July 28 2004GLAST Project Installation Review LATLAT 1 Tracker Tower Installation Review Peter Amnuaypayoat

Slides:



Advertisements
Similar presentations
Tracker Subsystem1 GLAST LAT Project FM8/14 PSR, Oct. 5, 2005 GLAST LAT Tracker Towers 8/14 Pre-Ship Review INFN-Pisa.
Advertisements

GLAST LAT ProjectMarch 24, 2003 HPS Tracker Peer Review, WBS Section 2-D 1 GLAST Large Area Telescope: Tracker Subsystem WBS Structural.
Deviations from fiducial locations are unacceptable in areas despite high accuracy at alignment points.
2005 LAT-COLLABORATION MEETING Gamma-ray Large Area Space Telescope A walk through the LAT Tracker towers alignment Nicola Omodei INFN-Pisa.
IFCT Plan for Next 3 Months Larry Wai June 26, 2003.
TKR-Grid I/F Design Options Grid TKR Flexure Shoulder Bolt (close fit) Conical Bushing Grid TKR Flexure Shoulder Bolt Collar/Pin with conical head (pressed.
GLAST LAT ProjectNovember 04, 2005 Phase 0 TRR 1 GLAST Large Area Telescope: Integration and Test -Electrical Test- Phase 0 TRR Key Requirements Documents.
October 15, 2004GLAST Project Results of 1 st Run P.A. Test Fixture LATLAT 1 RESULTS OF 1 st RUN PITCH ADAPTER TEST FIXTURE Peter Amnuaypayoat
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review I&T Plan.
Tracker Subsystem1 GLAST LAT Project FM7/9 PSR, Sept. 9, 2005 GLAST LAT Tracker Tower7/9 Pre-Ship Review INFN-Pisa.
Where to put Towers A and B in the Grid – technical issues 18-Jan-2005 L. Wai (SLAC/Group K) for LAT I&T.
GLAST LAT ProjectOctober 1st, 2004 GLAST LAT Tracker Anomaly Resolution Team 1 TMCM connector stay clear problem Alessandro Brez INFN - Pisa
111/3/2004 GLAST LAT ProjectLAT Engineering Meeting LAT Face to Face Manager’ Meeting Nov. 3, 2004 LAT Level Design Status LAT Face to Face Manager’ Meeting.
Robert Ruland MMF Introduction, Schedule, Budget October 14, 2004 MMF Review 1 MMF Introduction, Schedule, Budget Robert Ruland.
GLAST LAT ProjectFeb. 17, 2004 Hartmut Sadrozinski: TKR Flex Cables 1 TKR Flex Cable Issues addressed TKR Flex Cable Issues addressed Mechanical 1.Grid.
GLAST I&T January T Borden 1 Tracker EM Mechanical Mock-up T Borden I&T Tracker Mock-up.
GLAST LAT ProjectJune Cost/Schedule Status Meeting 07/23/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to June Cost/Schedule.
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
Tracker Subsystem1 GLAST LAT Project FM6 PSR, July 21, 2005 GLAST LAT Tracker Tower6 Pre-Ship Review INFN-Pisa.
Setup of laser tracker on DX side NOTE: X axis along M1s centers, towards SX Z axis along M1-M2 centers, towards M2.
Integration and Alignment of Optical Subsystem Roy W. Esplin Dave McLain.
GLAST LAT ProjectIntegration and Test CDR Peer Review, March 28, 2003 Document: LAT-PR Section 7 - Page 1 GLAST Large Area Telescope: I & T Peer.
GLAST Large Area Telescope:
1 GLASTGLAST Pisa GLAST Italia meeting, 18/02/02 A.Brez – INFN Pisa GLAST:Gamma Ray Large Area Telescope Ladders, Trays and Towers Construction A.Brez.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems X-LAT Assy1 GLAST Large Area Telescope: Mechanical.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.1 Grid Box Design 1 GLAST Large Area Telescope:
Blade Tuner assembly Instruction for tuner assembly on a cryomodule May
LATLAT CU Beam Test 3rd May GLAST Program CU Beam Test CU Integration Francesco Nicola
LAT-TD GLAST LAT Project Tracker Inner Shipping Container Analysis and Test Results Tracker Inner Shipping Container Analysis and Test Results August.
Tracker Production Overview Readout Cables UCSC, SLAC (Parlex) SSD Procurement, Testing SLAC,Japan, Italy (HPK) Electronics Fabrication, burn-in, & Test.
LAT Design Integration and Analysis1 GLAST LAT Project1 Sep 2005 LAT Monthly Status Review 1 Sep 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT ProjectI&T PDR Presentation (IFCT Dept.) – January 9, 2002 Larry Wai Integration and Test Organization Chart I&T Manager Elliott Bloom WBS
LAT-PR Section 55-1 GLAST LAT ProjectMechanical Design Integration Peer Review, March 2003 Mechanical Design Integration Peer Review, March 2003.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Engineering Model Tower.
GLAST LAT ProjectMarch 24, G Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS G: Tower module assembly A.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
GLAST LAT ProjectMarch 24, H Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS H: Tower Shipping and Storage.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: EM Mini-Tower Robert Johnson.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems Radiator Assy1 GLAST Large Area Telescope: Mechanical.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT ProjectLAT Muons at NRL 28 Feb 2006 J. Eric Grove Naval Research Lab Washington DC LAT Muon Data Taking During Environmental Test at NRL J. Eric.
Tracker Subsystem1 GLAST LAT Project TRAY DELTA MRR, 18 Nov., 2004 GLAST LAT Tracker Delta Manufacturer Readiness Review for Tray Assembly and Test at.
GLAST LAT ProjectMarch 24, F Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS F: Tray assembly A. Brez I.N.F.N.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Electronics Module Testing.
GLAST LAT ProjectPisa 9/1/04 A.Brez 1 GLAST Large Area Telescope: Grid interface proposal Alessandro Brez INFN Pisa Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectMarch 24, E Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS E: MCM Assembly Gamma-ray.
GLAST LAT ProjectMarch 24, 2003 HPS Tracker Peer Review, WBS Section 2-D 1 GLAST Large Area Telescope: Tracker Subsystem WBS Structural.
GLAST LAT Project Integration and Test IFCT Peer Review 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 LAT QA has hired a full-time on-site representative (Donald Knaepple)
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Parts and Materials Procurement.
VEA’s proposal of automated assembly system WP6 meeting, 16/01/14.
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 LAT I&T MGSE Page 1 of 11 GLAST Large Area Telescope: I&T Integration Kickoff Meeting MGSE March.
GLAST LAT ProjectDec 17, 2003 Page 1 GPR Design & Requirements Grid Perimeter Ring (GPR) Design –Ring is comprised of four lengths of Aluminum bolted together.
Tracker Subsystem GLAST LAT Project 1 ANNEX 1 to NCR/FM/INFN/PI/372 STATIC TEST TORQUE LOSS OUT OF SPEC’S ON BOTTOM TRAY S/N 005 Andrea Tenze
SSA Module Assembly ANNEX 0 - Assembly sequence
Annex 5 - Tower and Lock installation
Annex 4 - Moving Frame and Whiffletree assembly
GLAST Large Area Telescope:
Open Issues Modification of Cactus Arm bending tool required
GLAST Large Area Telescope:
Methods and Procedure for adjusting eccentric cones in INFN configuration Peter Amnuaypayoat 5/14/04.
Proposed tools and methods for adjusting eccentric cones in INFN configuration Peter Amnuaypayoat 4/29/04.
GLAST Large Area Telescope:
GLAST Large Area Telescope:
TKR and LAT Survey and Alignment Planning
GLAST Large Area Telescope:
Tracker to Tracker Clearance Reduction Contributors
Presentation transcript:

July GLAST Project Installation Review LATLAT 1 Tracker Tower Installation Review Peter Amnuaypayoat

July GLAST Project Installation Review LATLAT 2Agenda Tracker- Mock-up Eng. Dev. (R. Ruland) Lessons Learned (Peter A.) I&T Flow for Tracker Installation (T. Borden) Grid Interface Hardware List Notation Coordinate System Side Wall Identification Flexure Identification Installation Procedure – INFN Static Test (Non-Aligning) Presetting Procedure Alignment of inner cone relative to outer cone Installation Procedure – INFN Vibration Test (Aligning to CMM measurement) Dithering Procedure Shimming Procedure Cone Removal Procedure Alignment Tools Optical Survey Tools Near-Term Plans Final CMM of Mock-up at SLAC (8/5-6 tbd) I&T Training Grid I/F Hardware for I&T Future Topics (Next Meeting) Flex Circuit Cable Installation Cable Bending Cable Bonding Connector Saver Plan

July GLAST Project Installation Review LATLAT 3 Tracker Mock-up Engineering Development CMM Program established from Tower Mock-up model Developed in Bay area and at INFN Experience gained from Mock-up Tower to Grid simulator installation Alignment of Eccentric cones Testing of the CMM program Differences between Mock-up model and E.M. (Flight like) model Corner Flexures are non flight like (older rev.) Does not contain corner brackets or flight like reflector ball nests

July GLAST Project Installation Review LATLAT 4 Tower Alignment Summary Measurements at INFN –Used their CMM which runs PC-DMIS –Created measurement scripts for automated measurements –Derived CS which puts tower in optimized position, i.e. Z-axis vertical wrt gravity, X, Y symmetrical to actual shape –Determined coordinates of flexure conicals in tower CS –Comparing actuals vs design yields dial-in settings for cones –Applied settings, mounted tower to base –Cross-checks good to 500 µm (TBs too small and loose) Planned measurements at SLAC –Verify procedure by independently creating equivalent measurement routine on our Leitz PMM using Quindos –Repeat measurement / alignment cycle at least three times

July GLAST Project Installation Review LATLAT 5 I&T Flow For Tracker Installation Receive TKR Tower Inspect, Metrology & El Test Final Test Remove CAL, TEM, TEM-PS, & TKR Tower from Single Bay Install CAL, TEM, & TEM-PS Install TKR into alignment fixture Measure TKR and Align Cones Test Prepar e Grid Bay Install TKR Tower into Grid Bay Install TKR Tower into Single Bay Install CAL, TEM, & TEM-PS

July GLAST Project Installation Review LATLAT 6 Grid Interface Hardware list Installation Shims: LAT-DS Outer Eccentric Cone: LAT-DS Inner Eccentric Cone: LAT-DS Hex Bushing: LAT-DS Hex Nut: LAT-DS Shoulder Stud: LAT-DS Corner Flexure Grid

July GLAST Project Installation Review LATLAT 7Notation +Y, +x +Y, -x-X, +y -Y, -x -Y, +x+X,-y +X, +y -X,+Y +X,+Y (reference location) -X,-y -X,-Y (reference location) +X, -Y (reference location) +X +Z +Y Grid Simulator (Tower base plate) +X, +y designates the stud on the + y side of the flexure which is on located on the +X side wall. For all side flexures, the side flexure identifier is capitalized, while the side flexure conical (stud) is in lower case.

July GLAST Project Installation Review LATLAT 8 Installation Procedure (Static test) - INFN Refer to section 2.1 of LAT-DS Installed Grid simulator with no Aligning – Performed on Tower Mock-up – requires no Aligning tools – Adjusting tools required Preset three inner and outer cones to the concentric position For three reference locations Used to locate the position of Tower Align slots on both cones Remaining cones are to be “Dithered” Process in which cones seat to their required position

July GLAST Project Installation Review LATLAT 9 Presetting Procedure Refer to section 6.1 of LAT-DS Section 6.1.9: determine α by using Matlab program “angtool” Setting α, “inner to outer cone angle”

July GLAST Project Installation Review LATLAT 10 Installation Procedure (Aligning to CMM measurement) - INFN Refer to LAT-MD and LAT-PS Tower C.S +Z Struc C.S +Z Tower C.S +Z Define a coordinate system based on the location of Top and Bottom Tray Hardware. Then move it so it is centered on the shape and size of the Sidewalls Calculate Flexure Point offsets from nominal and check against available travel Set Eccentric Cone rotation, then mount Grid Simulator and fit with shims. Determine β for each reference location LAT-PS-04245: Section 2.3

July GLAST Project Installation Review LATLAT 11 Installation Adjusting Procedures Dithering Process in which cones seat to their required position Tool LAT-DS Shimming Procedure Refer to LAT-PS section 9 Measurement of gap Selection of shim stack Cone removal procedure Refer to LAT-PS section 8 Assembly of the cone Extractor Removal of the Inner cone from the Corner Flexure Removal of the Outer cone from the Corner Flexure Separation of Inner cone from Outer cone

July GLAST Project Installation Review LATLAT 12 Alignment Tools

July GLAST Project Installation Review LATLAT 13 Additional Topics Optical Survey Tools Near-Term Plans Final CMM of Mock-up at SLAC (8/5-6 tbd) I&T Training Grid I/F Hardware for I&T Future Topics (Next Meeting) Flex Circuit Cable Installation Cable Bending Cable Bonding Connector Saver Plan