D. Li – RF Session Summary at CM17, CERN, Switzerland (25 February 2007) 1 Summary of RF Sessions Derun Li Center for Beam Physics Lawrence Berkeley National.

Slides:



Advertisements
Similar presentations
MICE RF Cavities and RFCC Module Update Derun Li Lawrence Berkeley National Laboratory MICE RF Workshop Daresbury Laboratory, UK April 17, 2012 April 17,
Advertisements

MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Muon Front End Buncher, Phase Rotation, Cooling Schematics & CAD model based on MICE Cavities Alan Grant Daresbury (April 10, 2012)
Andrew Moss ASTeC MICE Project Board 28 th June 2011 MICE RF System.
MICE Refurbishment of CERN RF equipment for MICE M. Vretenar, CERN AB/RF.
Collaboration meeting, RAL, 4 th – 7th November 2009 Andrew Moss ASTeC Collaboration meeting, RAL, 10 th – 13 th november 2009 MICE RF Amplifier Status.
Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
MuCool Test Area RF Workshop Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 15, 2010.
RF Measurement Plan Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory January 20, 2011 MICE Video Conference Meeting.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
Status of the 201 MHz Cavity and Coupling Coil Module Steve Virostek Lawrence Berkeley National Laboratory MICE Video Conference March 10, 2004.
Installation Issues Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 13, 2009.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
Safety Review: RF Issues Derun Li Absorber Safety Review December 9-10, 2003 Lawrence Berkeley National Laboratory Berkeley, CA
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
Status of 201 MHz Prototype and RFCC Module Derun Li, S. Virostek, M. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory In collaboration.
Design of the MICE RF Cavity Module :Status of the module designModule flange sealing options Steve Virostek Lawrence Berkeley National Lab MICE
RFCC Module Tech Board Schedule Discussion Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 4, 2009.
H. Haseroth Thursday, February 5-8, 2002 MUCOOL / MICE 1 RF & RF power H. Haseroth CERN  Situation of 88 MHz test cavity  Availability of amplifiers.
MuCool RF Status MICE Collaboration Meeting June 7-10, 2006, Fermilab A. Moretti June 9, 2006.
5-Year RF R&D Plan Derun Li Lawrence Berkeley National Laboratory NFMCC and MCTF Phone Meeting Friday, September 18, 2009.
RF Cavity / Coupling Coil Module
RF Summary Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICE Collaboration Meeting.
Assembly, Installation and Interfaces Steve Virostek Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008.
Andrew Moss ASTeC 7 th December 2011 MICE RF System.
MICE RF Project & Towards Step VI MICE Project Board - March 8, 2012 Alan Bross 1.
Progress on the MuCool and MICE Coupling Coils * L. Wang a, X. K Liu a, F. Y. Xu a, A. B. Chen a, H. Pan a, H. Wu a, X. L. Guo a, S. X Zheng a, D. Summers.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
NCRF R&D Programs and Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MUTAC Review at BNL April 28, 2004.
201 MHz and 805 MHz Cavity Developments in MUCOOL Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Nufact 2002 Workshop, London,
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
1 MICE RF Daresbury Laboratory Support Joe Orrett - ASTeC.
Status of RFCC-Module Development Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting at INFN-LNF, Frascati,
201 MHz NC RF Cavity R&D for Muon Cooling Channels
MICE RF System - Status Alan Bross Fermilab. RF Cavities for MICE I Eight 201-MHz cavities in the MICE cooling channel First five cavities arrived at.
201-MHz RF Cavity Construction (Plan) for MICE Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory NFMCC Meeting March 17, 2008.
Andrew Moss ASTeC Collaboration meeting CM29 15 th - 18 th February 2011 MICE RF System.
1 paul drumm, 19 th May 2004 MICE RF By Phone at 16:00 FNAL: Al Moretti LBNL: Derun Li
201 MHz Cavity Status and Test Plans at MTA MICE Collaboration Meeting at RAL, UK October 22 ~ 24, 2005 Derun Li Center for Beam Physics Lawrence Berkeley.
Normal Conducting RF Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory March 5-6, 2013.
Andrew Moss ASTeC CM32 9t h February 2012 RAL MICE RF System.
MCTF 8/17/06 A. Bross MTA Activities and Plans MCTF August 17, 2006 A. Bross.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
Summary of the RF Parallel Session Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting 18 June 16, 2007.
Topical workshop on The Neutrino Factory and Muon Collider Oct 2007 RF Systems for a Neutrino Factory Rebecca Seviour Cockcroft Institute Lancaster University.
RF studies at Fermilab MuCool Test Area Fermilab MuCool Test Area MuCool Test Area (MTA) at Fermilab is a dedicated facility at the end of the LINAC built.
MICE RF Cavities and RFCC Module Update Allan DeMello and Derun Li Lawrence Berkeley National Laboratory MICE CM32 at RAL, UK February 9, 2012 February.
MTA RF Status 01/31/ 2007 NF&MCC Meeting UCLA A. Moretti.
MICE RF Cavity Measurements Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory July 8, 2010 Rutherford Appleton Laboratory, UK.
Spectrometer Solenoid Fabrication Status and Schedule RF Cavity / Coupling Coil Module Plan and Progress Steve Virostek Lawrence Berkeley National Lab.
A. Bross MICE CM17 February MuCool RF Program 805 and 201 MHz Studies.
MICE RF Coupling Coil Magnets Update Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory October 6, 2010 Sofia, Bulgaria.
Update on 201-MHz RF Cavity Construction (Plan) for MICE
1 Alan Bross AEC March 31, 2008 MuCool RF Program Muon Cooling R&D Alan Bross.
Andrew Moss ASTeC TIARA Mid term meeting 12 th 14 th June 2012 CIEMAT ICTF Progress on the MICE RF System.
MICE RF System Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Andrew Moss STFC Daresbury Laboratory MICE UK.
MICE RF Power Status Paul Drumm ~ Sunday August 1 st 2004.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory Oxford, UK July 7, 2011 July 7, 2011.
Progress on MICE RFCC Module for the MICE Experiment * Allan DeMello, Nord Andresen, Michael Green, Derun Li, Heng Pan, Steve Virostek, Michael Zisman.
MICE RFCC Module Update Steve Virostek Allan DeMello Lawrence Berkeley National Laboratory MICE CM27 at RAL, UK July 8, 2010.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
Status of MICE RF for Step V’ (at LBNL) Derun Li Lawrence Berkeley National Laboratory December 6, 2014.
MICE CC Magnet Cryostat Design Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE CC Cryostat Design Review LBNL, February.
201 MHz Cavity Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory February 11, 2011 MAP Friday Video Conference Meeting.
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
RFCC Engineering Status and Plans Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Meeting March 6, 2012 March 6, 2012.
Andrew Moss ASTeC, Daresbury Laboratory October 2010 MICE RF Amplifier Status.
MuCool Test Area Dedicated facility built at the end of the Linac to address MuCool needs RF power 805MHz, 201MHz)
Overview of the RFCC Module and 201-MHz Cavity Design
Presentation transcript:

D. Li – RF Session Summary at CM17, CERN, Switzerland (25 February 2007) 1 Summary of RF Sessions Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting at CERN, Switzerland 25 February 2007

D. Li – RF Session Summary at CM17, CERN, Switzerland (25 February 2007) 2 Agenda 9:00 AM ~ 12:30 PM, Friday, 23 February 2007 ( ) 201 MHz RF system for MICE201 MHz RF system for MICE –by Peter CORLETT and Joe ORRETT (Daresbury Laboratory) Design of the MICE RF Cavity ModuleDesign of the MICE RF Cavity Module –by S. VIROSTEK (LBNL) MTA RF programs and progressMTA RF programs and progress –by Alan BROSS (FNAL) Coffee break Refurbishment of CERN RF equipmentRefurbishment of CERN RF equipment –by Maurizio VRETENAR (CERN AB/RF) Multifactoring Study ProgressMultifactoring Study Progress –by Rebecca SEVIOUR (Cockroft Institute) Progress at RALProgress at RAL –by Chris NELSON (RAL) DiscussionsDiscussions

D. Li – RF Session Summary at CM17, CERN, Switzerland (25 February 2007) MHz RF system for MICE What needs to be done? Build up and demonstrate operation of the amplifiers needed to power the MICE RF cavities 201 MHz at ~ 2.5MW Two amplifier stages Equipment loaned to MICE from LBNL (in various states of disrepair) Summary by P. Corlett Most equipment for the Burle 4616 is in place –One old tube and two new ones We are on track to test the 4616 system in June 2007 Work on the TH116 systems will begin immediately after 4616 tests –This is where the hard work starts! –Major mechanical effort (4~6 months!) Aim to test a complete amplifier chain late 2007

D. Li – RF Session Summary at CM17, CERN, Switzerland (25 February 2007) 4 MICE RF System Ready for tests!

D. Li – RF Session Summary at CM17, CERN, Switzerland (25 February 2007) 5 Hardware photos of 4616 circuits Solid state amplifierSolid state amplifier Power supplyPower supply Rack is in placeRack is in place Water circuits have been connected & testedWater circuits have been connected & tested Old 4616 tube has been installed.Old 4616 tube has been installed. Two new tubes on siteTwo new tubes on site

D. Li – RF Session Summary at CM17, CERN, Switzerland (25 February 2007) 6 LLRF for MICE Functions: RF DriveRF Drive Amplitude Set/ControlAmplitude Set/Control Phase Set/ControlPhase Set/Control Pulse ControlPulse Control SynchronisationSynchronisationOptions Rossendorf analogue systemRossendorf analogue system AD9910 (new, not available yet)AD9910 (new, not available yet) Conclusions by J. Orrett The Rossendorf analogue LLRF system provides a proven RF control system. However it lacks the flexibility and potential for upgrading the AD9910 has. A sensible approach is to have the Rossendorf LLRF as a proven “fallback position” whilst evaluating the AD9910. The AD9910 is not yet commercially available but DL should be able to purchase evaluation boards in the near futureThe Rossendorf analogue LLRF system provides a proven RF control system. However it lacks the flexibility and potential for upgrading the AD9910 has. A sensible approach is to have the Rossendorf LLRF as a proven “fallback position” whilst evaluating the AD9910. The AD9910 is not yet commercially available but DL should be able to purchase evaluation boards in the near futureSuggestions Possibility for using the same LLRF as CERN SNS LLRF (LBNL FPGA based system)

D. Li – RF Session Summary at CM17, CERN, Switzerland (25 February 2007) 7 Design of the MICE RF Cavity Module by S. Virostek RFCC module design statusRFCC module design status Integration of MICE Cooling channelIntegration of MICE Cooling channel –Options for vacuum seal –Options for module joints

D. Li – RF Session Summary at CM17, CERN, Switzerland (25 February 2007) 8 RFCC Module Design Status Prototype 201 MHz cavity is at FermiLab awaiting high power RF testing with applied magnetic field.Prototype 201 MHz cavity is at FermiLab awaiting high power RF testing with applied magnetic field. Two 42 cm  curved Be windows have been fabricated by Brush Wellman. 3rd window is under way.Two 42 cm  curved Be windows have been fabricated by Brush Wellman. 3rd window is under way. Coupling coil design is under way at ICST in Harbin. Details of ICST/LBNL collaboration are being worked out.Coupling coil design is under way at ICST in Harbin. Details of ICST/LBNL collaboration are being worked out. Base mounting scheme for RFCC and other MICE modules has been established by RAL.Base mounting scheme for RFCC and other MICE modules has been established by RAL.

D. Li – RF Session Summary at CM17, CERN, Switzerland (25 February 2007) 9 Joint Seal Options RF Module AFC Module Weld ~36 Bolts Metal Wire Seal or O-ring Commercial Bellows Weld Lip Long discussions: O-rings vs metal seals O-rings vs metal seals Summary on Pros and Cons (see S. Virostek’s talk) Summary on Pros and Cons (see S. Virostek’s talk) R&D program for seals?

D. Li – RF Session Summary at CM17, CERN, Switzerland (25 February 2007) 10 MTA RF Progress by A. Bross

D. Li – RF Session Summary at CM17, CERN, Switzerland (25 February 2007) 11 MTA Hall Instrumentation CsI Plastic Scintillator Magnet Chipmunk

D. Li – RF Session Summary at CM17, CERN, Switzerland (25 February 2007) 12 Focus of the RF R&D Study the limits on Accelerating Gradient in NCRF cavities in magnetic fieldStudy the limits on Accelerating Gradient in NCRF cavities in magnetic field HoweverHowever –We believe that the behavior of RF systems in general can be accurately described (predicted) by Tensile strength of the material(s) used in the cavity fabrication (T)Tensile strength of the material(s) used in the cavity fabrication (T) Local surface field enhancements (  eq )Local surface field enhancements (  eq ) E surf =    2T/    /  eq –This applies to all accelerating structures In SC structures local heating becomes problem firstIn SC structures local heating becomes problem first –Follows universal curve

D. Li – RF Session Summary at CM17, CERN, Switzerland (25 February 2007) 13 Status and Plans 805 MHz pillbox cavity test magnetic fields805 MHz pillbox cavity test magnetic fields –Confirmed previous experimental results –Switch to button tests in a few weeks 201 MHz cavity had run well before without magnetic field, but201 MHz cavity had run well before without magnetic field, but –Full RF power reflection, appears to be shorted –Low power measurement found no problem –The problem seemed to stem from the fact that parts from multiple vendors where used in the 4” coax run Power couplerPower coupler Straight sectionsStraight sections ElbowsElbows –At the interfaces between parts from different vendors, the fit-up was not ideal Inner conductor specifications seemed to varyInner conductor specifications seemed to vary This has now been fixedThis has now been fixed In addition we will be using pressurized (12 pisg) SF6 in the 4 ” coax run as the insulating gas instead of airIn addition we will be using pressurized (12 pisg) SF6 in the 4 ” coax run as the insulating gas instead of air

D. Li – RF Session Summary at CM17, CERN, Switzerland (25 February 2007) 14

D. Li – RF Session Summary at CM17, CERN, Switzerland (25 February 2007) 15 Latest Electric field limit Data at 2.5-T and 1.25-T in the LBNL Single Cell Cavity with Curve Be Windows coated with TiN  The Asymptotic limit line shown indicates the continuous Gradient sparking limit. In all the cases studied including Lab G this line as predicted the Gradient Limit for the cases under Study.  For the 1.25 T case the Save operating limit has been shown to be 20 MV/m 2.5 T Data 1.25 T Data RF Conditioning without Magnetic Field Asymptotic Gradient limit line at 1.25 T

D. Li – RF Session Summary at CM17, CERN, Switzerland (25 February 2007) 16 High Pressure H 2 Filled Cavity Work Muons Inc. High Pressure Test CellHigh Pressure Test Cell Study breakdown properties of materials in H 2Study breakdown properties of materials in H 2 Run in B fieldRun in B field –No degradation in M.S.G. up to  3.5T Gas filled Cavity

D. Li – RF Session Summary at CM17, CERN, Switzerland (25 February 2007) 17 Refurbishment of CERN RF equipment for MICE M. Vretenar CERN AB/RF

D. Li – RF Session Summary at CM17, CERN, Switzerland (25 February 2007) 18 CERN Linac1 amplifiers Developed in Developed in Photo taken in 1959 for the old Photo taken in 1959 for the old Linac1 amplifier  Linac1 amplifier  Frequency MHz, equipped with the TH170R triode, can deliver a maximum of 2.5 MW with an anode voltage of 40 kV, but near delivered for more than 1.7 MW. The tube is water cooled, and can operate at a maximum of 0.3% duty cycle. The unit is about 3.6 m high, 1m x 1m base. Only 2 units left, one was modified for 101 MHz and then 88 MHz (gradient test for bunch rotation cavities in NF), the other is a cannibalised spare, stored in a hall for 50 years.

D. Li – RF Session Summary at CM17, CERN, Switzerland (25 February 2007) 19 Caveats F The refurbishment of the linac amplifiers for MICE has been authorized by the AB Department (Nov. 06), but there are still some doubts concerning the level of UK support to CLIC… F The CERN Linac RF team is heavily involved in Linac4 and from next year will work 100% on this project  it is now or never, this year we still have a window for at least starting refurbishing the amplifiers, from next year it will be very difficult.

D. Li – RF Session Summary at CM17, CERN, Switzerland (25 February 2007) 20 Organisation of work Principle: the reconstruction is done at CERN, up to the testing of filament. Then, the amplifier is transferred to RAL or Daresbury for the RF tests. At CERN: 1.Collect drawings, and design modified parts. 2.Make inventory of existing and missing parts. 3.Machine mechanical parts. 4.Dismount, clean, reconstruct amplifiers. 5.Assemble ventilation circuitry. 6.Assemble filament circuit and filament regulation (PLC based, CERN standard) 7.Test filament and ventilation These activities can be realized with minimum support of CERN staff if temporary labor is used for: draftsman/designer, mechanic, wireman. At MICE: 1.Install cathode switch circuit (eventually also HOM suppressors). 2.Connect HV and RF loads. 3.Test with RF power. Suggestions: involvement of MICE people

D. Li – RF Session Summary at CM17, CERN, Switzerland (25 February 2007) 21 Summary 201 MHz RF system (DL and CERN)201 MHz RF system (DL and CERN) RF R&D with magnetic fields at FNALRF R&D with magnetic fields at FNAL –805 MHz button tests –201 MHz cavity conditioning –Multipactoring studies RFCC module integration RFCC module integration Progress at RAL by Chris NELSON was not covered here, but can be found at MICE web site soon. Lots progresses inProgress at RAL by Chris NELSON was not covered here, but can be found at MICE web site soon. Lots progresses in –Decay solenoid –Beamline –Presented with 5o+ photos –… No plan for MICE cavity yetNo plan for MICE cavity yet Pending issues: cavity amplitude and phase measurement and stabilityPending issues: cavity amplitude and phase measurement and stability –A joint session with DAQ group future