PHASE 2 CONSTRUCTION PHASE I DESIGN SERVICES ISSUE DESIGN-BUILD CONTRACTS DIFFERENCES: SUBCONTRACTOR LISTING (POST AWARD) VALUE ENGINEERING (CHANGE ORDER.

Slides:



Advertisements
Similar presentations
Fullerton College Bond Fund Projects Update Fullerton College Athletics Project Scope Overview Schedule Parking.
Advertisements

Lessons Learned: CM at Risk & Design Build
PRESENTATION January 8, 2004 ORANGE BOWL STADIUM.
Airport Owner’s Guide to Project Delivery Systems Prepared by: The Joint Committee of ACI-NA, ACC and AGC.
4 th ANNUAL JOINT CSU/UC PSSOA CONFERENCE March 25-26, 2003 “Emerging Construction Methodologies in CSU – What Public Works Contract Specialists Should.
Your Deliver Method... …Pick it Early
Health Tech Corridor TOD December 6, The Health Tech Corridor- Before.
San Juan College Purchasing Department Director of Purchasing / CPO Frank Cole.
Facilities & Capital Construction Program Overview Program Overview Project & Scope Schedule Alternative & Traditional Procedure Approaches E-Builder.
CSM Buildings Modernization DESIGN-BUILD QUALIFICATION CONFERENCE November 12, 2008.
CTC-470 Construction Administration Project Management Concepts.
COUNCIL WORKSESSION DECEMBER 11, AGENDA a.PROJECT SUMMARY RECAP. a.SCOPE. b.BUDGET. b.FINANCING UPDATE. a..5% GENERAL SALES & USE TAX. b.1.5% LODGING,
Facilities Institute July , 2012 Houston, Texas Click to edit Master title style
Delivery of Multiple Small Projects—Now! Task Order Construction Agreements.
CSN Project # EHSB Addition - Scope of Work 10,000 SF addition to K Building on West Charleston Campus to house the Cardiorespiratory Program.
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
“BRIDGING” DESIGN-BUILD Residential Suites/Residential Dining Complex 694 Beds in 8 Student Suites / 2-6 Story Buildings 732-Seat Dining in 2-Story Building.
Delivery Methods  The Players from Handbook of Architectural Practice, Chapter 9.1 by Phillip Bernstein FAIA  Variables from Handbook of Architectural.
I.Program Update The following summarizes major activities completed or in progress as of June 30 th, II.Program Budget Summary (Attachment A) The.
CAMPUS GROWTH AND DEVELOPMENT AT WESTERN MICHIGAN UNIVERSITY Campus Planning April 2007
PIONEER HIGH SCHOOL WEST STADIUM PHASE 1. EXECUTIVE SUMMARY Erickson Hall (EHCC) was the awarded the Pioneer High School Phase 1 Construction Contract.
Prof Awad S. Hanna C HANGING P ROJECT D ELIVERY S YSTEMS by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison Department of Civil and Environmental.
Fullerton College Physical Education Project Community Meeting March 11, 2009.
CVE 1000 Construction Engineering The Project Delivery System Prof. Ralph V. Locurcio, PE.
2005 AASHTO Value Engineering Conference Using VE in Design Build Presented by: Jerry R. Blanding Innovative Contracting Engineer FHWA – NRC July 21, 2005.
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
PM/CAM Training H. Jeff Moore May 11, AGENDA Overview CM at Risk Design (Completion) / Build Lunch Break / Discussion – 11:30 AM – 12:30 PM CM Agency.
Procurement and Construction Management and Oversight What Board Members Need to Know Jerry Smiley, AICP 24 July 2013.
Design–Build Contracts G. Hardy Acree Director of Airports Sacramento County Airport System Advantages of of During Turbulent Times.
Western Carolina University Town Hall Meeting May 6, 2003 Chuck Wooten Vice Chancellor for Administration and Finance.
January 24, …a delivery method which entails a commitment by the Construction Manager to deliver the project within a Guaranteed Maximum Price (GMP).
Paradise Valley Community College CLC Update Jacalyn A Askin, Vice President of Administrative Services May 8, 2009.
Construction Report November 17, Projects Site Improvements –In close out Track replacement and turf –Last phase (track) Generators –In close.
January 31, …a delivery method in which the construction team is known as the design-builder…and is responsible for taking a concept developed by.
The Owner’s Perspective
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
DESIGN-BUILD INSTITUTE OF AMERICA - Western Pacific Region Thursday, February 9, :30 am – 1:30 pm.
Palomar West Medical Center Segmental Review Brett W. Beekman, S.E. Senior Structural Engineer, Southern California.
Project Delivery Methods Part I. What is A Project Delivery Method? The owner’s selection of the organizational structure of the project. Three popular.
FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING SPRING SEMESTER ASSOC.PROF.DR. İBRAHİM YİTMEN CIVL 493 CONSTRUCTION MANAGEMENT.
UTILIZING CONSTRUCTION MANAGER AT RISK IN GREENSBORO, NORTH CAROLINA.
LACCD Building the Future THOMAS HALL Director Facilities Planning and Development.
DESIGN-BUILD Design Perspective DESIGN MANAGER RESPONSIBILITES/ATTRIBUTES Manage the Design Single Point of Communication Adaptable to changes.
The Design/Build Contract. What Is A Design/Build Contract? Contract that combines design & construction into one agreement The design/build team provides.
Construction Management At Risk Process
Construction Manager/General Contractor Pilot Program Construction Management Association of America February 18, 2016 California Department of Transportation.
STEVE OGLESBEE, DREW WALKER, ALAN WONG SAN FRANCISCO WAR MEMORIAL.
South Greenville Recreation Center and Park Master Plan.
CONSTRUCTION MANAGEMENT AT RISK Prepared by: Nancy Fouad Carey Attorney AGC Alabama Birmingham Section Meeting November 5, 2012.
Avondale City Center & American Sports Centers Amendment No. 2 Sports Facility Construction City Council January 4, 2010.
Definitions Design-Bid-Build – Traditional Method of construction – To deliver a project in which the owner contracts with separate entities for the design.
STEVE OGLESBEE, DREW WALKER, ALAN WONG SAN FRANCISCO WAR MEMORIAL.
Cyber Security Studies Building 4/1/20161 Groundbreaking - Oct 21, 2016.
Building for the Future of Education: Propositions S and N
by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison
Lane Center for Academic Health Sciences – Now Open
Kell Hall Relocation Concept Plan
Read Building Relocation Plan
CHANGING PROJECT DELIVERY SYSTEMS
BURROUGHS HIGH SCHOOL PROJECT STATUS REPORT March 2017 Fast Facts
Designers’ Manual Overview and Chapter Contents
Construction 101 Start to Finish
Proposal Writing Tips Ivan Page L.A.C.M.T.A.
UNC Charlotte INTERCOLLEGIATE SWIM TEAM PROJECT
CF Organization & Schedule
Five Year Construction Plan
Design-Bid-Build (Ch. 149) vs. Construction Manager at Risk (Ch. 149A)
PROJECT DELIVERY METHODS
CONVENTIONAL FACILITIES LCLS Office Space Procurement
How to Solve the Housing Shortage
Presentation transcript:

PHASE 2 CONSTRUCTION PHASE I DESIGN SERVICES ISSUE DESIGN-BUILD CONTRACTS DIFFERENCES: SUBCONTRACTOR LISTING (POST AWARD) VALUE ENGINEERING (CHANGE ORDER #1) MULTI-PHASE CONTRACT PLAN APPROVAL OCCURS (POST AWARD) ELIMINATES CHANGE ORDERS FOR ERRORS & OMISSIONS LEGAL

SOME RECENT EXAMPLES at San Diego State University

TRADITIONAL DESIGN-BID-BUILD Grade: D Science Lab Building Cost: $36 Million Size: 106,000 Square Feet Completion Date: June 2001 Issues: Change Orders = 8% 2 Years Late Claims High Lawsuits & Settlement w/Sub-Contractors

TRADITIONAL DESIGN-BID-BUILD C/G RENOVATION GRADE: A Completed: 6/03 Cost: $19.2 M Issues: Under Budget Change Orders 5% Scheduling Multiple Contracts

Ninety 1- & 2-BR Apartments Completed: 1986 Cost: $5.3 Million Grade: C- Issues: Low Quality Control Too Many Options Villa Alvarado Apartments “PURE” DESIGN-BUILD

2,100 Parking Spaces on 8 Stories Completed: 1994 Cost: $12 M Parking Structure 4 Grade: B+ Issues: Foundation Claims

“PURE” DESIGN-BUILD Parking Structure 5 / Aztrack 1,460 Parking Spaces -- 2 Stories Sports Deck - Soccer and Track & Field Completion: 2000 Cost: $19.5 M Grade: A Issues: Owner Project Management Team

RISK w/GMP East Commons Renovation Grade: A Issues: Scheduling/Operations

CM/GC Original Gateway Building Grade: B- 150,000 SF Mixed Use Office Completed: 1990 Cost: $16.5 M Issues: Quality Sacrificed

CM/GC Tony Gwynn Baseball Stadium Completed: 1998 Cost: $5.5 M Grade: A Issues: None

CM/GC Grade: B 127,000 SF Completed: 2001 Cost: $20.5 M Aztec Athletics Center Issues: Changing Program GMP Not Achieved/Redesign

Cogeneration Facility 14 Megawatt Generation 25,000 Lbs/Hour High Pressure Steam Completed: 12/02 Cost: $17.5 M “PERFORMANCE” DESIGN-BUILD Grade: A Issues: Complicated Criteria for Evaluation & Performance