Chamber Background Friday 11.04.2008. Lights on 10:39 Long DMA has a leak… ignore the first few points.. An update is in the next slide..

Slides:



Advertisements
Similar presentations
March 02, 2009LHCb Muon Commissioning meeting 1 First week of chambers test Alessandro Cardini, Davide Pinci, Fernando Rodrigues, Maria Luisa Porto, Rafael.
Advertisements

Fridge-tag® recording sheet
Bring Something Setting: Activity Period To Work On Expectation: Be Respectful.
Limonene 50ppb on b-caryo 50ppb seed Chamber DMPS setup using wCPC 3786 (software thinks it is 3785)
A-Pinene 50ppb Nox 33 ppb Fill completed, allowing 20 min for instruments to stabilise and measure background.
Meso: Exp 15 Figs1-Exp6 5ppb Limonene and 20ppb O
Background Lights on at 11:23 DMPS is not reading the 3025 on the short DMA.
Isoprene 300ppb on Beta-Caryo SOA VOC/NOx
Chamber Background Friday 14 March Still 5000 p/cc just before the final fill is supposed to start! Bag is NOT clean enough, will do a couple more.
Limonene 250ppb NOx 136 ppb Tuesday Stopped pre-exp to do more cleaning… particle numbe 32cm-3.
Oxford Engine Emissions 10 th Jan Filter run.
First Background Exp Friday 29 Feb First Bkgd Exp after 4 days of harsh O3/lights cleaning Conditions: –RH between 50 – 60% (sensirion is not working)
B-Caryophyllene 250ppb NOx 130ppb Thursday
Limonene 50ppb on B-Caryo SOA Final flush!!
Limonene 50ppb on Beta-Caryo SOA Lights on at 09:49.
Conditioning the new bag DAY 1: 25 Feb Particle number concentration (wcpc 3786) Lights on at 15:58.
Beta-Caryophyllene 50ppb NOx 33 ppb RH 50 % First real experiment 12 March 2008.
Background New 3mm thick optical filter
Mesocosm: Figs1 Exp :09 Before final flush Bkgd: 0.14ug/m3 and ~200p/cc.
Limonene 50ppb on Beta-Caryo SOA Lights on at 10:11.
Chamber testing A/C on Flushed and ran 3 fill/flush cycles Fill complete, A/C still on.
Mesocosm: Figs – Exp :57 towards the end of the fill via plant chamber.
Mix Plants: Exp :45 Pre-exp (during filling)
Limonene 50ppb NOx 54ppb! Tuesday 22 April Lights on at 12:53.
Beta-caryophyllene 250ppb NOx 117 ppb Dp 13.6 Thursday 13 March 2008.
Limonene 4.5ppb O3 20ppb :17 sampling chamber housing air.
Beta-Caryophyllene 50ppb NOx 37ppb Seed testing.
Investigating Chocolate Copyright © 2012 Board of Trustees, University of Illinois. All rights reserved.
Muon System Safety Issues Burkhard Schmidt.
Please CLOSE YOUR LAPTOPS, and turn off and put away your cell phones, and get out your note- taking materials.
In The Secret In the secret in the quiet place In the stillness you are there In the secret In the quiet hour I wait only for You 'cause I want to know.
I Want to Know You In the secret, in the quiet place, In the stillness, You are there, In the secret, in the quiet hour I wait, Only for You, Cause I want.
Study Skills 7 November 2015 Diploma in Law. Purpose  Following on from yesterday’s student perspectives session, the purpose of this seminar is to give.
Teaching Time. This evening we will be… showing how maths strategies develop across the year groups show you the school’s calculations policy and how.
7:30 Friday, October 5 AT&T LTE 11:11 PM slide to unlock.
 Cross Multiply – used to solve simple rational equations  Can only be done when each side has a single rational expression.
Chapter 3 Test Review. Writing Equations of Lines  I can state the formula for slope, am able to use the formula, and can apply that slope is a rate.
Today and Yesterday ing and ed And irregular past tense.
网上报账系统包括以下业务: 日常报销 差旅费报销 借款业务 1. 填写报销内容 2. 选择支付方式 (或冲销借款) 3. 提交预约单 4. 打印预约单并同分类粘 贴好的发票一起送至财务 处 预约报销步骤: 网上报账系统 薪酬发放管理系统 财务查询系统 1.
IDEPv2 Status daryl herzmann. Executive Summary Within the past few weeks, a first draft of all necessary inputs to IDEPv2 were collected (Hooray For.
DESY BT analysis - updates - S. Uozumi Dec-12 th 2011 ScECAL meeting.
12hour and 24hour time Can you convert the times?
Perception Courses.
Who turned off the lights?
The Outwood Grange Family of Schools
Adding and Subtracting Integers (Positive and Negative Numbers)
continued on next slide
Sample Presentation. Slide 1 Info Slide 2 Info.
How to Unlock Chrome on Malwarebytes
How to Unlock Chrome on Malwarebytes
Malwarebytes Not Working after Update
Malwarebytes Not after Update
                                                                                                                                                                                                                                                
continued on next slide
continued on next slide
Solve: 1. 4<
DOE G-1 Research Aircraft Facility Instrument Summary
Characterization Update
What to do when a message arrives
A film starts at 13:45 and lasts for 1 hour and 35 minutes
C.2.10 Sample Questions.
C.2.8 Sample Questions.
Practice Exams.
Timetables.
C.2.8 Sample Questions.
continued on next slide

Aim: Full House Grid: 9 Grid Play: Calculate answer & cross it off
continued on next slide
Presentation transcript:

Chamber Background Friday

Lights on 10:39 Long DMA has a leak… ignore the first few points.. An update is in the next slide..

Problem solved.. There was a small blockage in the aerosol inlet line of the long DMA… 11:19 scan onwards are OK

70 min of lights on

5 hours after lights on

cToF AMS The new c-ToF AMS arrived yesterday and we managed to set it up and get it to sample from 15:34 to 16:24 today (still needs size and IE cals to be done)..

Lights off 16:39

Post-exp complete O3 = 2540ppb