 600 nsec spill duration ~ 5  sec Time between.
FPIX_flip_chip_test module calibration tests November 14 th 2012.
Stave DAQ Updates. Testing two collobarative software websites Wiki 22ATLAS_Upgrade_- _Stave_DAQ%22#Code_Versions.
SECTION 2-1 CONT. Bonding. TYPES OF CHEMICAL BONDS  Bonds involve the electrons in an atom.  1. Ionic Bonds Electrons are transferred from one atom.
EXPERIMENT VS. CORRELATIONAL STUDY. EXPERIMENT Researcher controls all conditions Experimental group – 1 or more groups of subjects Control group – controlled.
Motivation General rule for muon triggers: Never neglect a possible backup reduction factor. It will always come back to you. Even if RPC trigger works.
ILC Instrumentation R&D at SCIPP ALCPG ‘09 University of New Mexico September 29 – October Bruce Schumm Santa Cruz Institute for Particle Physics.
Channels of Communication HL – Option F.4 Mr. Jean.
1 EMC Trigger Summery from RunII and discussion for RunIII H.Torii, Kyoto Univ. ERT Lvl-1 meeting.
LCFI meeting 19 th August 2008 TESTING OF CPR2A Mirek Havranek, Peter Murray, Konstantin Stefanov, Stephen Thomas.
Calibration of the gain and measurement of the noise for the apv25 electronics K. Gnanvo, N. Liyanage, C.Gu, K. Saenboonruang From INFN Italy: E. Cisbani,
Forward Pixel Beamtest Analysis Carsten Rott Purdue University Januar 24, 2001.
AFE Meeting June 5, 2001 SIFT UPGRADE Marvin Johnson.
Anatoli Romaniouk TRT Test manual Some important information p. 2-3Some important information p. 2-3 Noise studies p.4-7Noise studies p.4-7 Operation with.
Peter W. PhillipsATLAS SCT Week, CERN, September/October 2002 Electrical Tests of SCT modules using RODs Peter W Phillips Rutherford Appleton Laboratory.
Pixel detector development: sensor
Application of Large Scale GEM for Digital Hadron Calorimetry Jae Yu For GEM DHCAL Group June 11, 2011 TIPP 2011 The Goals 30cmx30cm 2D readout with KPiX.
F Don Lincoln, Fermilab f Fermilab/Boeing Test Results for HiSTE-VI Don Lincoln Fermi National Accelerator Laboratory.
SCT WeekDecember 3, Block of Low Gain Analysis and Solutions A. Ciocio - LBNL.
PROFESSIONAL ASSET MANAGEMENT 1. Basic Categories Private Management: Clients each have a separate account {popular with institutions} Investor 1 Investor.
MuTr Chamber properties K.Shoji Kyoto Univ.. Measurement of MuTr raw signal Use oscilloscope & LabView Read 1 strip HV 1850V Gas mixture Ar:CO 2 :CF 4.
Gamma-ray Large Area Space Telescope Tower 1 TVAC tests Bad ladders issues.
18 Sep 2008Paul Dauncey 1 DECAL: Motivation Hence, number of charged particles is an intrinsically better measure than the energy deposited Clearest with.
Silicon Microstrip Tracking R&D in the US SiLC Collaboration Meeting University of Paris VII January 25, 2010 Bruce Schumm Santa Cruz Institute for Particle.
ILC Instrumentation R&D at SCIPP ALCPG ‘09 University of New Mexico September 29 – October Bruce Schumm Santa Cruz Institute for Particle Physics.
Eight fully instrumented PC1 mounted on top of the Drift Chamber. Qualities * Efficiency close to 100% and good spatial resolution. Noise free operation.
CM correction algorithm. Observations: Looking at the data for one analog link, a large fraction of the 32 strips are affected by the large signal deposit.
CBM 12 th Meeting, October 14-18, 2008, Dubna Present status of the first version of NIHAM TRD-FEE analogic CHIP Vasile Catanescu and Mihai Petrovici NIHAM.
S. Dasu, University of Wisconsin February Calorimeter Trigger for Super LHC Electrons, Photons,  -jets, Jets, Missing E T Current Algorithms.
Noise results from SR1 combined SCT barrel tests Summary of some initial results Alan Barr, UCL Pepe Bernabeu, Valencia.
The design of fast analog channels for the readout of strip detectors in the inner layers of the SuperB SVT 1 INFN Sezione di Pavia I Pavia, Italy.
Electronics SL – Option C.3 HL – Option F.5. Operational Amplifier An amplifier is a device that takes a signal and makes its bigger. – An mp3 player.
Analysis of LumiCal data from the 2010 testbeam
Light mixer proposal Arjan Heering, Anton Karneyeu
Potential and Current Control
Jean-Sebastien Graulich, Geneva
High-Resolution Micromegas Telescope for Pion- and Muon-Tracking
Second Coordinate A pitch for Small Angle Stereo
Application of VATAGP7 ASICs in the Silicon detectors for the central tracker (forward part) S. Khabarov, A. Makankin, N. Zamiatin, ,
L. Ratti, M. Manghisoni Università degli Studi di Pavia INFN Pavia
A Readout Electronics System for GEM Detectors
ILC Instrumentation R&D at SCIPP
A Fast Binary Front - End using a Novel Current-Mode Technique
Electron Behavior.
SiD Electronic Concepts
BESIII EMC electronics
Pre-installation Tests of the LHCb Muon Chambers
ASPID (Application of Silicon Photomultipliers to Imaging Detectors)
Well Correlation Exercise
3E7_05151 wafer 11 IV curve Noise ~122e Source scans bad and
Ionic Addition animation
Formal Charge When multiple resonance structures (more than one valid Lewis structure) are possible, formal charge is used to determine the most likely.
Presentation transcript:

Read-out strips (roughly)

Some initial observations: *) We are exercising the chip well above the “tracking” region. Lowest workable input charges are ~7 fC (normal gain) and ~4fC (double gain). Tracking thresholds are typically fC. *) Looked at channels 0-31 so far (0-63 bonded out) *) About 1/3 of loaded KPiX-7 channels look similar in gain and noise to unloaded channels *) But this noise is very high – 2000 to 2500 electrons *) Another ~1/3 of KPiX channels have somewhat higher noise, but similar gain (up to 4000 electrons, say…) [cont’d]

Initial observations cont’d *) 4 of 32 channels “dead” (comparator always firing or never firing, irrespective of input charge) *) Remainder have huge, non-gaussian noise/pickup and no response to input charge (may be swamped by the noise/pickup) *) No correlation between geometry (see slide 1) and channel behavior Not sure what we’re learning if we’re seeing 2000 electrons as baseline noise… need to think a bit about this for starters.