Javier A. Sevilla Interface & Configuration FAC Review April 16, 2007 1 Interface and Configuration Management Outline CF.

Slides:



Advertisements
Similar presentations
Jose Chan FAC- Undulator System Installation & Assembly 10/30/07 1 Undulator System Installation & Assembly Schedule Jose.
Advertisements

1.040/1.401 Project Management Spring 2007 Lecture 7 Dr. SangHyun Lee Department of Civil and Environmental Engineering Massachusetts Institute.
Kathleen Ratcliffe BC2/Linac Installation April 16, BC2 / Linac Installation Coordination Kathleen.
David Saenz FAC CF April 20, 06 Meeting of the LCLS Facilities Advisory Committee LCLS Conventional Facilities D. Saenz.
Richard M. Boyce FAC Review – Accelerator Installation October 29-31, Installation – Accelerator Systems Installation Planning.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
Jess Albino Session 5 Conventional November 11, Facility Advisory Committee LINAC Coherent Light Source Project.
Jose Chan and Kathleen Ratcliffe FAC Review- LTU/DUMP installation Status & 6/16/08 1 Linac Installation Status, Schedule.
Kathleen Ratcliffe LTU Installation October 30, LTU Installation Coordination Kathleen Ratcliffe.
David Saenz Facility Advisory October 30, 2007 CONVENTIONAL FACILITES MANAGEMENT.
1 David Saenz 1 Hutch Construction in FEH June 08, 2009 Hutch Construction in Far Experimental Hall David Saenz – Project Manager.
Jess Albino CF Breakout April 16, CONVENTIONAL FACILITIES Project Team CF Changes Electrical Engineer - done Mechanical.
Richard M. Boyce FAC April 16, LCLS Installation & Planning Integration process – IMT 2007 Installation Planning BTH.
Javier A. Sevilla MMF FAC Review October 27, Magnetic Measuring Facility (MMF) Outline Summary of Facility Requirements.
David Saenz Far Experimental Hall - June 17, Far Experimental Hall - Hutches Scope Budget Schedule.
1 Stefan Moeller 1 AMO Instrument Schedule ARR AMO Instrument Schedule Stefan Moeller – XES Manager June 30, 2009.
Mark Reichanadter LCLS FAC April 20-21, 2006 Meeting of the LCLS Facilities Advisory Committee LCLS Project Management M.
Jess Albino FAC CF April 16, 2007 Meeting of the LCLS Facilities Advisory Committee LCLS Conventional Facilities Jess.
Javier A. Sevilla CF Commissioning Plan-FAC June 17, CF LCLS Commissioning Plan Javier A. Sevilla Engineering Group.
Jess Albino Facility Advisory October 29, 2007 FACILITY ADVISORY COMMITTEE PLENARY CONVENTIONAL FACILITIES UPDATE October.
David Saenz CF Oct 30, CF MEP Commissioning.
M. Reichanadter LCLS Project June 2008 FAC Meeting Report to the LCLS Facilities Advisory Committee Project Management.
Richard M. Boyce FAC October 29-31, Installation Planning Integration process – IMT update Installation Planning &
Jess Albino Facility Advisory October 30, 2007 FACILITY ADVISORY COMMITTEE BREAKOUT SESSION 5 TURNER CONTRACT OVERVIEW.
John N. Galayda LCLS FAC October Linac Coherent Light Source Overview and Charge Facility Advisory Committee.
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
Jo Beth Folger FAC - CF Breakout – Sector April 8, Sector 20 Project Overview Sector 20 Site Plan Description Schedule.
Bob Law FAC Oct 24, Sector 20 Project Overview Sector 20 Site Plan Description Organizational Chart Schedule Cost.
David Saenz FAC November 11, 2008 SLAC National Accelerator Laboratory 1 Far Experimental Hutches David Saenz Project Manager.
Mike Scharfenstein FAC Review - November 11, 2008 SLAC National Accelerator Laboratory 1 Environment Safety & Health Status.
Michael Scharfenstein FAC April 16, 2007 LCLS CONSTRUCTION SAFETY Michael Scharfenstein.
Jose Chan FAC Review- LTU-DUMP Installation Status & 11/11/08 1 LTU-Dump Installation Status & Schedule.
Javier A. Sevilla April 5, Magnetic Measuring Facility (MMF) Outline Organizational Chart Facility Design Criteria,
M. Scharfenstein - ES&H Coordinator 8 June 2009
David McGiven FAC: Construction April 2006 Facility Advisory Committee (FAC) Construction Procurement David.
1 BROOKHAVEN SCIENCE ASSOCIATES As-Built Drawings and Commissioning Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional.
1 BROOKHAVEN SCIENCE ASSOCIATES LOB - Ring Building Construction Coordination Michael P. Bromfield Construction Engineer NSLS-II Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
1 Lori Plummer 1 LCLS Office Space FAC Review – Breakout Session CONVENTIONAL FACILITIES LCLS Office Space Lori Plummer, PMP,
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
Javier A. Sevilla Interface & Configuration FAC Review October 12, Interface and Configuration Management Outline.
David Schultz Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory 1 Undulator Complex Status LCLS Introduction.
David Saenz FAC Review CF Design, Cost and Schedule Oct 27, 2005 CF Overview & Status Design Status CMGC Status Latest.
Mark Reichanadter LCLS FAC October 12-13, 2006 Report to the LCLS Facilities Advisory Committee LCLS Project Management.
David Saenz Readiness for Oct 12, 2006 # Meeting of the LCLS Facilities Advisory Committee LCLS Conventional Facilities.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
John N. Galayda LCLS Accelerator Readiness December 2, LCLS Overview December 2, 2008 Project Construction Status.
David Saenz EIR Review Oct 9-11, Conventional Facilities (CF) WBS 1.9 ETC and Methodology David Saenz CF Systems Manager.
1 BROOKHAVEN SCIENCE ASSOCIATES CF Coordination with Technical Divisions Ove Dyling Conventional Facilities Advisory Committee Review October 5-6, 2010.
OTE Building PMG Report October 25, 2012 Rhonda Merchut 1.
2K CB FDR Overview:  Agenda, Charge, Review Process
Meeting of the LCLS Facilities Advisory Committee
Sector 20 Project Overview
Far Experimental Hall Hutches Civil Construction
Far Experimental Hall Hutches Civil Construction
CONVENTIONAL FACILITIES STATUS
Conventional Facilities (WBS 1
Conventional Facilities WBS 1.9
Shutdown Planning & Installation Schedule
CONVENTIONAL FACILITIES
Installation Status & Operational Readiness Process
Richard Hislop Construction Safety Coordinator
DOE Review of the LCLS Project October 2006
LCLS MMF Facility Status
Department Of Energy Review Linac Coherent Light Source Project
Javier A. Sevilla Conventional Facilities
AE Title III Status Introduction
CF Scope, Management & Organization
BC2 / Linac Installation Coordination Kathleen Ratcliffe
DOE Status Meeting of the LCLS Project
Presentation transcript:

Javier A. Sevilla Interface & Configuration FAC Review April 16, Interface and Configuration Management Outline CF Engineering Group and IMT Roles Design Changes since last FAC RFI’s and Submittals Status On-Going and Upcoming Activities Issues and Concerns Summary

Javier A. Sevilla Interface & Configuration FAC Review April 16, CF Engineering Group UTR IMT Design RFI’s Installation Inspections Interfaces Submittals

Javier A. Sevilla Interface & Configuration FAC Review April 16, Organization CF Engineering Group Engineers-TBD D. Saenz-CF System Manager D. McDonald-Deputy See J. Albino presentation for complete Chart J. Cranston J. Gong J. Albino-Associate Director Civil Construction A.Comelo M. Zyruba Project Engineer UTR Electrical Lori Shewchuk Structural Ken Yang Group Leader Javier A. Sevilla Electrical/CEF Karen Chan-Hui AE’s (MTH)

Javier A. Sevilla Interface & Configuration FAC Review April 16, Roles and Responsibilities CF LCLS Engineering Group Coordination of design with A/E firms (JE, MTH,etc) Primary interface with Physics requirements for CF changes Interface with Jacobs Title III Support Interface with Turner Co. for RFI’s, Submittals, etc. Design of small engineering projects for Tech. Systems Coordination with Integration Management Team (IMT) members Interface and coordination of Engineering issues with SLAC Departments (Fire Marshal, CEF, ES&H, Building Inspection Office (BIO), etc)

Javier A. Sevilla Interface & Configuration FAC Review April 16, Design Changes since last FAC Design Change Requests (DCR) Approved (scope and funding) Service Buildings Power: IMT-DCR (Controls-CF) Offset Mirror support pad relocation: IMT-DCR (XTOD/XES-CF) Electron Beam dump: IMT-DCR (Linac-CF) NEH Concrete Wall Penetrations: IMT-DCR (XTOD/XES-CF) BTH West Room Data Sheets (RDS) (CF-all) DCRs in process FEE Electrical Alcove: IMT-DCR (XTOD/XES-CF) NEH Floor Plan Re-design (XTOD/XES-CF) LCW for LTU (PM/Linac-CF) Others CLOC De-scoping Issues being worked PPS requirements for CF (lighting controls, AC power, HVAC/ventilation controls, etc) Concrete floor anchor installations See R. M. Boyce Talk for Details

Javier A. Sevilla Interface & Configuration FAC Review April 16, CF Configuration Management Interface Control Documents (ICD’s), ESD JE Construction Bulletins: CB#1 and CB#2- VE’s CB# 3-Mirror Foundation, Fire Hazard Analysis Updates CB# 4-Electrical duct bank across EBD area CB# 5-Electron Beam Dump Mods and FEE wall Approvals (WAF, ESH, etc) for all design documents by AE consultants (JE, MTH, etc.) Release of APPROVED drawings and specifications by LCLS QA All documentation (drawings and Specs) on LCLS Share point Web Server Submittals and shop drawings review (Approvals, JE, CF LCLS, ESH, CEF, etc.) Integration Management Team (IMT) Process for DCR’s

Javier A. Sevilla Interface & Configuration FAC Review April 16, RFI’s and Submittal Process All RFI documentation via Turner Talk (access CF LCLS, JE and Subcontractors) Daily Coordination with JE Title III on-site liaison and Project Engineers from Turner Construction Weekly meetings (Turner, JE and LCLS) to review and set priorities on RFI’s Internal Coordination with CF LCLS and other SLAC Department to respond to RFI’s Submittals (electronic and hard copies) Quick Review of Submittals prior sending them to JE

Javier A. Sevilla Interface & Configuration FAC Review April 16, RFI’s and Submittals Status RFI’s Bidding: 181,Re-opened: 49 Construction: 300, Re-opened: 59 (as April 16-07) Submittals: 177

Javier A. Sevilla Interface & Configuration FAC Review April 16, CF Design and Coordination Activities Being Implemented: Linac Electrical Upgrades (S21-S30) Electrical Feeder to BTH CUP/FEH substation 12.47kV RFI responses  FCO Coordination 2007 SLAC shutdown Temporary Power (12.4kV, 480 volts) Steel Plates (EBD, FEE) S20-MEP designs-100% Upcoming: BTH West and Service Buildings Design Gas Piping to CUP Power feeders to racks Cold Baffle CF Infrastructure PCW in FEE CF activities in Installation schedule Data/Phone cable backbone installation Power to PPS

Javier A. Sevilla Interface & Configuration FAC Review April 16, Commissioning of LCLS Infrastructure Commissioning of Systems Develop SOW for prospective bidders Implement JE Commissioning Plan Establish Commissioning Team Commissioning Authority (CA) Turner MEP Coordinator, Art Pimentel Subcontractors ( Mechanical, HVAC Controls, Electrical, Fire Alarm, Fire Protection, etc) SLAC Conventional and Experimental Facilities (CEF) Transfer ALL systems to CEF after BO

Javier A. Sevilla Interface & Configuration FAC Review April 16, Issues and Concerns A lot of activities and limited resources Changes from Technical Systems RFI’S and Change Requests from Subcontractors Multi-tasking (engineering, coordination, UTR support, IMT, SLAC Depts.) Small changes take time and resources! Quality of engineering support to the construction activities and changes (due time and resources)

Javier A. Sevilla Interface & Configuration FAC Review April 16, Interface and Configuration Management SUMMARY Engineering TEAM is in place, coordinating designs, and providing support to Construction Activities and Technical Systems. Engineering Group in the primary interface between ALL technical systems, A/E consultants, Turner, SLAC Departments: ESH, CEF, etc. Questions? THANKS

Javier A. Sevilla Interface & Configuration FAC Review April 16, END

Javier A. Sevilla Interface & Configuration FAC Review April 16, Reference Slides Following are some slides being provided for Quick Reference

Javier A. Sevilla Interface & Configuration FAC Review April 16, Integration Management Team (IMT) PMD D.Saenz J.Turner H.Tompkins J.Sevilla R.M Boyce D.Marsh IMT is in place and working! R.Pope R. Fuller

Javier A. Sevilla Interface & Configuration FAC Review April 16, CF Configuration Management Documentation is available to ALL LCLS Collaborators Drawings and Specs in PDF

Javier A. Sevilla Interface & Configuration FAC Review April 16, Web Based Storage and Communication Tool Documentation from Turner LCLS%20Document%20Storage/01%20-%20LCLS%20Systems/ConvFac%20External/Turner/default.aspx

Javier A. Sevilla Interface & Configuration FAC Review April 16, Web Based Storage and Communication Tool Documentation from Jacobs LCLS%20Document%20Storage/01%20-%20LCLS%20Systems/ConvFac%20External/Jacobs/default.aspx