PHOS data taking status - lessons learned/implications for EMCAL Outline Recent work in PHOS CERN, May and June 2007 (PHOS & EMCAL team; Josh, Lamia,

Slides:



Advertisements
Similar presentations
1 ALICE EMCal Electronics Outline: PHOS Electronics review Design Specifications –Why PHOS readout is suitable –Necessary differences from PHOS Shaping.
Advertisements

2 Introduction   MiniCal test-beam studies started at the beginning of March (till March 6 we only had 17 APD’s, then 33 APD’s)   A few days were.
CALICE WHCAL testbeam at SPS H8 27 sep – 03 oct: 6 days for energies up to 180 GeV (+ polarity)
Peter Chochula, January 31, 2006  Motivation for this meeting: Get together experts from different fields See what do we know See what is missing See.
Using the EUDET pixel telescope for resolution studies on silicon strip sensors with fine pitch Thomas Bergauer for the SiLC R&D collaboration 21. May.
Checking the Acd hardware veto setting The hardware veto is generated in the front-end electronics Discriminator with coarse and fine settings Both are.
20 Feb 2002Readout electronics1 Status of the readout design Paul Dauncey Imperial College Outline: Basic concept Features of proposal VFE interface issues.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
Jianchun (JC) Wang, 08/21/99 RICH Electronics and DAQ Chip Carrier Short Cable Transition Board Long Cable Data Board Crate J.C.Wang Syracuse University.
An offline look at TIF data David Stuart UC Santa Barbara May 2, 2007.
CFT Calibration Calibration Workshop Calibration Requirements Calibration Scheme Online Calibration databases.
ECAL electronics Guido Haefeli, Lausanne PEBS meeting 10.Jan
1 TPC online  offline calibration November 2002.
Tests with JT0623 & JT0947 at Indiana University Nagoya PMT database test results for JT0623 at 3220V: This tube has somewhat higher than usual gain. 5×10.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
14/02/2007 Paolo Walter Cattaneo 1 1.Trigger analysis 2.Muon rate 3.Q distribution 4.Baseline 5.Pulse shape 6.Z measurement 7.Att measurement OUTLINE.
C. Seez Imperial College November 28th, 2002 ECAL testbeam Workshop 1 Pulse Reconstruction Worth considering the experience of other experiments using.
STAR Analysis Meeting, BNL, Dec 2004 Alexandre A. P. Suaide University of Sao Paulo Slide 1 BEMC software and calibration L3 display 200 GeV February.
Real data reconstruction A. De Caro (University and INFN of Salerno) CERN Building 29, December 9th, 2009ALICE TOF General meeting.
1 xCAL monitoring Yu. Guz, IHEP, Protvino I.Machikhiliyan, ITEP, Moscow.
Clara Gaspar, March 2005 LHCb Online & the Conditions DB.
July 19, 2006VLCW-06 Vancouver1 Scint/MAPMT Muon Prototype Operation Robert Abrams Indiana University.
STAR Collaboration Meeting, BNL, Feb 2005 Alexandre A. P. Suaide University of Sao Paulo Slide 1 BEMC software update L3 display 200 GeV February.
Calibration of the CMS Electromagnetic Calorimeter with first LHC data
Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
News on GEM Readout with the SRS, DATE & AMORE
1 SDD: DA and preprocessor Francesco Prino INFN Sezione di Torino ALICE offline week – April 11th 2008.
EMCAL : Online Software Status 1) General info/intro 2) DCS-related: detector configuration, Data Points 3) DAQ: Detector Algorithms 4) QA, AMORE 5) Offline-related:
1 A first look at the KEK tracker data with G4MICE Malcolm Ellis 2 nd December 2005.
Online System Status LHCb Week Beat Jost / Cern 9 June 2015.
1 EMC Trigger Summery from RunII and discussion for RunIII H.Torii, Kyoto Univ. ERT Lvl-1 meeting.
TPC QA + experience with the AMORE framework Marian Ivanov, Peter Christiansen + GSI group.
first results from EMCal test beam
STAR J/  Trigger in dA Manuel Calderon for the Heavy-Flavor Group Trigger Workshop at BNL October 21, 2002.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
(s)T3B Update – Calibration and Temperature Corrections AHCAL meeting– December 13 th 2011 – Hamburg Christian Soldner Max-Planck-Institute for Physics.
STAR Collaboration Meeting, BNL – march 2003 Alexandre A. P. Suaide Wayne State University Slide 1 EMC Update Update on EMC –Hardware installed and current.
STAR Analysis Meeting, BNL – oct 2002 Alexandre A. P. Suaide Wayne State University Slide 1 EMC update Status of EMC analysis –Calibration –Transverse.
Nantes — 2008, July Analysis of results from EmCal beam test at CERN PS (and SPS) energies P. La Rocca & F. Riggi University & INFN Catania University.
Yu. Guz 21/04/20061 Database usage by calorimeters Yu. Guz IHEP Protvino.
Laboratoire de l’Accélérateur Linéaire, Orsay, France and CERN Olivier Callot 18 March 2003 Online Data Format and Condition Database Proposed data format.
Summary of User Requirements for Calibration and Alignment Database Magali Gruwé CERN PH/AIP ALICE Offline Week Alignment and Calibration Workshop February.
Overview of PHENIX Muon Tracker Data Analysis PHENIX Muon Tracker Muon Tracker Software Muon Tracker Database Muon Event Display Performance Muon Reconstruction.
1 EMCAL Reconstruction in Pass pp 900 GeV 29/03/2010 Gustavo Conesa Balbastre.
PHOS offline status report Yuri Kharlov ALICE offline week 7 July 2008.
EMCAL Calibration & Assembly at Yale University Mark Heinz, Project Mgr EMCAL Meeting Nantes July 15, 2008.
G. Eigen, Paris, Introduction The SiPM response is non-linear and depends on operating voltage (V-V bd ) and temperature  SiPMs need monitoring.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
S.MonteilPS COMMISSIONING1 MaPMT-VFE-FE ELECTRONICS COMMISSIONING AND MONITORING. OUTLINE 1)Ma-PMT TEST BENCHES MEASUREMENTS 2)VFE AND FE ELECTRONICS FEATURES.
Summary of TPC/TRD/DCS/ECS/DAQ meeting on FERO configuration CERN,January 31 st 2006 Peter Chochula.
Calibration algorithm and detector monitoring - TPC Marian Ivanov.
D. Silvermyr, ORNL1 Test Beam - Outline FNAL/Test Beam I (Nov 2005) Results overview from Test Beam I Test Beam II – SPS and PS (Sep – Oct 2007) Current.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
Calorimeter Cosmics Patrick Robbe, LAL Orsay & CERN, 20 Feb 2008 Olivier, Stephane, Regis, Herve, Anatoly, Stephane, Valentin, Eric, Patrick.
L1Calo Databases ● Overview ● Trigger Configuration DB ● L1Calo OKS Database ● L1Calo COOL Database ● ACE Murrough Landon 16 June 2008.
Feb C.Smith UVA EC energy calibration – g13 pass0 For pass0 data were cooked with CALDB calibration constants reset to nominal 10 channels / MeV.
Rainer Stamen, Norman Gee
Calorimeter Status Electronics Installation and Commissioning
EMCal Cosmics Run Cosmics Run Goals
CMS Preshower: Startup procedures: Reconstruction & calibration
Remaining Online SW Tasks
Design of Digital Filter Bank and General Purpose Digital Shaper
Pulse Shape Fitting Beam Test September, October CERN
CERN SPS and PS Tests 2007 Goals: Show we have a working EMCal system
BESIII EMC electronics
Commissioning of the ALICE-PHOS trigger
Testbeam analysis on module #1
Presentation transcript:

PHOS data taking status - lessons learned/implications for EMCAL Outline Recent work in PHOS CERN, May and June 2007 (PHOS & EMCAL team; Josh, Lamia, Sasha V, Hans, DS et al) LED/Pulser data; calibrations & dead channels Cosmics data; track candidates Misc. points: signal fitting, zero suppression, configuration database

1 Module PHOS 112 FEE Cards 8 TRU 4 RCU 3584 input channels 7168 readout channels 10 bit C.f. : one EMCAL SM has 24*12*4 = 1152 towers, and thus 2304 readout channels.

PHOS aujourd’hui Will soon be closed up, rotated, and cooled down.. Cosmics taken to date have been at room temperature, and with the crystals oriented in the horizontal direction.

Online / PHOS lab Have recently switched to DATE6 (latest and greatest) + installing of TRUs, busybox etc. Nice setup with help from DAQ crew – using DAQ logbook, writing data directly into ROOT format etc.

DeadMap Channels from LED run 7261 [Lamia; earlier hardware fixes by Sasha V.] 42 Dead Channels ~ 1 % [high gain only] Some flakiness observed; Intermittent problem channels come and go. - Frequency should be evaluated. [Lamia et al have taken many LED runs to study this]

Relative Calibration With a constant LED pulse signal, we do scans of the average signal amplitude vs APD bias HV setting. The HV setting is done via DAC register on the Front-End cards. We fit the gain curve of amplitude vs HV, or DAC value, for each channel. Similar studies were done for the EMCAL testbeam at FNAL.

- We can do a first/rough gain balancing between different towers (assuming LED signals do not vary too much tower-by-tower) by selecting a reference amplitude and dial in the corresponding DAC values for each channel. [Software by Josh.] Before After

Cosmic Track: Tmp. dead FEE card

Cosmic Track (lego)

Another Cosmic Event Standard fit (gammaN) to the ADC values vs time. Fit parameters are Pedestal, Amplitude, Tau, and Tmax.

Misc. points for EMCAL:

Sensitivity of tau value to fit parameters Since the shape changes in the tail, we wanted to see if the tau value changed as a function of where we stop the fit. The cut we use, is to stop when the ADC value has reached a certain fraction f of the maximum ADC. [I.e. a fraction cut value of 0.6 means that we stop at 60% of the peak height.] We then noticed that the obtained tau values varied quite a lot depending on where exactly this cut was made, when we used the default order of the gamma function, gammaN = 2. If the function we fit with had the correct shape, one would not expect a large variation as a function of where we stop the fitting.. A plot of the cut dependence for the average extracted tau value, for different gammaN settings, is next.

True shape seems to be more like gammaN ~= 1.8. Will need to test for EMCAL shaper later..

Cosmic Runs & Calibration: Cosmics with properly oriented and cooled-down PHOS in a few weeks should be more interesting. We should be able to see MIPs/same energy peak over the whole module. Purpose of calibration is to set all channels to the same relative gain. With pulser runs this is limited by variation of LED light for different towers. *We probably want the LEDs and FEEs to travel along with the SMs for the cosmic etc tests and calibrations before the installation.. *With cosmics and testbeam, one also wants the LED that will be used in data taking so that one can establish the relation between LED peak, and the energy scale in GeV. *For the testbeam in the fall we should probably try to take some cosmics also to check the agreement between a cosmic balancing and balancing with beam. Should also make sure that the files can be processed offline with AliRoot etc. With physics data, later on, one has access to the following means: MIPs (good statistics), pi0’s (2 gamma) and electrons (E/p requirement).

Missing 1 out of 64 channels.. Still missing first low gain channel 0, chip 2 on every FEC.. Will try the trick from ZhongBao (activate non- existing chip 1) to see if this can be cured..

Zero suppression registers Several possibilities and options for ALTRO zero suppression. We have mainly used the automatic/variable zero-suppression mode. [Thanks to R. Bramm (TPC) for advice.]

Zero Suppression problem Some problems so far on zero suppression front..: 1) We have a small error frequency (~ %, depends on thr etc), where the channel trailer info and the number of data samples does not seem to match. A feature(?) when using ROOT raw data format is that these errors are not seen then – just a caution that the underlying problem is probably still there though.. 2) We don’t use the ZS mode we should be using, with a fixed pedestal that doesn’t change automatically – should perhaps not be too hard to change that.

Check: Matching of automated (VFPED) and fitted pedestal (signal run) All channels, Low gain and High gain.

Online monitoring Plan: New data-quality-framework for online monitoring from DAQ group (Filimon) called AMORE is expected to have first release in July. Summer student from Jyvaskyla (Timo) is at CERN for two months, and I have suggested that we could turn EMCAL and PHOS unofficial testbeam/online analysis tools into something more official and acceptable..

DCS: DB Configuration Info FEE Configuration a la baseline settings, zero suppression registers, thresholds etc. not yet fully implemented for PHOS, so database development for that is somewhat premature at the moment. APD configurations (HV bias settings) however do exist (few hundred different ones), and provide a good (relatively simple) test case for DB infrastructure etc. I think I can handle the DB end for EMCAL, but we probably need someone (Creighton?) to help/handle the step between PVSS and DCS; FED and feeServers. May be already part of the plan, otherwise - volunteeers would be most welcomed.

Summary Currently an active time for PHOS commissioning/tests (installation in about 5 weeks). EMCAL folks are participating/helping out. A lot of similarities between PHOS and EMCAL, especially on electronics side; many things of common interest and benefit. We have a good opportunity to work together, and learn what to do, or not to do, for EMCAL. I hope to have a more clear idea of what should be done on online fronts (monitoring, calibration, online detector algorithms etc) by this fall. Testbeam + collected data there should be an important exercise. Terry (+ DS) will be at CERN from Sep 2007 to Sep 2008.