March 2003 Paul Drumm MICE Collaboration Meeting, CERN 1 Beam Line & Installation Plans Paul Drumm CLRC Rutherford Appleton Laboratory.

Slides:



Advertisements
Similar presentations
Report from MICE project teams Proposed MICE organogram: revised Revised request for resources for financial year 2003/04 Review of iMICE schedules – status.
Advertisements

Report to JMPB Topics: Progress Hall Clearance Programme Hall Layout Beam Line RF Power System MICE Management Structure Common Funds 14 th October 2003.
“Aggressive schedule” seen by MJPB (just for WP1) (incl. VAT) Needed to be aggressive to meet 2005/6 shutdown….
1 MICE Beamline: Plans for initial commissioning. Kevin Tilley, 16 th November. - 75days until commissioning Target, detectors, particle production Upstream.
1 MICE CM31 Key schedule drivers for Step IV Schedule table Milestone summary Comment on Step V Step VI Andy Nichols, STFC, 3/11/11.
MICE TARGET HARDWARE C. Booth, P. Hodgson, R. Nicholson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England. 1 - The MICE Experiment.
MICE Collaboration meeting May 31 st – June 3 rd 2009 RAL Tim Hayler, Andy Lintern DRAFT SEQUENCE OF EVENTS STEPS
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
1 paul drumm; ; FAC-PR MICE Project Status Funding Agency Committee 19 th September 2005.
Paul drumm; 1 st December 2004; PM&TB Report 1 Project Management & Technical Board Reports.
Project Report Paul Drumm CM15, FNAL June MICE Schedule Overview First beam September/October 2007 –Shutdown from January 2007 –Eight months for.
MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19.
MICE Project Status Report to the Funding Agency Committee 19 th September 2005 Paul Drumm MICE Project Manager.
paul drumm; 3rd December 2004; AFC MM 1 Cost & Schedule Review I Terms of reference: –To review the Cost and schedule of the MICE Muon beam –To review.
MICE Project Report Paul Drumm ~ Sunday August 1 st 2004.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
1 MICE Project Report, paul drumm, 9 march 2005 CM Highlights & Tasks… –Tracker base line – scintillating fibres – performance validated –TOF performance.
UK Funding PPRP Meeting on Monday 30 th June Accepted need for urgent work this year –no discussion on this –but also no indication of the level of funds.
UK Costs Beam & Infrastructure Coils Tracking Detector.
1 paul drumm; ; FAC-PR MICE Project Status Report to the Funding Agency Committee 19 th September 2005 Paul Drumm MICE Project Manager.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
Paul Drumm 25 March 2004 MICE at Project Report CERN Collaboration Meeting 29 March 2004.
MICE – the UK Perspective Rob Edgecock RAL/CERN-AB Introduction Introduction UK Contributions UK Contributions Location Location New beamline New beamline.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Phase Two planning sequence Worries Don’t have time.
MICE TECHNICAL UPDATE & ISIS/RAL PLANS. Belgium Italy Japan The Netherlands Russian Federation Switzerland UK USA Acknowledge.
MICE: overview K. Long, 18 March, Contents ► Introduction ► Beam line ► Infrastructure ► MICE steps ► Phase II (comment) ► Conclusions.
MICE Status (with a UK slant) Paul Drumm, MICE Collaboration UK-NF June 2003.
MICE status. Mice layout Beam line elements (including channel magnets) Detector components Civil Engineering Software target Decay Solenoid Beam Stop.
Project manager report paul drumm CM16 October 2006.
Goals and Status of MICE The International Muon Ionization Cooling Experiment J.S. Graulich.
MICE Collaboration Meeting Frascati 26 – 29 June 2005 Work Group report On Design & Safety Review.
1 Layout and Installation MICE Collaboration Meeting, RAL, October 27-29, 2004 Elwyn Baynham, Tom Bradshaw, Paul Drumm, Matthew Hills, Yury Ivanyushenkov,
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
RLSR 16/4/2015 UK Financial Plan & Risks. Content Finances – Cost to Completion Risks – Top level to completion – R9 working space – Summary 2 RLSR 24/11/2014.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
PSI Contact PSI visit arranged for Feb 9th –Assessment of activity/contamination Possible remedial action –Seek additional equipment for solenoid Power.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
Report from MICE project teams Feedback from PPRP MICE funding: various scenarios Issues  Financial year 2003/04  iMICE common fund.
UK status report (funding) Status of UK bid for funding Savings/contributions in kind Gateway process Support from ISIS Conclusions/personal comments.
1 MICE Radiation Shielding MICE Phone Conference, 28 January 2004 Yury Ivanyushenkov Engineering Department, RAL.
Project Managers Report CM40 Collaboration Board – Rome Roy Preece 28 th October 2014.
Hall clearance completed Revisiting Water & Cryo Plant Prepare for shutdown ’04 –beam tube –Contract hole cutting Negotiating with DF to help target work.
Paul Drumm, cm10, 27 Oct 2004 MICE Project Report Paul Drumm Collaboration Meeting 10 Rutherford Appleton Laboratory October 2004.
Target tests 1 st – 2 nd Nov. Chris Booth Sheffield 7 th December 2006.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
MICE FAC open session Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment.
MICE VC Alain Blondel MICE News 9 March 2005 we did not succeed in preparing a good enough I3 proposal for EU on neutrinos. Problems were.
Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
- MICE - The Muon Ionization Cooling Experiment Jean-Sebastien Graulich, Univ. Genève o Introduction: Aims And Concept o Design o Infrastructure: Hall,
MICE VC Alain Blondel 1 1. MOM is now Victoria 2. Linda Coney is new MICE Online Group coordinator (rep Jean-Sebastien) May we held.
Muon Ionization Cooling Experiment Update 1Alan Bross AEM October 14, 2013.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
WBS ? Proposed by IPRP … –Preparation for a review –MICE Costs & Time Scales need to be more accurate & Justified –Technical Leaders arranged by technology.
Status of the MICE Construction Project Resource Loaded Schedule Review 29 th April 2014 Roy Preece.
1 Project Infrastructure for steps I-III Tim Hayler, STFC – RAL MICE Collaboration Meeting, RAL, nd October 2008.
MICE CM23 Introduction and Meeting Goals Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
MICE – UK Plan Roy Preece STFC RAL DOE Review of MAP Brookhaven National Laboratory 13 th August 2014.
Tuesday 9 th January Project Status Report Project Achievements Project Schedule Issues Finance Summary Risk Register Photos.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Worries Don’t have time for a detailed status report,
1 paul drumm; Date; Title …project report …more comments paul drumm february 2005.
RLSR 16/4/2015 UK Financial Plan & Risks. Content Finances – FY 2014/15 – Cost to Completion Risks – Top level to completion – R9 working space – Summary.
What do we want to achieve in this running period? Michael S. Zisman Deputy Spokesmouse Center for Beam Physics Lawrence Berkeley National Laboratory MICO.
Muon Ionisation Cooling Experiment Overview
Status of the MICE Construction Project
MICE Target Report Video Conference 29/11/07
MICE Operations Scenario Run 1
MICE CM31 Schedule summary
MICE PM Report Progress with the Infrastructure A few problems
Completing the Step IV Programme
Presentation transcript:

march 2003 Paul Drumm MICE Collaboration Meeting, CERN 1 Beam Line & Installation Plans Paul Drumm CLRC Rutherford Appleton Laboratory

march 2003 Paul Drumm MICE Collaboration Meeting, CERN 2 Progressing Beam Line Layout Target Position Confirm Beam Angle Locate Position of hole Locate Line for MICE(almost)

march 2003 Paul Drumm MICE Collaboration Meeting, CERN 3

march 2003 Paul Drumm MICE Collaboration Meeting, CERN 4 Target Development active system sharp dip into beam just prior to extraction use fact that beam vanishes for ~10 ms –Reduces strain on drive mechanism low mass design – recoil-less

march 2003 Paul Drumm MICE Collaboration Meeting, CERN 5 active target design University of Sheffield (Booth) RAL – ED (Bradshaw) Interface to ISIS (ISIS)  reliability  reproducibility

march 2003 Paul Drumm MICE Collaboration Meeting, CERN 6 Beam Optics – Optimisation ? Beam Out of Solenoid – Large Emittance Looking at options of –quads before 2 nd dipole –quad after 2 nd dipole –ideally - focus beam ~ mid way between TOF detectors

march 2003 Paul Drumm MICE Collaboration Meeting, CERN 7

march 2003 Paul Drumm MICE Collaboration Meeting, CERN 8 IPRC on the beam line …is it sufficient to make the hole in the shield wall in the next long shutdown? …when would the beam line be completed? …would this preclude the use of the PSI solenoid? …subsequent delay in the mice programme?

march 2003 Paul Drumm MICE Collaboration Meeting, CERN 9..questions …impact on the funding & resource profile? …timescale for decision on the use of the PSI solenoid?

march 2003 Paul Drumm MICE Collaboration Meeting, CERN 10 ….local factors –UK Financial Position – scrape by in 03/04 –ISIS shutdown: – installation of RFQ –ISIS management advice: look at a "minimum" plan for ‘04 Shutdown

march 2003 Paul Drumm MICE Collaboration Meeting, CERN 11 Future Shutdowns Possible Shutdowns? …hypothetical picture

march 2003 Paul Drumm MICE Collaboration Meeting, CERN 12 Use 04 shutdown to cut hole? Consequence  beam line not finished until early 2006 –PSI Solenoid - known quantity early in 2004 –No intermediate beam line envisaged  lose opportunity to –characterise beam –test first solenoid+tracker –test other detectors

march 2003 Paul Drumm MICE Collaboration Meeting, CERN 13 Delay ? 6 months late to start with MS4 Sequence of Measurements maintained  1 year late with full MICE ?

march 2003 Paul Drumm MICE Collaboration Meeting, CERN 14 ….interactions when will solenoid + tracker be ready? when will absorber & focus coils be ready? When will cryogenics system be ready?

march 2003 Paul Drumm MICE Collaboration Meeting, CERN 15

march 2003 Paul Drumm MICE Collaboration Meeting, CERN 16 The fact that ISIS will have subsequent shutdowns had been ignored…. Cost of ~3 months per year ….hypothetical picture

march 2003 Paul Drumm MICE Collaboration Meeting, CERN 17 What RAL will do now….. clear hall during 2003/4 cut into synchrotron during 2004 shutdown start working on target progress design & installation plans …. to enable full funding from pparc/clrc when the risks (for pparc) are clearer.

march 2003 Paul Drumm MICE Collaboration Meeting, CERN 18 What RAL Needs from MICE…. For Installation Planning –Demarcation of responsibilities (formal) installation running decommissioning & removal –how are the MICE timescales evolving? realistic time scales planning of installation & experiment

march 2003 Paul Drumm MICE Collaboration Meeting, CERN 19 Schedule ?

march 2003 Paul Drumm MICE Collaboration Meeting, CERN 20 MICE Project Organogram Joint PPARC/CLRC MICE Project Board RAL Project Board MICE-UK Projects and Groups Beam Line MICE Institutes Collaboration Board/ Steering Committee MICE Institutes Collaboration Board/ Steering Committee Responsible for Technical Specification & Delivery Responsible for Technical Specification & Delivery Responsible for Policy, Monitoring & Specification Focus Coils Cryogenics & Hydrogen Cryogenics & Hydrogen Infrastructure RF …. Detector Target … … Project Management Board Installation Planning !