Welcome JCOMM Observations Coordination Group (OCG) Geneva, 23-25 April 2007 photo courtesy of MeteoFrance.

Slides:



Advertisements
Similar presentations
OceanSITES in the context of a global sustained ocean observing system for climate Albert Fischer and Boram Lee IOC / UNESCO The Global Ocean Observing.
Advertisements

The Way Forward From JCOMM-IV Some Personal Perspectives D.E.Harrison NOAA/PMEL & Univ. Wa. JCOMM-IV Technical Symposium Yeosu, South Korea May 2012.
World Meteorological Organization Working together in weather, climate and water Pilot Project V Integration of marine meteorological and other appropriate.
OOPC and OCG, April 2002 * OOPC Pilot Projects * Other OOPC Initiatives * OceanObs99 St. Raphael * CEOS/IGOS Ocean Theme * Toward a products/system approach.
WMOIOC 1 OOPC-XII, Paris, 2-5 May 2007 DBCP issues for OOPC Boram Lee IOC Secretariat for JCOMM.
Data Buoy Cooperation Panel Hester Viola
» Data buoys measure air pressure, temperature (sea-surface & air), ocean current velocity and wind velocity across all oceans. These observations are.
JCOMM in situ Observing Platform Support Centre JCOMMOPS
Report to the First GODAE OceanView Science Team Meeting Toulouse, 8 June 2009 Jean-Louis FELLOUS and Peter DEXTER Co-Presidents of JCOMM and Albert FISCHER,
Surface Transport Service Delivery Dr Tang Xu Director, WDS WMO WMO; Name of Department (ND)
Data Buoys: a Cornerstone System of the Global Earth Observation System of Systems Mike Johnson Director, NOAA Office of Climate Observation JCOMM Observations.
JCOMM in-situ Observing Programme Support Centre SeaDataNet Technical Meeting II Paphos, Cyprus March 2012 Mathieu Belbeoch & Kelly Stroker.
Observing System Status Report D.E.Harrison Ocean Observations Panel for Climate GODAE ST Washington, DC June 2008.
Voluntary Observing Ships (VOS) WMO Observing Systems Division (OSD)
DBCP-21, Buenos Aires,17-21 October 2005, JCOMMOPS (1) JCOMM in situ Observing Platform Support Centre Most developments now achieved –Infrastructure in.
Slide: 1 27 th CEOS Plenary |Montréal | November 2013 Agenda item: 29 Adrian Simmons, Chair of the GCOS Steering Committee Update from the Global.
JCOMMOPS & Argo, DBCP, SOT, OceanSITES 2 nd GODAE Observing System Evaluation Workshop Toulouse, June 2009 Mathieu Belbeoch & Hester Viola.
A U.S. Sponsored Observing System of the Global Earth Observing System of Systems  Focus on the Network –Data Management –Products Global Seismographic.
JCOMMOPS JCOMM Observing Program Support Centre Etienne Charpentier, WMO Secretariat M. Belbeoch, JCOMMOPS May 2011, MARCDAT-III.
BPO Science Program14 December 2014Webiinar We cannot manage what we do not measure: Martin Kramp - JCOMMOPS Ship Coordinator.
JCOMM in situ Observing Platform Support Centre JCOMMOPS
Integrated Ocean Observing System -- IOOS -- United States Contribution to the Global Ocean Observing System Kurt Schnebele Ocean.US Deputy of Data Management.
JCOMMOPS JCOMM Observing Program Support Centre M. Belbeoch AST#13 Paris, March 2012.
The Data Buoy Cooperation Panel (DBCP) Joint Meeting of the International Program for Antarctic Buoys (IPAB) and the International Arctic Buoy Program.
Joint WMO-IOC Technical Commission for Oceanography and Marine Meteorology Contributions to WIGOS David Meldrum, vice chair, JCOMM OPA.
Surface Marine Metadata Prepared for 1st meeting of WCRP Working Group on Surface Fluxes Halifax, October 2004.
OOPC to WOAP-II D. E. Harrison Ocean Observations Panel for Climate (WCRP, GOOS, GCOS)
Observing System Status- Brief Overview Will post PPts from Mike Johnson and from Eric Lindstrom from the annual review of the NOAA Climate Observations.
JCOMMOPS JCOMM Observing Program Support Centre M. Belbeoch DBCP #27 September 2011 Geneva, Switzerland.
Symposium on multi-hazard early warning systems for integrated disaster risk management A JCOMM perspective Enhanced early warning for better coastal or.
Ship Observations Team NOAA Climate Observations Program 3 rd Annual System Review. 25–27 April 2005, Silver Spring, USA. Graeme Ball Chairman, Ship Observations.
Automated Weather Observations from Ships and Buoys: A Future Resource for Climatologists Shawn R. Smith Center for Ocean-Atmospheric Prediction Studies.
Topics describe the Data Buoy Cooperation Panel (DBCP) –aims, –achievements and –Challenges network status developments of data buoy technology JCOMM.
International Argo structure Argo TC M. Belbeoch Accra, Ghana.
Development and Implementation of the WIGOS Data Quality Monitoring System (WDQMS) Doc. 4.4 ICG-WIGOS Task Team on the Plan for the WIGOS Pre- operational.
I-2.5 Report by the former SOT Technical Coordinator Hester Viola 1 May 2007 – 31 January 2009.
Observing System Monitoring Center (OSMC) Status Update April 2005 Steve Hankin – PMEL (co-PI) Kevin Kern – NDBC (co-PI)
William Westermeyer 15th Meeting of the GCOS-GOOS-WCRP Ocean Observations Panel for Climate 2 April 2011 Comments from the GCOS Secretariat.
ISABP meeting, Rio, August 2004 (1) DBCP DBCP 19 th session –Held in Angra dos Reis, October 2003 –Louis Vermaak presented report on ISABP.
Bob Keeley Marine Environmental Data Service Dept. of Fisheries and Oceans Ottawa, Canada Jun, 2006 SeaDataNet Meeting.
Climate and Cryosphere (CliC): Legacy for 2013 and Beyond Jeff Key NOAA/NESDIS Chair, CliC Observation and Products Panel (Agenda item )
IndOOS—a sustained ocean observing system in the Indian Ocean for climate research Howard Cattle for Gary Meyers Co-Chair CLIVAR/GOOS Indian Ocean Panel.
Data Buoy Cooperation Panel Hester Viola
NOAA’s Office of Climate Observation Presented to the JTA XXIII Angra Dos Reis Rio De Janeiro October , 2003 Sidney W. Thurston, Ph.D. National.
JCOMM Services Program Area Working together beyond GODAE for Operational Oceanography Dr. Craig Donlon JCOMM Service Programme Area Coordinator The Met.
JCOMM Observations Programme Area Report to the DBCP Angra dos Reis, 20 October 2003 Observations Programme Area Coordination Group (OCG) Mike Johnson,
Integrated Ocean Observing System (IOOS) Update
1 GEO Science and Technology Committee, Melbourne, 16 September 2009 Coordinating Implementation of the Global Ocean Observing System Peter Dexter Co-President.
U.S. Integrated Ocean Observing System (IOOS ® ) Z Improve safetyEnhance our economyProtect our environment CIMAR-GOMC meeting – 25 Feb 2015 Zdenka Willis.
JCOMM: Perspectives & Contributions 1 Val Swail - Environment Canada, Toronto 2 Scott Woodruff - NOAA Earth System Research Laboratory, Boulder Elizabeth.
XBT FALL RATE EQUATION WORKSHOP National Oceanic and Atmospheric Administration Atlantic Oceanographic and Meteorological Laboratory, Miami, FL March 10-12,
FY 2005 NOAA Research Budget Request Dr. Richard D. Rosen Assistant Administrator for NOAA Research March 2004.
WE Surface-based GOS for Weather May 2008 Up-date.
Developing G7 ocean initiative Albert Fischer, GOOS, IOC/UNESCO SIT-31 Agenda Item #15 (AOB) CEOS Strategic Implementation Team ESA/ESRIN, Frascati, Italy.
Ocean Climate Observation State of the Program Report to the 7th Annual System Review Silver Spring, MD October 25-27, 2010 David Goodrich Acting Director,
Status of the Global Ocean Observing System – April 2015 David Legler, Director Climate Obs Division NOAA Climate Program Office OOPC – April 2015 Sendai,
Report of the Rapporteur on Marine Observing Systems
Jon Turton (JCOMM OCG Vice-Chair)
Welcome to OceanSITES 11th Steering Committee and 8th Data Management Team Meeting April 2016.
JCOMM in-situ Observations Programme Support Centre www. jcommops
What is JCOMMOPS JCOMMOPS occupies a unique place as the focal point for the practical coordination of the in-situ ocean observing systems defined by JCOMM.
Third International Workshop for Port Meteorological Officers
Candyce Clark JCOMM Observations Programme Area Coordinator
IMPROVING GLOBAL FORECASTS OF WEATHER & OCEAN CONDITIONS
JCOMM in-situ Observations Programme Support Centre www. jcommops
Contributions to WIGOS David Meldrum, vice chair, JCOMM OCG
Coordinating Operational Oceanography and Marine Meteorology
Challenges & opportunities for developping regional cooperation
JCOMM in-situ Observations Programme Support Centre www. jcommops
Support for SOT Activities
Presentation transcript:

Welcome JCOMM Observations Coordination Group (OCG) Geneva, April 2007 photo courtesy of MeteoFrance

JCOMM Observations Programme Area Observations Coordination Group (OCG) Geneva, April 2007 Mike Johnson Observations Programme Area Coordinator photo courtesy of MeteoFrance

2.1 Goals of the Meeting

Each programme brings its unique strengths and limitations. Together they are building a global ocean observing system. OCG-II focus on coordination and cross-cutting solutions to multiple- user requirements. OCG-II Satellite Remote Sensing Requirements Data Assimilation and Modeling Capacity Building DMPA SPA

OCG Terms of Reference Keep under review and advise on the effectiveness, coordination and operation of the observations work programme, including performance measured against scientific requirements, delivery of raw data, measurement standards, logistics and resources;Keep under review and advise on the effectiveness, coordination and operation of the observations work programme, including performance measured against scientific requirements, delivery of raw data, measurement standards, logistics and resources; Provide advice to JCOMM and to Observation Teams on possible solutions for newly identified requirements, consulting as appropriate with relevant scientific groups and CBS;Provide advice to JCOMM and to Observation Teams on possible solutions for newly identified requirements, consulting as appropriate with relevant scientific groups and CBS; Review in situ data requirements and recommend changes as appropriate, taking into account the continuing development of satellite observations and their capabilities;Review in situ data requirements and recommend changes as appropriate, taking into account the continuing development of satellite observations and their capabilities; Coordinate the development of standardized, high quality observing practices and instrumentation and prepare recommendations for JCOMM;Coordinate the development of standardized, high quality observing practices and instrumentation and prepare recommendations for JCOMM; With the concurrence of the co-presidents of JCOMM, establish and create Expert Teams, Task Teams, Pilot Projects and appoint Rapporteurs, as appropriate, to undertake the work of the Observations Programme Area;With the concurrence of the co-presidents of JCOMM, establish and create Expert Teams, Task Teams, Pilot Projects and appoint Rapporteurs, as appropriate, to undertake the work of the Observations Programme Area; Examine trade-offs and use of new and improved techniques/developments against requirements and available resources;Examine trade-offs and use of new and improved techniques/developments against requirements and available resources; Liaise with and input to CBS activities regarding the consolidated requirements database and operational satellites;Liaise with and input to CBS activities regarding the consolidated requirements database and operational satellites; Identify capacity building requirements related to the Programme Area.Identify capacity building requirements related to the Programme Area. Identify satellite remote sensing requirements in the meteorological and ocean domains related to the Programme Area.Identify satellite remote sensing requirements in the meteorological and ocean domains related to the Programme Area.

Observations Programme Area Implement the ocean domain of GCOS-92: JCOMM is identified as the implementing agent for 21 specific actions. The Plan is in place GCOS-92: Initial GOOS GEOSS Ocean Baseline UNFCCC Priority G8 Commitment Tsunami IPY Regional GOOS

Tide gauge stations Surface Drifting Buoys Tropical Moored Buoys Profiling Floats Ships of Opportunity Ocean Reference Stations Ocean Carbon Networks Arctic Observing System Dedicated Ship Support Data & Assimilation Subsystems Management and Product Delivery Satellites -- SST, Surface Topography, Wind, Color, Sea Ice GCOS-92 Implementation Targets are designed for climate but also serve global weather prediction, global and coastal ocean prediction, marine transportation, marine hazards warning, marine environmental monitoring, naval applications, and many other non-climate users. 8 of 9 GEOSS Societal Benefits

57% Total in situ networks January % 100% 42% 81% 43% 66% 48%21% 81% Initial Global Ocean Observing System for Climate Status against the GCOS Implementation Plan and JCOMM targets A total of 5635 platforms are maintained globally.

Tide Gauge Stations Surface Drifting Buoys Tropical Moored Buoys VOS Clim Ships Argo Floats Reference Stations Ocean Carbon Network Ships of Opportunity Multi-year Phased Implementation Plan (International targets presented at JCOMM-II -- representative milestones) Real-time Stations, Initial GCOS Subset High resolution & frequently repeated lines occupied Number of floats Number of moorings Number of buoys Repeat Sections Completed, One inventory per 10 years System % Complete Observatories, flux, and ocean transport stations Number of ships recruited Total System JCOMM-I JCOMM-II Initial Ocean Observing System Milestones 57

Goals of the Meeting -- OCG-II Meeting focus on system-wide requirements and coordinated, system-wide solutions.Meeting focus on system-wide requirements and coordinated, system-wide solutions. Status of JCOMM component programmes: DBCP (inc TIP), SOT, GLOSS, and the JCOMM affiliated programmes Argo, OceanSITES, IOOCP.Status of JCOMM component programmes: DBCP (inc TIP), SOT, GLOSS, and the JCOMM affiliated programmes Argo, OceanSITES, IOOCP. User requirementsUser requirements –GOOS/GOOS implementation from OOPC –NWP –Services PA – Global operational oceanography

JCOMM and the Tsunami systemsJCOMM and the Tsunami systems IPY – Legacy observing networks in Antarctic and ArcticIPY – Legacy observing networks in Antarctic and Arctic JCOMMOPS and expanded JCOMMOPS-CJCOMMOPS and expanded JCOMMOPS-C Work plan and other action items for the OCGWork plan and other action items for the OCG –Review of JCOMMOPS for JCOMM-III –Draft OPA implementation plan Resources to meet implementation targetsResources to meet implementation targets Goals of the Meeting (Continued)

Cross-cutting issuesCross-cutting issues –Data dissemination, management and QC –Standards and best practices references –Capacity building –WMO Information System (WIS) –WMO Integrated Global Observing System (WIGOS) –Satellite data requirements and satellite systems –Satellite telecommunications –Relationship of JCOMM to GOOS Regional Alliances Goals of the Meeting (Continued)

Progress and Challenges

Systems Approach to Standard Mapping and Reporting Standard Baser Map: Equidistant Cylindrical Projection, 90N to 90S, broken at 30 E OCG-IOCG-II

Surface Drifting Buoys 1250 sustained array (achieved) Issues: Global deployment strategy with Argo, SOT, IOCCP,OceanSITES. Iridium pilot project. Users workshop: Implement hourly reporting Need barometers on all drifters (presently 407)

TAO/TRITON sustained PIRATA Extensions implemented Indian Ocean Array getting started Tropical Moored Buoys Issues: Tropical Ocean Reference Stations with OceanSITES Deployment coordination with Tsunameters stations. Platforms for IOCCP.

2851 active floats -- will reach 3000 by mid-2007 Argo Profiling Float Array Issues: Global deployment strategy with DBCP SOT, IOCCP,OceanSITES. Iridium pilot project. Cal/val with IOCCP and SOT/SOOP.

GCOS Climate Reference Network of Tide Gauge Stations Issues: Real-time reporting for Marine Hazards warning (tsunami). Implement standard CREX with DMP. GEO-located

Deploying and maintaining 89 Ocean Reference Stations (42 now in service) Issues: Ocean Reference Stations on GTS Withhold from assimilation schemes Real-time observing system monitoring Broad use of real time data OceanSITES -- DBCP Action Group or JCOMM affiliated implementation panel Iridium pilot project with DBCP Deployment coordination with tsunameter Stations. Platforms for IOCCP.

Sites where Tsunami and Climate plans overlap -- potential for coordination Sites where Climate missions already deploy tsunami buoys routinely Integrating tsunami buoys into GOOS (JCOMM DBCP and OceanSITES) Chilean Tsunami Buoy being deployed during a U.S. Climate mission Met sensors installed by USA on the Chilean tsunami buoy: October 2006 Issue: DBCP to invite the Intergovernmental Tsunameter Coordination Group to become an Action Group

AX07 AX03 AX20 AX22 IX01 IX12 IX22 IX28 PX05 PX08 PX09 PX10 PX13 PX17 PX18 PX30 PX31 PX34 PX37 PX38 PX40 PX50 AX08 AX18 AX25 AX29 AX34 IX06 IX08 IX15 PX02 PX04 PX11 IX21 PX21 PX36 PX81 AX15 AX10 AX11 IX07 IX09S PX44 PX06 IX10 Note : AX08 is Under sampled in FRX Mode 41 of 51 UOT XBT lines now occupied 910 VOS reporting at least 25 obs/month Issues: SOT fleet is the backbone for deployment of the drifting arrays. Platforms for IOCCP.

38% complete Measuring Ocean Carbon Sources and Sinks 1. Inventory 10-year survey 2. Ships of opportunity Network design underway 3. Moored buoy time series Issues: Cal/Val for Argo. DBCP,SOT, OceanSITES -- platforms for IOCCP. Sub-Argo ocean measurement system.

IPY -- legacy (sustained) networks Issues: DBCP, SOT, GLOSS, OceanSITES, Argo, IOCCP.

The Future Observing Programme Support Center 5635 Platforms 68 Counties v This system will not operate itself. System = programme coordination + full-time technical coordination

2.2 Component Reports and Issues

4.1 Integrated Performance Metrics

JCOMMOPS Product Delivery

Ship observations not shown Percent of 5x5 Boxes with 25 Observations per Week Drifting Buoys Moored Buoys Ships Total Goal: 100% Global Coverage Requirement: All boxes blue Drifting Buoys + Moored Buoys + Weighted Ship Observations Requirement: 0.2°C - 0.5°C accuracy; 500km horizontal resolution; 25 samples per week (GOOS/GCOS, 1999) Performance Measure: Reduce the error in global measurement of Sea Surface Temperature Metric: Potential satellite bias error (degrees Celsius) Observing System Status: 2006, Q4. Error in Global Measurement of Sea Surface Temperature

BATHY (mostly XBTs) TESAC (mostly Argo floats) TRACKOB (surface underway data) BUOY (moored and drifting) Observing System Status: 2006, Q4 Temperature Profiles Goal: 100% Global Coverage Requirement: All boxes blue Sampling requirements: 1 profile Every 10 days In every 3 x 3 º

BATHY (mostly XBTs) TESAC (mostly Argo floats) TRACKOB (surface underway data) BUOY (moored and drifting) Observing System Status: 2006, Q4 Salinity Profiles Goal: 100% Global Coverage Requirement: All boxes blue Sampling requirements: 1 profile Every 10 days In every 3 x 3 º

BATHY (mostly XBTs) TESAC (mostly Argo floats) TRACKOB (surface underway data) BUOY (moored and drifting) Observing System Status: 2006, Q4 Sea Surface Salinity Goal: 100% Global Coverage Requirement: All boxes blue Sampling requirements: 1 observation Every 10 days In every 2 x 2 º

Sort by: Platform type Variables being sampled Time frame Contributing Country Drill down for platform metadata and real-time data. Observing System Monitoring Center Near-real-time tool for system statistics and data (Data from GTS. Some web sources by May 2007)

Designed especially for reporting contributions by Countries. Example: Australia had 141 Platforms reporting during the past month

Issue (possible future capability): SPA graphic entry point for met-ocean services. Graphic entry point for port met offices and National contacts. Issue (possible future capability): SPA graphic entry point for met-ocean services. Graphic entry point for port met offices and National contacts. Services

Test Version 2.00 beta: Test Version 2.00 beta: By May 1: OceanSITES from spread sheet. - Need GTS for real-time display. Tide gauges from UHSLC real-time system. Rubber banding for regional display. By May 1: OceanSITES from spread sheet. - Need GTS for real-time display. Tide gauges from UHSLC real-time system. Rubber banding for regional display.

4.8 Crosscutting Issues

OceanSITES -- DBCP Action Group and/or JCOMM affiliated implementation panelOceanSITES -- DBCP Action Group and/or JCOMM affiliated implementation panel DBCP invite the International Tsunameter Coordination Group to become an Action Group.DBCP invite the International Tsunameter Coordination Group to become an Action Group. OceanSITES real-time data on the GTS:OceanSITES real-time data on the GTS: –Issues: 1) withholding validation data from assimilation schemes; 2) broad use of real-time data; 3) observing system monitoring, e.g., OSMC –Options: 1) data flag; 2) bulletin header: 3) list of WMO IDs provided to users JCOMM as partner in GOOS Regional Alliances; e.g., Arctic GOOSJCOMM as partner in GOOS Regional Alliances; e.g., Arctic GOOS GLOSS needs:GLOSS needs: –A system monitoring activity. –Regional traveling technician support (beyond the Australia and UHSLC programs). Argo needs:Argo needs: –Sustained funding –Ship deployment opportunities –Coordination of hydrography programs 4.8 Crosscutting Issues

OceanSITES needs: –Reliability, calibration, inter-calibration of sensors. –Sensor-to-sensor-to-DCP communication protocols. –Satellite communications telemetry -- JTA including Argos and others? –Data from all systems, availability through a single service portal. –Sustained support. –Should JCOMM send representatives at science meetings? IOCCP needs:IOCCP needs: –Single data information portal. –Tracking/coordinating repeat non-carbon hydrography obs (e.g. Tropical Moored Buoy deployments). –Observation support center. OOPC needs:OOPC needs: –Continued pressure to meet implementation targets. –Observing system support center. –Surface salinity pilot project. 4.8 Crosscutting Issues (Continued)

5. JCOMMOPS

- Looking to the Future - JCOMM Observing Platform Support Center (JCOMMOPS) (presently supporting DBCP, SOT, Argo) Roundtable, May 2006: representatives from the OCG, DBCP,SOT, GLOSS, Argo, OceanSITES, IOCCP, POGORoundtable, May 2006: representatives from the OCG, DBCP,SOT, GLOSS, Argo, OceanSITES, IOCCP, POGO –Agreed value and mutual benefit in evolving toward a Global Observing Program Support Center. –Estimate seven personnel needed versus the present two working at JCOMMOPS. –Shared benefit, shared responsibility: the Systems benefiting should pay in proportion to their demand for JCOMMOPS services. –Consider possible relocation of JCOMMOPS to a national center that might be interested in hosting an international center, and furnish in-kind contributions and additional support.  JCOMM Management Committee (07 October, Geneva): OCG will develop requirements/specifications for future JCOMMOPS evolution and call for proposals -- April Platforms 68 Counties v

Focus on the technical requirements.Focus on the technical requirements. Provide enough management information for institutions to make an informed decision to propose, but don’t try to specify all details.Provide enough management information for institutions to make an informed decision to propose, but don’t try to specify all details. –Management will be a subject of negotiation after proposals are received –JCOMMOPS is a special case dependent upon concurrence by WMOWMO IOCIOC JCOMM ManagementJCOMM Management DBCP and SOT donorsDBCP and SOT donors Argo donorsArgo donors IOCCP and other potential program donorsIOCCP and other potential program donors 5.0 Discussion Paper

6.2 Strategic and Implementation Plan

Observations Programme Area Implement the ocean domain of GCOS-92: JCOMM is identified as the implementing agent for 21 specific actions. The Plan is in place GCOS-92: International GOOS GEOSS Ocean Baseline UNFCCC Priority G8 Commitment

57% Total in situ networks January % 100% 42% 81% 43% 66% 48%21% 81% Initial Global Ocean Observing System for Climate Status against the GCOS Implementation Plan and JCOMM targets A total of 5635 platforms are maintained globally.

Tide Gauge Stations Surface Drifting Buoys Tropical Moored Buoys VOS Clim Ships Argo Floats Reference Stations Ocean Carbon Network Ships of Opportunity Multi-year Phased Implementation Plan (International targets presented at JCOMM-II -- representative milestones) Real-time Stations, Initial GCOS Subset High resolution & frequently repeated lines occupied Number of floats Number of moorings Number of buoys Repeat Sections Completed, One inventory per 10 years System % Complete Observatories, flux, and ocean transport stations Number of ships recruited Total System JCOMM-I JCOMM-II Initial Ocean Observing System Milestones 57

Thank You photo courtesy of MeteoFrance