Software in Acquisition Workshop Software Expert Panel Working Groups and Tasks Rick Selby 310-813-5570 DoD Software In Acquisition.

Slides:



Advertisements
Similar presentations
Exploration of Sector Level Roadmaps S. Price 1,2 & R. Summers 2,1 1.SP Informatics Ltd 2.Loughborough University Third International Seville Conference.
Advertisements

Conference xxx - August 2003 Fabrizio Gagliardi EDG Project Leader and EGEE designated Project Director Position paper Delivery of industrial-strength.
Defense Contract Management Agency Quality Assurance Directorate Presented By: Michael Shields Executive Director, Quality Assurance March 15 th, 2011.
System Development Performance Measurement Project 1.
International Energy Agency Hydrogen Implementing Agreement Proposed Task on Hydrogen Safety.
DoD Software Issues and Gap Identification Kristen Baldwin Deputy Director, Software Engineering and System Assurance OUSD(AT&L) April 18, 2007.
1 User-Centered Design CSSE 376, Software Quality Assurance Rose-Hulman Institute of Technology April 17, 2007.
NDIA Software Industry Experts Panel Paul R. Croll, Chair NDIA Systems Engineering Division Meeting 24 June 2008.
NDIA Software Industry Experts Panel 14 July NDIA 11 th Anuual Systems Engineering Conference Software in Acquisition Working Groups Software Track.
Systemic Analysis of Software Findings Scott Lucero Office of the Deputy Undersecretary of Defense (Acquisition and Technology) Software Engineering and.
The Soft Topics in Software Engineering Mark Ardis Stephen Chenoweth Frank Young.
NDIA Software Industry Experts Panel 14 July NDIA Software Industry Experts Panel Paul R. Croll, Chair NDIA Systems Engineering Division.
Software and System Engineering Integration Sponsor Overview Kristen Baldwin Deputy Director, Software Engineering and System Assurance Office of the Under.
Empowering Staff Through Institute Planning (ESTIP) Executive Workshop Institute Name: XXXXXX Presenter: XXXXXX Date: XXXXXX.
6/17/ :30:49 PM _Teamwork Competitive Prototyping Challenges for DoD and Industry Paul Croll, AMND Fellow May 28, 2008.
1 Overview of Usability Testing CSSE 376, Software Quality Assurance Rose-Hulman Institute of Technology April 19, 2007.
14 July 2008 Blake Ireland Industry Roundtable COMPETITIVE PROTOTYPING.
Recent Trends in DoD Systems and Software Engineering Processes Bruce Amato Acting Deputy Director, Software Engineering and Systems Assurance Office of.
Advancing Government through Collaboration, Education and Action Cloud Working Group How Do We Accelerate Cloud Adoption?
Software in Acquisition Workshop Software Expert Panel Outbrief Day 2 DoD Software In Acquisition Workshop April Institute for Defense Analyses,
University of Southern California Center for Systems and Software Engineering July 2008ICM and CP Workshop © USC-CSSE1 Initial Competitive Prototyping.
GTM for Product Leaders Project Overview A project that guides product leaders and their teams in developing a successful go-to-market strategy.
© 1998 Concept Five Technologies Enterprise Application Integration Capability Maturity Model.
Managing Projects and Clients Senior Consultant Training 23 September 2005.
C R E S S T / U C L A Evaluating the Impact of the Interactive Multimedia Exercises (IMMEX) Program: Measuring the Impact of Problem-Solving Assessment.
NDIA SE Architecture Committee 25 June 2012 Agenda: General Info – Nothing new Task # 4 Status (S. Dam) Task # 8 Status (R. Carson)
My rights, my voice project Package 2. Package 2 Development of training programme  Aim: To develop a training programme on the UNCRPD designed for people.
NDIA SE Division Meeting February 13, Developmental Test and Evaluation Committee Beth Wilson, Raytheon Steve Scukanec, Northrop Grumman Industry.
Unit 5:Elements of A Viable COOP Capability (cont.)  Define and explain the terms tests, training, and exercises (TT&E)  Explain the importance of a.
Human and Institutional Capacity Development Project in Rwanda (HICD-R) CORE TEAM KM WORKSHOP February 26, 2015 Delivered by Courtney Roberts.
Campaign Readiness Project Overview Enabling a structured, scalable approach to customer-centric campaigns.
Demystifying the Business Analysis Body of Knowledge Central Iowa IIBA Chapter December 7, 2005.
Analyze Opportunity Part 1
Introducing the Next Generation Science Standards (NGSS)
March 26-28, 2013 SINGAPORE CDIO Asian Regional Meeting and Workshop on Engineering Education and Policies for Regional Leaders Programme Evaluation (CDIO.
Radar Open Systems Architectures
Group work – why do it? Rachel Horn – Civil & Structural Engineering.
Government Procurement Simulation (GPSim) Overview.
Assessing the influence on processes when evolving the software architecture By Larsson S, Wall A, Wallin P Parul Patel.
NDIA CREATE-O.Goldfarb 3/8/2011 Page-1 Distribution Statement A: Approved for public release; distribution is unlimited. CREATE Transition Challenges Oscar.
 Management ◦ The activities and tasks undertaken by one or more persons for the purpose of planning and controlling the activities of other in order.
Process Improvement. It is not necessary to change. Survival is not mandatory. »W. Edwards Deming Both change and stability are fundamental to process.
How do you eat an elephant? Janet May April 21, 2010.
Interoperability Rudy van Beurden GTE ExCom member GTE+ Workshop on GTE+ Work Programme 24 June 2008.
Develop Project Charter
Nodal Education Initial Staff Concepts 11/30/05. Agenda Integrated Approach Roadmap and Processes Curriculum Development ERCOT Education Advisory Council.
Developing a Sustainable Procurement Policy and Strategy EAUC – EAF Programme.
Geospatial LoB: Lifecycle WG Update November 3, 2009.
Business Analysis. Business Analysis Concepts Enterprise Analysis ► Identify business opportunities ► Understand the business strategy ► Identify Business.
Process Improvement. It is not necessary to change. Survival is not mandatory. »W. Edwards Deming.
1 The project is financed from the European Union funds within the framework of Erasmus+, Key Action 2: Cooperation for innovation and the exchange of.
Technology Needs Assessments under GEF Enabling Activities “Top Ups” UNFCCC/UNDP Expert Meeting on Methodologies for Technology Needs Assessments
Requirements Engineering Processes. Syllabus l Definition of Requirement engineering process (REP) l Phases of Requirements Engineering Process: Requirements.
Fundamentals of Governance: Parliament and Government Understanding and Demonstrating Assessment Criteria Facilitator: Tony Cash.
Logistics Community Competency Initiative Update November 20, 2006 Mark Tregar, CNAC Judith Bayliss, DAU “The Total Force must continue to adapt to different.
ICOTE Meeting October, Chief Developmental Tester Project Status for ICOTE October 2014 Brendan Rhatigan – Lockheed Martin.
Part III: The Future: Scenarios, Conclusions, and Recommendations [of HSI Methods in System Development] Frank E. Ritter 26 feb 08 1.
Rick Selby Software Products, Northrop Grumman & Adjunct Faculty, University of Southern California Los Angeles, CA Candidate member Main empirical research.
Technology Readiness Assessment (TRA)
DSMC-Executive Program Management Courses
Recreational Boating Standards Harmonization Update
CS4311 Spring 2011 Process Improvement Dr
Identify the Risk of Not Doing BA
PMRIPT Portal Team.
Building a Business Case for Systems Engineering
Quality management standards
Planning a Learning Unit
Building Changes’ Strategic Business Planning Process
Presentation transcript:

Software in Acquisition Workshop Software Expert Panel Working Groups and Tasks Rick Selby DoD Software In Acquisition Workshop April 15-16, 2008 Institute for Defense Analyses, Alexandria, VA

NDIA Software Experts Panel Working Groups ● Requirements ● Risk/Estimation ● Quality

Voting for Payoff vs. Ease for “Big Ideas”

Payoff vs. Ease for “Big Ideas” Low High DifficultEasy Define software implications of competitive prototyping policy Lack of software requirements and technology maturity are causing most systems to fail Recommended guidance for defining architecture requirements and quantitatively identifying, predicting, evaluating, verifying, and validating quality characteristics and attributes Max score is 261 = 29*9 Body of knowledge for estimation Systems and software quality survey report (e.g., resources regarding: selection of characteristics, measurements, evaluation methods, etc.)

Knit Together Selected “Big Ideas” into Unified Proposed Initiative Leveraging Competitive Prototyping through Acquisition Initiatives in Integrated Systems and Software Requirements, Risk/Estimation, and Quality NDIA Software Experts Panel will use its working groups to emphasize: ● Requirements ● Risk/Estimation ● Quality

Leveraging Competitive Prototyping through Acquisition Initiatives in Integrated Systems and Software Requirements, Risk, Estimation, and Quality (1/3) ● Task 1: Conduct surveys and interviews of leading software professionals (government, industry, academia) to gather ideas, assess impacts, and sense expectations for Competitive Prototyping –14 days: Coordination of feedback from selected participation in DoD Workshop on Competitive Prototyping 4/28/08 –6 months: Summary report complete ● Task 2: Provide amplification of Competitive Prototyping memo for integrated SE/SW, [including where in the lifecycle there are opportunities for Competitive Prototyping [and how they can be contractually achieved]] –6 months: Initial sensing of guidance/implementation implications, including investigating the movement of Milestone B after System PDR –12 months: Specific guidance/implementation recommendations

Leveraging Competitive Prototyping through Acquisition Initiatives in Integrated Systems and Software Requirements, Risk, Estimation, and Quality (2/3) ● Task 3:Identify first adopters of Competitive Prototyping and facilitate and gather insights on effective usage, including collecting and analyzing data –6 months: Recommendations for programs, including lessons learned from previous similar programs that used competitive prototyping –12 months: Support kickoff of programs –18 months: Actively engaged with programs in facilitation and gathering insights ● Task 4: Develop guidance for early selection and application of integrated SE/SW quality systems for Competitive Prototyping [for RFP-authors] –6 months: 1 st draft, ready for limited circulation –18 months: 2 nd draft, ready for wide circulation

Leveraging Competitive Prototyping through Acquisition Initiatives in Integrated Systems and Software Requirements, Risk, Estimation, and Quality (3/3) ● Task 5: Develop Software Engineering Handbook for Competitive Prototyping including material explicitly targeted to different audiences (acquirer, supplier, etc.). Note: tasks 5 and 6 are tightly coupled. –6 months: Outline –12 months: 1 st draft, ready for limited circulation –18 months: Usage and evaluations on programs –30 months: 2 nd draft, ready for wide circulation ● Task 6: Develop training assets (materials, competencies, skill sets, etc.) that capture best-of-class ideas/practices for Competitive Prototyping. Note: tasks 5 and 6 are tightly coupled. –6 months: Outline –12 months: Scenarios and initial example materials including drafts coordinated with feedback from programs –18 months: Usage and evaluations on programs –24 months: 1 st draft, ready for limited circulation –36 months: 2 nd draft, ready for wide circulation