E166 Collaboration J.C. Sheppard SLAC, October, 2003 E166 Background Test Simulations: Overview-what do we need J. C. Sheppard.

Slides:



Advertisements
Similar presentations
POLARIMETRY of MeV Photons and Positrons Overview Beam Characterization – undulator photons – positrons Basics of the Transmission Method – for photon.
Advertisements

Ideas and Speculations for the Headon Extraction Line L. Keller Oct. 19, Give up the 3.5 m Separation between the Charged Dump and the Incoming.
Joanne Beebe-Wang 7/27/11 1 SR in eRHIC IR Synchrotron Radiation in eRHIC IR and Detector Background Joanne Beebe-Wang Brookhaven National Laboratory 10/
Pair Spectrometer Design Optimization Pair Spectrometer Design Optimization A. Somov, Jefferson Lab GlueX Collaboration Meeting September
Undulator-Based Positron Production in the Final Focus Test Beam (E-166) The International Polarized Positron Production Collaboration K.T. McDonald, J.C.
JCS e + /e - Source Development and E166 J. C. Sheppard, SLAC June 15, 2005.
Positron Asymmetry and Polarization from the E166 September 2005 run Gideon Alexander, Erez Reinherz-Aronis.
K.T. McDonald DoE Review Aug. 10, E-166 Experiment E-166 is a demonstration of undulator-based polarized positron production for linear colliders.
EPAC June 2003 The EPAC June 2003 Questions 1. Clarify the Motivation for the Proposal. 2. How to ensure the e+ polarimeter works right away? 3. What is.
5 th Rencontres du Vietnam - Aug. 7, 2004 Polarized Positrons…E166 A.W.Weidemann 1 Introduction (What, who) Motivation (Why) Experiment and Polarimetry.
Stanford – Mar , 2005 LCWS-2005 Norbert Meyners Upstream Polarimetry with 4-Magnet Chicane 1 Introduction & Overview O Compton polarimetry basics.
E166 “Polarized Positrons for Future Linear Colliders” John C. Sheppard E166 Co-spokesman SLAC: August 31, 2004.
K.T. McDonald DoE Review July 29, E-166 Experiment E-166 is a demonstration of undulator-based polarized positron production for linear colliders.
Undulator-Based Production of Polarized Positrons Status Report on E-166 Undulator-Based Production of Polarized Positrons K.T. McDonald Princeton University.
E166 Collaboration About 45+2 members from 16+1 institutions from all three regions (Asia, Europe, the Americas, and Daresbury) About 45+2 members from.
NLC - The Next Linear Collider Project NLC IR Layout and Background Estimates Jeff Gronberg/LLNL For the Beam Delivery Group LCWS - October 25, 2000.
IPPC June 2003 E-166 Background Studied 3-slides.
Status of the HELICAL contribution to the polarised positron source for the International Linear Collider The positron source for the International Linear.
E166 Collaboration J.C. Sheppard SLAC, October, 2003 E166 Background Test Magnets/Beamline Equipment/ Instrumentation J. C. Sheppard.
Left: The polarization of the undulator radiation as a function of energy. Right: Calculated positron longitudinal polarization as a function of energy.
F.Brinker, DESY, July 17 st 2008 Injection to Doris and Petra Fitting the detector in the IP-region Radiation issues Beam optic, Target cell Polarisation.
NLC - The Next Linear Collider Project Sheppard/Pitthan June 26, 2015 Towards an Undulator Based NLC Positron Source Towards an Undulator Based NLC Positron.
K. LaihemE166 collaboration LCWS06 Bangalore March 12th 2006 The E166 experiment Development of a polarized positron source for the ILC. Karim Laihem on.
Undulator-Based Production of Polarized Positrons An experiment in the 50 GeV Beam in the SLAC FFTB E-166 Undulator-Based Production of Polarized Positrons.
27 June 2006Ken Moffeit1 Comparison of 2mrad and 14/20 mrad extraction lines Ken Moffeit ILC BDS 27 June 06.
Undulator-Based Positron Production in the Final Focus Test Beam (E-166) K.T. McDonald, J.C. Sheppard, Co-Spokespersons SLAC Experimental Program Advisory.
E166 Collaboration About 45+2 members from 16+1 institutions from all three regions (Asia, Europe, the Americas, and Daresbury) About 45+2 members from.
EPAC June 2003 Undulator-Based Production of Polarized Positrons A proposal for the 50 GeV Beam in the FFTB E-166 Undulator-Based Production of Polarized.
NLC - The Next Linear Collider Project Backgrounds Update Tom Markiewicz SLAC LCWS Cornell 15 July 2003.
NLC - The Next Linear Collider Project IR Working Group Summary Tom Markiewicz LC R&D Workshop, UCSC June 29, 2002.
E166 Collaboration J.C. Sheppard SLAC, October, 2003 E166 Background Test Beamtime Request J. C. Sheppard.
M. Woods (SLAC) Beam Diagnostics for test facilities of i)  ii) polarized e+ source January 9 –11, 2002.
1 Overview of the NPDGamma Experiment at the Fundamental Neutron Physics Beamline Geoff Greene UT/ORNL.
The PEPPo e - & e + polarization measurements E. Fanchini On behalf of the PEPPo collaboration POSIPOL 2012 Zeuthen 4-6 September E. Fanchini -Posipol.
Beijing, Feb 3 rd, 2007 LEPOL 1 Low Energy Positron Polarimetry for the ILC Sabine Riemann (DESY) On behalf of the LEPOL Collaboration.
SHMS Optics and Background Studies Tanja Horn Hall C Summer Meeting 5 August 2008.
Polarimetry at the LC Source Which type of polarimetry, at which energies for LC ? Sabine Riemann (DESY), LEPOL Group International Workshop on Linear.
Measurement of Gas Bremsstrahlung at the Pohang Light Source Hyosang Lee Seoul National University, Q2C Pusan National University, HANUL HNP2011.
Xiao-Yan Zhao Beam Instrumentation Group Accelerator Center, IHEP BEPCII Background Issues: Beam Loss Measurement.
ILC undulator based RDR e+ source: Yields and Polarizations for QWT capturing and different drive beam energy: Wei Gai, Wanming Liu Argonne National Lab.,
HPS Beamline: Background Rates, Sensitivity to Field Uncertainties M. Ungaro1HPS Collaboration Meeting, JLAB, May Concrete Wall thickness Study.
HPS T EST R UN C ONTINGENCY P LAN S. Stepanyan JLAB.
J.C. Sheppard, SLAC Americas Region September 27, ILC Positron TDR and R&D Meeting 1: Oxford ILC GDE Activities Update and Undulator Scheme Status.
Integrated Radiation Measurement and Radiation Protection of BES Ⅲ Zhang Qingjiang, Wu protection group, accelerator center, IHEP,
19 July 2006Ken Moffeit1 Comparison of 2mrad and 14/20 mrad extraction lines Ken Moffeit (via Eric Torrence) VLCW06 19 July 06.
1 Overview of Polarimetry Outline of Talk Polarized Physics Machine-Detector Interface Issues Upstream Polarimeter Downstream Polarimeter Ken Moffeit,
Oct. 6, Summary of the Polarisation Session J. Clarke, G. Moortgat-Pick, S. Riemann 10 November 2006, ECFA Workshop, Valencia.
Overview of the GlueX Tagger and Photon Beamline..
Undulator-Based Positron Production in the Final Focus Test Beam (E-166) The International Polarized Positron Production Collaboration K.T. McDonald, J.C.
EIC Compton detector update October 24 th 2014 Alexandre Camsonne.
Polarimetry Report Sabine Riemann on behalf of the DESY/HUB group January 24, 2008 EUROTeV Annual Meeting, Frascati.
Recent Studies on ILC BDS and MERIT S. Striganov APD meeting, January 24.
WG3a Sources Update Jim Clarke on behalf of WG3a GDE Meeting, Frascati, December 2005.
Taikan SUEHARA et al., LCWS2007 & DESY, 2007/06/01 R&D Status of ATF2 IP Beam Size Monitor (Shintake Monitor) Taikan SUEHARA, H.Yoda, M.Oroku,
J.C. Sheppard, SLAC Americas Region September 28, ILC Positron TDR and R&D Collaboration Meeting 1: Oxford GigaZ and Polarization Upgrade Discussion.
J.C. Sheppard, SLAC Americas Region February 7, ILC Source Systems Work Packages and EDR Discussions ILC GDE Meeting IHEP, Beijing, China J. C.
Proposal for the End Station Test Beam (ESTB) at SLAC John Jaros ALCPG09 Albuquerque September 30, 2009.
CsI(Tl) Calorimeter and status of the E166 experiment E166 experiment CsI ( Tl) calorimeter construction. Test beam results vs. Geant4 simulation Schedules.
AD&I Meeting 23/6/10 Jim Clarke
Background simulations: update and simulations of absorbed dose
of High-Energy, High-Density Electron and Positron Beams
A.P. Potylitsyn, I.S. Tropin Tomsk Polytechnic University,
Helical Undulator Insertion Device The heLiCal collaboration
Status Report on E-166 Undulator-Based Production of Polarized Positrons K.T. McDonald Princeton University EPAC Meeting SLAC, November 15, 2003.
E166 - LEPOL - Low Energy Positron Polarimetry for the ILC
End Station Test Beam (ESTB) at SLAC
Interaction Region Design Options e+e- Factories Workshop
Fassò, N. Nakao, H. Vincke Aug. 2, 2005
Crab Crossing Named #1 common technical risk (p. 6 of the report)
CLIC luminosity monitoring/re-tuning using beamstrahlung ?
Presentation transcript:

E166 Collaboration J.C. Sheppard SLAC, October, 2003 E166 Background Test Simulations: Overview-what do we need J. C. Sheppard

J.C. Sheppard SLAC October, 2003 E166 Collaboration Meeting E-166 Background Tests Review and Advisory Committee Robert Noble (chair), C. Field, H. Lynch, and M. Ross ● Design a test in the FFTB to validate that the backgrounds in E-166 are acceptable ● Review results and recommend to Dorfan and Paterson to proceed with E-166 ● E-166 to be run in early calendar 2005 ● Background results roughly by end of calendar 2003

J.C. Sheppard SLAC October, 2003 E166 Collaboration Meeting E-166 Beamline Schematic 50 GeV, low emittance electron beam 2.4 mm period, K=0.17 helical undulator 0-10 MeV polarized photons 0.5 rad. len. converter target 51%-54% positron polarization

J.C. Sheppard SLAC October, 2003 E166 Collaboration Meeting E166 Polarimeter Overview 1 x e -  4 x 10 9  4 x 10 9   4 x 10 7  4 x 10 9   2 x 10 7 e + 4 x 10 5 e +  1 x 10 3  2 x 10 7 e +  4 x 10 5 e +  Polarimeter  and Polarimeter

J.C. Sheppard SLAC October, 2003 E166 Collaboration Meeting E-166 Background Tests There are three sources of E-166 background: ● Streaming from up-beam of the undulator ● Interception at the undulator ● Secondaries produced in the spectrometer Background studies test the first two sources First meeting of R&A committee: June 26, 2003

J.C. Sheppard SLAC October, 2003 E166 Collaboration Meeting E-166 Background Test, June 2003 Shielding to be added as indicated by modeling

J.C. Sheppard SLAC October, 2003 E166 Collaboration Meeting E-166 Background Test, now

J.C. Sheppard SLAC October, 2003 E166 Collaboration Meeting E166 Background Test Goals The goals of the E166 Background Test are to transport a low emittance beam through a small aperture tube located at IP1 in the FFTB and to measure the background levels at the locations of the E166 detectors. Success for this test is demonstrated by being able to keep the beam on with the small aperture tube in place (loss levels below the FFTB radiation limits) and by measuring the background levels at each of 5 detectors to be less than 5% of the signal levels anticipated for E166 proper.

J.C. Sheppard SLAC October, 2003 E166 Collaboration Meeting E-166 Background Test For the background tests, a beam energy of 28 GeV is sufficient. A 1.2 mm id 1, 1 meter long, thin walled SS tube and a protection collimator will be installed at IP1. Five detectors: two Cerenkov- aerogel flux counters, a Si-W calorimeter, a Si-Pad calorimeter, and a CsI calorimeter will be located about 35 m downstream of IP1. Figure 1 shows the approximate layout of the required equipment in the FFTB enclosure. Shielding for the detectors, including Fe blocks representing the E166 magnetized absorbers, for the background tests is commensurate the full E166 experiment. Table 1 lists the expected E-166 signal strengths and 5% background levels

J.C. Sheppard SLAC October, 2003 E166 Collaboration Meeting E-166 Background Tests 1. The 0.9 mm aperture of the E-166 undulator is scaled inversely with the square root of the beam energy from the 50 GeV of E-166 proper to the 28 GeV of the background test. Thus.

J.C. Sheppard SLAC October, 2003 E166 Collaboration Meeting E166 Background Tests, Simulations Questions for the Simulations: ● How much lead ● How much Boron-Polyethylene ● How much blasts thru the 3 mm hole ● Do we need floor, ceiling, side wall shielding ● What is expected change from 28 GeV to 50 GeV We are concentrating on beam splat on the undulator tube and collimator, ignoring essentially everything else (upstream sources, synchrotron radiation, …). Are we fooling ourselves?