Dennis Coyne Excomm Jan 26, 2004

Slides:



Advertisements
Similar presentations
LIGO-G M May 17, 2006 Installation (INS) Requirements and Design Breakout Presentation NSF Review of Advanced LIGO Project Dennis Coyne, Caltech.
Advertisements

LIGO - G R 1 HAM SAS Test Plan at LASTI David Ottaway November 2005 LIGO-G Z.
LIGO-G M LIGO - The Laser Interferometer Gravitational-wave Observatory Vibration and Facility Considerations (incomplete) Dennis Coyne TMT Vibration.
Flavio Dal Corso - INFN Padova1 OPERA coll. meeting - Hamburg 3 July 2004 RPC & XPC Electronics Status Front End Boards (FEBs) Controllers HV system Crates.
LIGO-G D Quiet Hydraulics Board: Purpose, Scope, Charter and Plans Dennis Coyne Kick-off Stanford, 16 Oct 2003.
G R LIGO Laboratory1 Advanced LIGO Research and Development David Shoemaker LHO LSC 11 November 2003.
Target Status Report Lara Howlett University of Sheffield.
LIGO-G D Evaluation of EPI Approaches Dennis Coyne 18 April 2003 EPI Design Review #2.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
LIGO-G M 1 Conceptual Design Review: Initial LIGO Seismic Isolation System Upgrade Introduction Dennis Coyne April 12, 2002.
LIGO-G0200XX-00-M LIGO Laboratory1 Pre-Isolation Dennis Coyne LIGO Laboratory NSF LIGO Annual Review, at MIT 23 October 2002.
LIGO-G M LIGO Laboratory1 Adv. LIGO Installation (INS) Plans, Schedule, Costs, Team Plan, Schedule Costs Team.
LIGO-G M LIGO1 Hydraulic External Pre-Isolator (HEPI) Overall Installation Plan/Schedule Dennis Coyne HEPI Installation Readiness Review Feb 11,
G M Advanced R&D1 Seismic Isolation Retrofit Plan for the LIGO Livingston Observatory Dennis Coyne 29 Nov 2001.
LIGO-G M LIGO Laboratory1 Pre-Isolation Dennis Coyne LIGO Laboratory NSF LIGO Annual Review, at MIT 23 October 2002.
40m Suspension Electronics Benjamin Abbott California Institute of Technology 10/18/01 G R.
LIGO-G W Raab: Searching for Gravitational Waves w/ LIGO1 Why Has Duty Cycle Been Lower in Livingston.
LIGO-G M Advanced LIGO1 Finite Element Modeling Requirements Dennis Coyne Advanced LIGO, Seismic Isolation System (SEI) Structural Design & Fabrication.
LIGO-G M LIGO Laboratory1 Adv. LIGO Seismic Isolation (SEI) Plans, Schedule, Costs, Team Schedule »through R&D, including near-term plans »project.
LIGO-G D 1 Requirements Environment and constraints Performance requirements Functional requirements.
Investigation of the influence of suspended optic’s motion on LIGO detector sensitivity Sanichiro Yoshida Southeastern Louisiana University.
LIGO-G M Advanced LIGO1 Mass Limits & Balancing Dennis Coyne Advanced LIGO, Seismic Isolation System (SEI) Structural Design & Fabrication Bidder’s.
LIGO-G D partial ADVANCED LIGO1 Development Plan R&D including Design through Final Design Review »for all long lead or high risk subsystems »LIGO.
LIGO-G M 1 Initial LIGO Seismic Isolation System Upgrade Dennis Coyne LIGO Seminar March 29, 2002.
LIGO-G D 1 MEPI electroMagnetic External Pre-Isolator Backup alternative to the Hydraulic actuator approach Goal: maximum commonality with HEPI.
LIGO-G M April 5, 2006 Interferometer Sensing and Control (ISC) Cost and Schedule Breakout Presentation NSF Review of Advanced LIGO Project Richard.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
Active Seismic Isolation Systems for Enhanced and Advanced LIGO Jeffrey S. Kissel 1 for the LSC 1 Louisiana State University The mechanical system for.
LSC Meeting August ‘04 1 LIGO ADVANCED SYSTEMS TEST INTERFEROMETER (LASTI) Program Update: LSC Meeting, Hanford Dave Ottaway for the LASTI team August.
FAC, 10/12/06 D. Schultz 1 Readiness for 2007 Startup Linac Injector Controls ARR David Schultz.
EMDM Monolithic suspension development Activity plan Piero Rapagnani Detector meeting
G R Advanced LIGO Seismic Isolation R&D Dennis Coyne 8 Oct 2002.
4/25/11 G v3 1 Facility Modifications and Preparations (FMP) Technical Status Annual NSF Review of Advanced LIGO Project April , 2011 John.
Prototype Test of Vibration Isolation System Current Status & Schedule
Takanori Sekiguchi Anual Meeting of Physics Society of Japan Sep. 22nd, 2013) Prototype Test of Vibration Isolation System Current Status & Schedule 1.
Takanori Sekiguchi ALPS Report, Dec. 26th, 2013 Prototype Test of Type-B 1 Takanori Sekiguchi KAGRA F2F MEETING Feb
LIGO-G M 1 Conceptual Design Review: Initial LIGO Seismic Isolation System Upgrade Development, Implementation Plan & Schedule Dennis Coyne April.
ASPERA-3 Apr. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/00 Schedule statused.
Livingston 16 th August 2006 LIGO-G E HAM SAS Passive Seismic Attenuation System Fabrication, Assembly, Installation Ben Abbott, Valerio Boschi,
Magellan F/5 System Status A.Szentgyorgyi / Ann Arbor 25 Sept 2005.
LIGO- G D The LIGO Instruments Stan Whitcomb NSB Meeting LIGO Livingston Observatory 4 February 2004.
E v3 aLIGO SEI Testing and Commissioning Overall Plan
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
G M 1 HAM-SAS CCB information 22 Feb 06 Coyne, Shoemaker, Wilkinson.
G Consideration of HAM SAS for Advanced LIGO David Shoemaker LIGO Excomm 30 April 07.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
LSC Meeting March ‘05 1 LIGO ADVANCED SYSTEMS TEST INTERFEROMETER (LASTI) Program Update: LSC Meeting, LLO Dave Ottaway for the LASTI team March 2006 LIGO-G Z.
TeV BLM Review 4/19/041 Tevatron BLM Review - Schedule BLM Replacement Prototype schedule: Provide prototype digitizer cards, crate, readout path by ~
1 October 2003Paul Dauncey1 Mechanics components will be complete by end of year To assemble ECAL, they need the VFE boards VFE boards require VFE chips.
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
DOE/NSF Review of U.S. ATLAS May 21-23, 2003 CSC Mechanics and Electronics Paul O’Connor Tom Muller BNL May 22, 2003.
LSC Meeting March ‘07 1 LIGO ADVANCED SYSTEMS TEST INTERFEROMETER (LASTI) LASTI Progress and Plans LSC Meeting, LLO Dave Ottaway/Richard Mittleman March.
LIGO-G D Design Requirements Larry Jones Advanced LIGO, Seismic Isolation System (SEI) Structural Design & Fabrication Bidder’s Conference April.
LIGO-G M State of the LIGO Laboratory Gary Sanders LIGO/Caltech LSC Meeting, LLO March 16, 2004 State of LIGO.
1 Kazuhiro Yamamoto Institute for Cosmic Ray Research The university of Tokyo LCGT internal review (Cryogenic payload) 30 January 2012.
CMS-UK Oversight Committee 17/11/06 D.J.A. Cockerill - RAL 1 The CMS Electromagnetic Calorimeter UK Responsibilities Procurement and testing of VPTs Design.
LCLS-II Prototype Cryomodule Vacuum Vessel and HGRP Tom Peterson 4 December 2014 Design Review.
Tracker cooling plant refurbishment Project status Revised plan Financial impact.
Active Vibration Isolation using a Suspension Point Interferometer Youichi Aso Dept. Physics, University of Tokyo ASPEN Winter Conference on Gravitational.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
G R 2004 Plan Update LIGO Systems meeting 22 Jan 04 dhs.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
BSC HEPI Pier Amplification
Phase Camera hardware Nothing really new, only summarising status
The Superattenuator upgrades and the SAFE Project
Way to many People to List
Improving LIGO’s stability and sensitivity: commissioning examples
Presentation transcript:

Dennis Coyne Excomm Jan 26, 2004 Hydraulic External Pre-Isolator (HEPI) Status, Installation & Commissioning Plan/Schedule Dennis Coyne Excomm Jan 26, 2004 LIGO

Design Status All mechanical design completed & in production Real time control software is ~95% completed Receiving prototype low noise DAC this week from FDI for interface code testing Testing control laws ported from dSpace to VME: Basic functionality demonstrated ICS110B ADC code changes for reduced pipeline delay to be tested System Identification code nearly completed at LASTI Developing GDS tools to perform system id functions previously done in dSpace Have demonstrated safe system excitation with SOS ‘canary’ on the HAM table Control law development Algorithms/strategies demonstrated with ‘reasonable’ performance (I.e. > factor of 10 isolation in the 1 to 3 Hz band) Improvement in isolation at low frequency awaits testing at LLO (incorporating PEPI low frequency compensation design) Improvement at ‘high’ frequency (3 to 20 Hz) on the BSC awaits further testing at LLO &/or LASTI (once HEPI actuators re-installed on the BSC chamber) Resonant gain at suspension vertical bounce mode should work Plant inversion of the pier zero for control authority up to ~20 Hz seems difficult Pier stiffening or reaction mass actuators are a last resort LIGO

Design Status (continued) Electronics RFI-compliant layout completed and all cabling, EMI feedthroughs, connectors ordered Optical xmit/rec for interface to the timing system being designed All schematic work completed, re-packaging & re-layout work nearing completion On-schedule for chamber units to be completed by mid to late Feb LIGO

Production Status Mechanical 20+ actuators completed now and production rate good (large risk retired) All servo-control valves & custom nozzles received (but not yet calibrated) Valve calibration stand nearly completed – hope to start valve calibration this week Helical, machined springs, brackets, clamps, etc. nearly all completed All instrumentation (displacement sensors, seismometers) received Welded housing and ‘boot’ are late (both expected Dec) First units to be ready for fit check (unpainted) Feb 2-4 Expect first set to be received at LLO on or about 2/10 Pump station delayed a few weeks due to contractor problems with assembly and welded frame 2 frames due 1/27, balance of 5 by 2/2 Pump subassemblies have been completed First unit to be completed & leak tested by 1/30 Piping installation Initial bid (from on-site contractor) out of line, so re-bid Bids are in-line now – Source selection to be made 1/27 Schedule is ~7 to 10 weeks (depending upon contractor) LIGO

Production Status Continued Electronics All commercial-off-the-shelf (COTS) components have arrived except: High speed VME intel CPU boards, now expected early Feb Low noise DAC (which frees up Pentek bds for HEPI) VME backplane noise is interferring with on-board communications for 2 of the 8 channels Electronic parts being kitted and sent to stuffing house, as detaild layouts are completed Software Rolf & Alex to install HEPI code and the new DAQ reflective memory network (needed for HEPI) 2/16-27 LIGO

Cost Status CCB authorized $450K less than HEPI request Hoped for lower electronics cost Planned for one fewer system at LASTI Increased costs: Premium payment to actuator fabricator to reduce schedule risk Increased costs due to new machining setup for changes from prototype to production Increased contract labor support for design and fabrication/installation oversight Revised DAQ architecture to handle HEPI Bottom line ~$125K over CCB allocation (depends on how LLO labor costs are handled and on final electronics costs) LIGO

Installation Plans Chambers to remain under vacuum Have demonstrated installation at LASTI without disturbing the suspension and returning to final alignment/position Demonstrated system excitation (for system id) without disturbing the suspension Will monitor suspensions during HEPI installation and re-evaluate if/as needed Commissioning on non-HEPI tasks continues in parallel with HEPI Sequence is X-end, Y-end, Corner Piping installation first, followed by mechanical and electronics, then commissioning Two installation teams & two commissioning teams (BSC and HAM) in the corner station Installation procedure written (based on LASTI experience) and under team review LIGO

Installation & Commissioning Schedule LIGO

Installation & Commissioning Schedule LIGO