1 Spectrometer Solenoid Design and Cost Update Michael A. Green Lawrence Berkeley Laboratory 10 February 2005.

Slides:



Advertisements
Similar presentations
CM-22 Magnet Issues, 6 June MICE Magnet Cool Down and Other Issues Michael A. Green Lawrence Berkeley Laboratory Berkeley CA
Advertisements

10 June 2006MICE Collaboration Meeting CM-151 Can MICE Solid and Liquid Absorbers be Characterized to better than 0.3 Percent? Michael A. Green 1, and.
The Use of Small Coolers for Hydrogen and Helium Liquefaction
Zian Zhu Superconducting Solenoid Magnet BESIII Workshop Zian Zhu Beijing, Oct.13,2001.
1 Cooling the Hydrogen (Helium) Absorbers with Small Coolers Michael A. Green University of Oxford Department of Physics Oxford OX1 3RH, UK MICE Video.
CM-18 June The Measurement and Monitoring of the Field from the MICE Magnets Michael A Green Lawrence Berkeley Laboratory, Berkeley, USA Frank Filthaut.
MUTAC Review, 9 April MuCOOL and MICE Coupling Magnet Status Michael A. Green Lawrence Berkeley Laboratory Berkeley CA
Magnet quench during a training run Magnet electrical circuit schematic PROGRESS ON THE MODELING AND MODIFICATION OF THE MICE SUPERCONDUCTING SPECTROMETER.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 114 September 18, 2008.
October, 2003 P. Fabbricatore and S. Farinon Spectrometer magnets – Possible layout of cryostat in the end region In order to define the cryostat layout.
Progress on the MICE Cooling Channel Solenoid Magnet System
-1- Wang, Li The 23rd MICE Collaboration Meeting to 17 HIT/CHINA WANG, Li Institute of Cryogenics and Superconductivity Technology.
Spectrometer Solenoid Design and Procurement Review Steve Virostek Mike Green Mike Zisman Lawrence Berkeley National Lab MICE Collaboration Meeting October.
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
Spectrometer Solenoid Report and Coupling Coil Update Michael S. Zisman MICE Operations Manager Center for Beam Physics Lawrence Berkeley National Laboratory.
1 MICE Mtg Oct 2002 Elwyn Baynham RAL Focussing Absorber Magnet Elwyn Baynham ; Tom Bradshaw Iouri Ivaniouchenkov ; Jim Rochford Applied Science Division.
1 Issues concerning the Design of the Tracker Solenoids Michael A. Green Lawrence Berkeley National Laboratory 17 August 2005.
1 Update on Focus Coil Design and Configuration M. A. Green, G. Barr, W. Lau, R. S. Senanayake, and S. Q. Yang University of Oxford Department of Physics.
Michael A. Green Lawrence Berkeley National Laboratory
10 October 2006 MICE CM-16 at RAL 1 Distributed versus Lumped Coupling Magnets Michael A. Green and Soren Prestemon Lawrence Berkeley Laboratory, Berkeley.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 14, 2009.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
1 The Genoa Tracker Solenoids and their Contribution toward a New Design Michael A. Green Lawrence Berkeley National Laboratory and Pasquale Fabbricatore.
1 Quench Protection and the Power Supplies for the MICE Focusing and Coupling Magnets Michael A Green Lawrence Berkley Laboratory 10 February 2005.
MICE Video Meeting, 10 Jan 081 Spectrometer Magnet Progress Michael A. Green Lawrence Berkeley Laboratory.
1 Superconducting Magnets for the MICE Channel Michael A. Green Oxford University Physics Department Oxford OX1-3RH, UK.
1S. Virostek - LBNL Spectrometer Solenoid Fabrication Update S. Virostek and M. Green are visiting vendor today for progress update Vendor expects to complete.
1S. Virostek - LBNL Spectrometer Solenoid Fabrication Update Vendor still expecting to complete first magnet by the end of November, before X-mas more.
MICE Spectrometer Solenoid Design and Fabrication Update Mike Green and Steve Virostek Lawrence Berkeley National Laboratory MICE Video Conference December.
Magnet and Absorber Heat Loads and Cooling with Various Small Coolers
12 March 2006NFMCC Meeting, IIT, Chicago1 Progress on the MICE Cooling Channel and Tracker Magnets Michael A. Green Lawrence Berkeley Laboratory.
Spectrometer Solenoid Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICO.
CM-18 June Magnet Conductor Parameters and How They affect Conductor Selection for MICE Magnets Michael Green Lawrence Berkeley Laboratory Berkeley.
Twin Solenoid Twin Solenoid - conceptual design for FCC-hh detector magnet - Matthias GT Mentink Alexey Dudarev Helder Pais Da Silva Leonardo Erik Gerritse.
1 Progress on the MICE Cooling Channel Magnets Michael A. Green Lawrence Berkeley National Laboratory 28 June 2005.
MICE Spectrometer Solenoid Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
1 Absorber Heat Transfer and Other Issues A Comparison between MICE and the Forced Flow Absorber System Michael A. Green Lawrence Berkeley National Laboratory.
Progress on the MuCool and MICE Coupling Coils * L. Wang a, X. K Liu a, F. Y. Xu a, A. B. Chen a, H. Pan a, H. Wu a, X. L. Guo a, S. X Zheng a, D. Summers.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
Magnet quench during a training run Successfully trained to peak currents and operationally tested Thermal performance requirements met 3D magnetic bore.
Spectrometer Solenoid Test Plan Workshop: Spectrometer Solenoid Overview Steve Virostek - LBNL February 17, 2012.
Some Thoughts on Magnetic Measurements for MICE Michael A. Green Lawrence Berkeley Laboratory Berkeley CA 94720, USA.
Spectrometer Solenoid: Plans to Fix Magnet 2 Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
Abstract: The Muon Ionization Cooling Experiment (MICE) is an international effort sited at Rutherford Appleton Laboratory, which will demonstrate ionization.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 6, 2009.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
MICE Cooling Channel Magnets: Spectrometer Solenoid Procurement RF Module Coupling Coil Proposal Steve Virostek Lawrence Berkeley National Lab NFMCC 07.
Magnet vacuum vessel w/radiation shield and cold mass in place Magnet leads (left) and the three cryocoolers on the top of the spectrometer solenoid service.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting #28 Sofia, Bulgaria.
Spectrometer Solenoid Fabrication Status and Schedule RF Cavity / Coupling Coil Module Plan and Progress Steve Virostek Lawrence Berkeley National Lab.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab NFMCC at LBNL January 25, 2009.
22 October 2005MICE Meeting at RAL1 Tracker Solenoid Overview Michael A. Green Lawrence Berkeley Laboratory MICE Collaboration Meeting 22 October 2005.
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
1 Small Coolers for MICE Michael A. Green University of Oxford Department of Physics Oxford OX1 3RH, UK MICE Collaboration Meeting RAL.
Spectrometer Solenoid Design and Test Results Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
-1- Steve Virostek (LBNL) and Li Wang (SINAP) Instrumentation for the MICE Coupling Coil Steve Virostek Lawrence Berkeley National Lab February.
MICE Spectrometer Solenoid Recovery Review - December 3-4, Steve Virostek MICE Spectrometer Solenoid Design and Assembly.
XVII SuperB Workshop and Kick Off Meeting - La Biodola (Isola d'Elba) Italy May 28 th June 2 nd 2011 P.Fabbricatore Sezione di Genova The air core magnets.
Cooling Circuit Design Steve Virostek Lawrence Berkeley National Lab February 29, 2012 MICE Coupling Coil Cryostat Design Review Lawrence Berkeley National.
MICE CC Magnet Cryostat Design Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE CC Cryostat Design Review LBNL, February.
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
Spectrometer Solenoid Documents and Review Plans Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National.
Michael A. Green and Heng Pan
Design ideas for a cos(2q) magnet
Spectrometer Solenoid Update
Spectrometer Solenoid Fabrication Status and Schedule
Small Coolers for MICE MICE Collaboration Meeting RAL Michael A. Green
The superconducting solenoids for the Super Charm-Tau Factory detector
Budker Institute of Nuclear Physics,
Presentation transcript:

1 Spectrometer Solenoid Design and Cost Update Michael A. Green Lawrence Berkeley Laboratory 10 February 2005

2 Spectrometer Solenoid Options INFN solenoid as per the baseline document General Electric 3 T large bore MRI magnet with the appropriate matching coils A MICE detector solenoid built by LBNL as proposed in the MRI proposal to NSF

3 INFN Detector Solenoid Iron Shield End Coil 2 End Coil 1 Center Coil Match Coil K Cooler Cold Mass Support Match Coil 2 He Cooling Pipe Radiation Shield Al Coil Spacer

4 Using the General Electric 3 T MRI Solenoid as a Detector Magnet It has been proposed that the spectrometer magnet could be a 3 T MRI magnet. This magnet produces only 3 T, but it may be attractive if the price is right. U. Bravar has shown that one can match into the GE magnet using a set of match coils or a large coupling coil. The cost of the match coils is not much different from the cost of the Lab G solenoid. If the GE solenoid is free, then this option may make economic sense. The GE solenoid is actively shielded, so its field does not reach like most magnets this size (Coil D = 1.05 m, and Coil L = 1.5 to 2.0 m depending on the magnet).

5 GE 3-T MRI Solenoid continued The coupling coil or match coils will overwhelm the MRI magnet shim coils, but this may not be an issue. The forces on the GE coils may be an issue. The GE magnet can only take a few tons of force in the longitudinal direction. The new magnets are better than the old magnets in this regard. Because the GE magnet is large (even though it is actively shielded) a quench in an adjacent magnet could trigger a quench in the GE solenoid The GE magnet field could have a negative impact on the PMTs needed for the detectors. It depends on where the PMTs are located.

6 The LBNL Solenoid for the MRI Proposal The NSF proposal call for LBNL to build a single detector solenoid with match coils. This magnet must be compatible with the INFN detector magnet. The LBNL solenoid is less expensive to build because there is less superconductor in the coil. The margin is nearly the same as the INFN magnet even though the conductor current density is much higher. This is allowed because there is an 1100 aluminum bore tube to cause quench back in the magnet coils. The currents and current centers in the LBNL coils are nearly the same as the INFN coils. As a result, magnetically the magnets are nearly identical.

7 The LBNL Solenoid will look more like this, except the coils will be thinner.

8 LBNL Solenoid Possible Parameters The number of turns in the 2nd match coil is off by percent. The number of turns in the 1st end coil is off by percent. The number of turns in the center coil is off by percent. The other coils have exactly the correct number of turns. All of the errors are within an acceptable range according to U. Bravar.

9 LBNL Solenoid continued The potential for cost reduction is based on not only the superconductor mass, but it is also based on the vendor LBNL will use as well as the low cost of the US dollar. The LBNL design is based on using the conductor at high current densities. The quench protection system depends on quench back from the mandrel to the coils. This is key e for safe quenching of the long center solenoid. The detector magnet mandrel can be made from 1100 aluminum because the longitudinal stresses in the magnet are compressive.

10 Powering the LBNL Detector magnet and Magnet Quench Protection Shorted Secondary circuits

11 LBNL Solenoid continued The LBNL coils can be put in series with like coils in the INFN magnet in the event the detector magnets are built by both laboratories. The LBNL design allows for a liquid helium to be on the outside of the coils. The  T from the coil hot spot to the cooler cold head can be minimized. Further optimization may allow the number of 4.2 K coolers to be reduced from three to two, which results in a further reduction of the magnet cost.

12 Concluding Comments The GE 3-T MRI magnet is attractive only if the capital cost for the magnet is low. Matching coils are required to match the GE magnets to the rest of MICE. There are a number of other technical issues associated with using the GE magnets. The LBNL detector magnet will behave the same way the INFN detector magnet behaves. The two magnets are nearly identical in their performance, except during a magnet quench. The LBNL solenoid is attractive in cost, but it is not clear that two can be built in the US. A change in the scope of work may be needed for a number of the partners in MICE, because of a lack of money. Creativity is key to getting MICE built.