1 MICE Video Conference Reception of FC magnets Andy Nichols, STFC, 19-1-12.

Slides:



Advertisements
Similar presentations
1 UK Project Alan Grant, STFC. Finance How savings are made Update on stepIV position Milestones Critical Path - stepIV Concerns 2.
Advertisements

Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
Project Update for the Muon Ionization Cooling Experiment (RAL) Mark Palmer Fermilab December 15, 2014.
1 MICE CM31 Key schedule drivers for Step IV Schedule table Milestone summary Comment on Step V Step VI Andy Nichols, STFC, 3/11/11.
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
1 UKNF/MICE Oversight Committee Open session Integration of the MICE project Background & local history Progress since 2007 Schedule & planning considerations.
1 Project Manager Report Andy Nichols, STFC – RAL MICE Collaboration Meeting, Harbin, 13-17th January 2009.
1 Subsystem Reviews Reviews this week: RFCC modules RF Power Infrastructure MICE Infrastructure LH2 system.
Nov-1st 2004, MICE TV Conf. Plans for absorber tests at KEK Shigeru Ishimoto KEK.
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
1 Fringe fields for stage V Iouri Ivaniouchenkov, Jim Rochford RAL MICE Video Conference, 9 April 2003.
MICE Absorber and Test Cryostat Shigeru Ishimoto KEK MICE AFC Module Phone Conference (March 12, 2004) (1) MICE Absorber Test Process (2) MICE Absorber.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
MICE VIDEO CONFERENCE Cooling Channel/Detector Integration July 30, 2003 Edgar L. Black IIT.
1 Infrastructure issues Andy Nichols, STFC – RAL MICE Collaboration Meeting, Harbin, 13-17th January 2009.
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
CMPB Alain Blondel 14 April STATUS OF MICE.
1 MICE Magnets Contents: Background Refurbishment Testing Installation & survey Current status Upstream beamline Open issues & concerns MICE Beamline Review,
MICE magnetic measurements Sequence of events and MICE hall movements Alain Blondel – 10-April 2012 revision from 13 December 2012.
1 CDM Status Report Andy Nichols, STFC MICE Collaboration Meeting, RAL, June 2009.
1 MICE CM28 STEP III or STEP IV? – some practicalities Andy Nichols/Tim Hayler, STFC 4 th October 2010 Considerations Step II Step III Step IV Conclusions.
1 Project Manager Report Andy Nichols, STFC MICE Collaboration Meeting, RAL, June 2009.
1 MICE CM32 Summary Scheduling and planning; aims for this year Schedule update Main schedule drivers Keeping us on schedule Comment on Steps V & VI Detail.
1 MICE-Video Conference Status of MICE Hall Contents: General status Electrical Mechanical Preparing for Steps II & III Risks and worries Andy Nichols,
Overview and status of international systems Reminder of the principal deliverables Status reports on: Spectrometer solenoids Radio Frequency Coupling.
1 Hall & Beamline Installation Richard Apsimon, Andy Nichols, Willie Spensley MICE Collaboration Meeting, th Feb 2008.
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
MICE: overview K. Long, 18 March, Contents ► Introduction ► Beam line ► Infrastructure ► MICE steps ► Phase II (comment) ► Conclusions.
1 MICE PSAG PM report Brief overview Re-planning the project Solenoids, decay and spectrometer Open issues and worries Andy Nichols, STFC, PSAG, 5/5/10.
1 MICE PM Report Completion of Infrastructure Target, solenoids Phase Two planning & schedule Non-MICE costs Staffing & visitors Don’t have time for a.
MOM Report Galina Vankova RAL, MICE Video Conference.
1 MICE CM28 PM Report Progress since CM27 Schedule, dates, milestones Electrical substation Visiting RAL Andy Nichols, STFC 4 th October 2010.
The status of the construction of MICE Step IV K. Long, on behalf of the MICE collaboration.
Magnetic Shielding Roy Preece. Issues Cooling channel initially designed without return yolks. Current North and South shielding walls designed to encapsulate.
1 MICE MPB/RLSR Integration of Step IV Readiness of the major subsystems Installation sequence and schedule considerations Logistics, staffing and local.
Magnetic Mitigation - Contents l Magnetic Mitigation General l West Wall Compressors l Rack Room 2 l Magnetic Shielding Yoke Jason Tarrant – Integration.
Forum March 2003H.Taureg1 Magnetic Fields in ALICE Mapping and Monitoring.
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l History l Requirements l Environment l Design l Structural Integrity l Preparation l.
Engineering Summary Agenda: Clarification of cooling channel tolerances – Tim Open issues with absorber integration – Andy/Wing.
MICE VC Alain Blondel 30 August MICE VC 103 MICE news -- see Malcolm's news for an inventory. -- great funding news all summer from USA! (phase.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
Issues with variable thickness absorbers Iouri Ivaniouchenkov, RAL MICE Video Conference, 22 Jan
1 MICE PM report Target News Outcome of Spectrometer Solenoid Review New plans for Steps II & III RF Power news MICE CMPB, 4th December, 2009.
Spectrometer Solenoid Schedule MICE Schedule Review May 23 rd 2011 Roy Preece (STFC RAL, LBNL)
1 MICE Beamline Installation, status & plans Contents: Upstream & Target, BPM Decay solenoid DSA, D2, Q4,5,6 cKOV support Q7,8,9 Open issues & concerns.
UK Update Package Managers Meeting 001 Roy Preece 13 th January 2014.
MPB 31 October 2012 and FAC 15 November monitor how well we are doing in assembling step IV ! -- should deliver a ‘realsitic schedule scenario’
MICE Oversight Committee Meeting RAL, 24 April 2014 Paul Soler on behalf of the MICE Collaboration Status of MICE and Spectrometer Solenoids.
1 MICE CM27 PM Report Re-defining the UK project this FY Schedule things Apologies and accommodation Andy Nichols, STFC 7 th July, 2010.
1 MICE PM report – status of Phase II Target update Spectrometer solenoid FC & coupling coils Schedule considerations Project accommodation & management.
1 Engineering Session Summary Andy Nichols, STFC MICE Collaboration Meeting, RAL, June 2009.
Pre-CM33 schedule planning SuperMICO meeting, June 6th Motivation: For all of us to understand the main drivers behind the top-level MICE schedule So that.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
1 Alan Bross AEC March 31, 2008 MuCool RF Program Muon Cooling R&D Alan Bross.
11 T Dipole Project Cold mass integration status & plan F. Savary / TE-MSC-LMF.
1 MICE Schedule Review no 1 Aims of review and description of review charge Motivation and external drivers Aims of the review A few of the problems Description.
Iouri Ivaniouchenkov RAL Specifying the needs for MICE July 8, RAL MICE Collaboration Meeting 1.
1 Project Infrastructure for steps I-III Tim Hayler, STFC – RAL MICE Collaboration Meeting, RAL, nd October 2008.
1 UK Project Roy Preece – STFC Alan Grant, STFC. Finance Staffing Update on stepIV position Milestones Critical Path – stepIV Magnetic field mitigation.
Status of MICE RF for Step V’ (at LBNL) Derun Li Lawrence Berkeley National Laboratory December 6, 2014.
RLSR 16/4/2015 UK Financial Plan & Risks. Content Finances – FY 2014/15 – Cost to Completion Risks – Top level to completion – R9 working space – Summary.
1 MICE CM25 Engineering Session Summary Contents: Infrastructure Diffuser Coupling Coils Radiation Shutter AFC module EMR Andy Nichols, STFC, 4-7 th November.
Step IV Step IV extended through 2016 QP/QD – in progress at FNAL Target dates SSU ECE for Feb now only 20% probability – no-field Feb Remainder for April/March.
Resource Loaded Schedule and Budget Profile
UK Financial Plan & Risks
MICE CM31 Schedule summary
MICE NEWS MICE VC 155 Next Collaboration meeting will be
MICE PM Report Progress with the Infrastructure A few problems
B. 163 facility upgrade: work space options in B. 163 and B. 103 F
Presentation transcript:

1 MICE Video Conference Reception of FC magnets Andy Nichols, STFC,

FC acceptance Firstly, this is a very nice problem to have ! It’s likely that we receive four magnets within a few months of each other (FC*2 and SS*2), between March and October 2012 MICE phased assembly, steps II & III, might have allowed series integration in the MICE hall But given our current step IV plan and the above, we need to work in parallel on integration and have space for storage Space is always a contentious issue at RAL, but we managed to get our hands on building R9 The basic idea is to build a parallel magnet facility Immediate plan is for acceptance trials of FC#1 while LH2 tests and floor building is going on in MICE hall 2

FC acceptance This includes: Cooling Powering Absorber integration Field mapping And general preparation, measurement, etc Power has been laid into R9 Floor is about to be restored and painted Field simulation has been made and is OK for surroundings Presently having asbestos removed from pipe insulation Open questions to Tesla: Details of handling frame/lifting gear Details and dimensions of packing and delivery vehicle All-up ‘as-built’ weight of FC Position of C of G 3

4

5