P09451 Mid-Project Review Bryan McCormick (ME) Project Manager Andy Freedman (ME) Heat Transfer/Fluids Analysis & Design John Kreuder (ME) Thermal Modeler.

Slides:



Advertisements
Similar presentations
Composite Filament Winding Machine: P09226 Shijo George Christofer Brayton Alex Sandy Tiago Santos Daniel Weimann Project Manager Electrical Engineer Chief.
Advertisements

Mechanical Measurement and Instrumentation MECN 4600
P11511 Project Review. Project Team, Faculty, and Customer Project Team: – Project Lead: Kevin Argabright (ME) – Team Members: John Fitch Dean (ME) Mike.
P11462: Thermoelectric and Fan System for Cook Stove Jared RuggProject Manager (ME) Brad SawyerLead Engineer (ME) Jeff BirdMechanical Engineer Tom GorevskiElectrical.
LFTB Proprietary Information 1 Fuser test bed ™ R I T MSD1 Project Review February 22, 2007 Fuser Test Bed P07501 IE TEAM Justin McMillan – Project Lead.
Project Status Update II R09230: Open Architecture, Open Source Unmanned Aerial Vehicle for Imaging Systems A. Benjamin Wager (ME) B. Michael Skube (ME)
P09451 Thermo-Electric Module for Large Scale Systems Bryan McCormick-ME(Team Lead) Andy Freedman- ME John Kreuder- ME Jon Holdsworth- EE Gabriela Santa.
Team Members: Bryan McCormick (ME) Andy Freedman (ME) John Kreuder (ME) Ken McLoud (ME) Jon Holdsworth (EE) Gabriela Santa Cruz (IE) Thermoelectric Module.
P08456-LED Lighting for an Underwater ROV Jeremy Schiele-Project Manager Jonathan Lent-Mechanical Engineer Ryan Seeber-Computer Engineer Justin VanSlyke-Mechanical.
R I T Advisors: Dr. Wayne WalterMechanical Engineering Dept. Faculty Jeffrey WebbTeacher’s Assistant Team Members: Aman Verma EE - Electrical Craftsman.
P09451 Detailed Design Review Bryan McCormick (ME) Project Manager Andy Freedman (ME) Heat Transfer/Fluids Analysis & Design John Kreuder (ME) Thermal.
Concept Generation. Power Unit Overall Design Fin Design Modules Ease of AssemblyAir Cooling -Fins -Flow Path -H20 Changeover -1 interchangeable power.
P09451 System Level Review Bryan McCormick (ME) Project Manager Andy Freedman (ME) Heat Transfer/Fluids Analysis & Design John Kreuder (ME) Thermal Modeler.
06411 Micro Nucleating Bubble Engine Team Members Steven Nathenson Joseph Pawelski Joaquin Pelaez Andrew Pionessa Brian Thomson Project Sponsors Dr. Crassidis.
P09451 Final Project Review Bryan McCormick (ME) Project Manager Andy Freedman (ME) Heat Transfer/Fluids Analysis & Design John Kreuder (ME) Thermal Modeler.
P07007: Adapted Home Entry Sponsor: National Science Foundation Wenbo Chen Project Manager, EE Tanvir Rasel EE Meklet Kidane EE Faculty Mentors: Dr. Elizabeth.
Thermal Solar Panel Protection Project Team: Krista Miller Sohaib Hasan John Helme.
CSC230 Software Design (Engineering)
Pharmaceutical Water Systems Alain Kupferman Manufacture of sterile medicines – Advanced workshop for SFDA GMP inspectors, Nanjing, November 2009.
MSD II –Managerial Presentation Spring 2009 P09454: Design & Testing of Centrifugal Pump Components.
P13621: Conductive Heat Transfer Lab Equipment MSD II: Final Project Review 10 May, 2013 RIT KGCOE.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
Heat transfer in turbulent flow CL Aim To determine the overall heat transfer coefficient & the individual film transfer coefficient and verify.
Jon KleinISEProject Manager Nguyen VuMETechnical Lead Kyle MengesMETechnical Lead Christine LowryMEDesign Engineer Chris SteinMEDesign Engineer Priya NarasimhanEEElectrical.
System Design Review April 5th, 2013 P13623: Conductive Heat Transfer Lab Equipment.
LSU 05/13/2004Mechanical Design Guidelines1 Ballooning Unit, Lecture 4.
1 Denis Grondin / Julien Giraud – 01 December 2008 SLAB COOLING Denis Grondin Julien Giraud
Gravity Fed System Team Members: James Brinkerhoff, Christopher Kulbago, Patrick O’Connell, Lauren Pahls, Ted Rakiewicz, Sarah Salmon Group Number: P13631.
T.M.F.T: Thermal Mechanical Fatigue Testing Wale Adewole Siyé Baker Heriberto Cortes Wesley Hawk Ashley McKnight.
AMS02 TIM CAB Project Status JSC, January 2007 Prepared by H. Cuesta / G. Muñoz.
Power Control System for a Concrete Durability Test Cabinet – Phase 2 Jacob Jameson Madhav Kothapalli Thomas Persinger Andrew Versluys.
Automatic Shift Controls for ATV Sponsored by: Joel Notaro Polaris Industries Advised by : Professor George Slack Project Family: Modular, Scalable, Open.
MSD I – Mid Project Presentation Winter 08/09 P09454: Design & Testing of Centrifugal Pump Components.
Project Status Report Presenter Name Presentation Date.
Senior Design Team #18 Lacey Ednoff Brianna Beconovich Jarimy Passmore Jesse Poorman.
One-dimensional modeling of TE devices using SPICE International Summerschool on Advanced Materials and Thermoelectricity 1 One-dimensional modeling of.
1 Thermal tests planning for mock-up TM0 Thermal tests planning for CLIC prototype module type 0 May 30th,
THROUGH NERANJAN DHARMADASA JAMES BROWN P09451: Thermo-Electric Module for Large Scale Systems.
Nanofluidic Characterization David Sharp David West Justin Davis.
Update on Micro Channel Cooling Collaboration Meeting , G. Nüßle.
P16680: AATech Universal Oil and Bag System System Design Review 9/29/15.
System A collection of parts that perform a function.
P09451 Thermo-Electric Module for Large Scale Systems Bryan McCormick- ME (Team Lead) Andy Freedman- ME John Kreuder- ME Ken McLoud - ME Jon Holdsworth-
Project Kick Off R09233: Flight Parameter Measurements Michael Skube (ME)
Introduction to LabVIEW. Overview Objectives Background Materials Procedure Report/Presentation Closing.
Status of Vertical Test Stand at RRCAT P Shrivastava, P Mohania,D.Baxy, Vikas Rajput S C Joshi, S Raghavendra,S K Suhane RRCAT, Indore November 26, 2012.
“UV Tube” Water Disinfection P07402 Project Review 23 February 2007 Sponsored by Dr. Andres Carrano and Dr. Brian Thorn of the KGCOE ISE Department.
P08441:Thermoelectric Auto Exhaust Power Generation Project Introduction : The motivation for this project stems from an increasing need for highly efficient.
Joseph Ferrara Team Lead (ME) Joseph ChurchDesign Engineer (ME) Joshua Van Hook LabView Engineer (EE) Jamie Jackson Electronics (EE) Joelle Kirsch Project.
MOBILE CAMERA CONTROL SYSTEM. Team Members Ruth Ayalon – ME Ruth Ayalon – ME Erin Gillespie -ME Erin Gillespie -ME Claudia Forero –ISE Claudia Forero.
Advisor: Dr. Shangchao Lin
Advisor: Dr. Shangchao Lin
P07307: Controls for Dynamic Suspension
Date of download: 10/23/2017 Copyright © ASME. All rights reserved.
P07203 Dynamometry Laboratory Infrastructure
P08441:Thermoelectric Auto Exhaust Power Generation
P13623: Conductive Heat Transfer Lab Equipment
(vertical cryostat, Gersemi)
Extended Surface Heat Transfer
AUTOMATIC SHIFT CONTROLS FOR ATV SPONSOR: POLARIS INDUSTRIES
Cold Pressure Fusing II Team Fusion
P08002-Automated Parallel Bars
HEMODYNAMIC SIMULATOR II P09026
P09451 Thermo-Electric Module for Large Scale Systems
Project Review P07442: Thermoelectric Demonstration Test Bed
Team P15441 Mini Air Sub-System Design Review
SENIOR DESIGN PROJECT P08455
SENIOR DESIGN PROJECT P08455
Detailed Design Review (Phase 4)
Presentation transcript:

P09451 Mid-Project Review Bryan McCormick (ME) Project Manager Andy Freedman (ME) Heat Transfer/Fluids Analysis & Design John Kreuder (ME) Thermal Modeler Ken McLoud (ME) Structural Designer Jon Holdsworth (EE) Electrical System Designer Gabriela Santa Cruz (IE) Engineering Economics Sponsored by:

Current System

Project Description Improved test stand for studying thermo-electric modules High Level Customer Needs: –Implement air-cooling on cold side of thermo-electric array in addition to the water-cooling system. –Be able to experimentally validate thermoelectric system models and enable more parameters to be explored. –Improve user interface and data acquisition to allow greater ease of use of the test stand. –Improve set-up and shut-down procedures to reduce assembly times

System Architecture

Piping

Valves for Air/H2O Interchange

Power Unit Improved Tool Clearance Force Sensors

Power Unit 4 zones Interchangeable Fins

Power Unit

Permanently Mounted Thermocouples

Current Status Design meets all needs except –CN12: Quantify temperature distribution across module reliably Design meets all specifications except –A iii.: Measure thermal gradients across hot and cold module surfaces –C ii.: Over-temperature shutdown for heater –D ii.: Reduce module failures during exchange and assembly

Current Status On target to meet $7500 budget –Current budget ~$5700 Schedule: –Design completed on schedule –Minor design revisions to be completed within next week –On track to meet parts in house date

Identified Risks & Items from Design Review Safety shutdown for heater –Investigating flow sensor for heater Thermocouple placement to accommodate all possible setups –Adjust length of grooves to accommodate all setups, thermocouples will be under module but not centered Control System functionality –Current design appears feasible, testing will be completed once parts arrive Thermal Expansion –Testing will be performed with force sensors to determine room temperature pressures that equate to steady state pressures Module failures –Force measurements, uniform pressure –Investigate new wire connectors Costs of aluminum piping –Switch to PVC for cold pipe, steel for hot pipe Manufacturing time –Many parts will be in before parts in house date –Build schedule set to complete by end of week 5

MSD II Milestones 3/9/09 Test Plan Finalized 3/19/09 All Parts in House 4/10/09 Assembly Complete 5/1/09 Testing Complete 5/8/09 Documentation Finalized 5/15/09 Final Project Review

Questions?