Initial PEP II Radioactive Waste Disposal Estimate Olga Ligeti August 6, 2007.

Slides:



Advertisements
Similar presentations
HIV Drug Resistance Training
Advertisements

METAL COIL SURFACE COATING MACT FACILITY INSPECTIONS 40 CFR PART 63, SUBPART SSSS May, CFR PART 63, SUBPART SSSS May, 2006.
Contractor Management. Struggling with Contractor Management ? ? ? Getting purchasing on board? Specifically stating environmental compliance in contracts?
H. Sterner E. Thurow Energiewerke Nord GmbH
Idaho Cleanup Project _____________________ ICP Spent Nuclear Fuel Examination Barbara Beller for Kathleen Hain, PBS-12 FPD April 15, NSNFP Strategy Meeting.
Chapter 3 Measuring Excavation and Sitework
Resource Conservation and Recovery Act.
ACADs (08-006) Covered Keywords Lab ware, glassware, balances, heating apparatus, separation apparatus, hydrometers, viscometers, pipettes, titrators,
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
1 Successful decommissioning of a nuclear plant Evelyn Hooft Bart Thieren 20 june 2008.
PEP-II Ramp Down to a Minimum Maintenance State J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007.
Measurement and Survey Protocols Defining and Identifying Radioactive Materials.
Page 1 PEP-II D&D Planning & Costing Exercises John Seeman Accelerator Systems Division SLAC National Accelerator Laboratory.
PEP-II Overview & Ramp Down Plan J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007.
1 Waste Management David Nickless Environmental Management Los Alamos Field Office March 3, 2015.
Metal Suspension and Exemption Planning Sayed Rokni, Jim Allan, James Liu, Olga Ligeti, Amanda Sabourov, Joachim Vollaire ES&H Radiation Protection Department.
Waste management.
NTOF11 Collaboration Meeting Non-Design Issues for the Mercury Jet Target P.T. Spampinato V.B. Graves T.A. Gabriel Princeton University April 29-30, 2005.
Appendix 8.1 – Waste Management Plan Oil Spill Contingency Plan – Land Document Number: KOC.SA.020 Incident Name: Incident Date/Time: Incident Location:
Remote-Handled Transuranic Waste Disposition Discussion Meeting of the National Governors’ Association April 12, 2001 U. S. Department of Energy.
Technical Specification April 23rd-24th 2013Handling Engineering Group1  Technical documents during tender  Contract execution  Documents during contract.
Authorization and Inspection of Cyclotron Facilities Authorization for the Decommissioning of the Facility.
Overview of Materials Disposition. 2 DOE Moratorium and Suspension Effective in 2000 Moratorium prohibits the unrestricted release for recycling of contaminated.
Material Disposition Planning Olga Ligeti Radiation Protection Department MARCH 24, 2009.
Princeton Plasma Physics Laboratory D&D of TFTR Health Physics Safety Radioactive Waste Keith Rule.
Where Complex Challenges Meet Smart Solutions  Technical Services  Packaging  Transload  Transportation  Disposition Rail Transportation of Radioactive,
Green Recycling Network Toward a Greener Tomorrow... Today!
DENSO Denso Manufacturing Michigan Inc. Production Control Supplier Manual Section Packaging Title Packaging Program Responsibilities Control No. PKG-001.
Group New Projects Related to Decommissioning. 29 th May 2008 KNPP Richard Benbow – Head of Kozloduy PMU.
Allen Hughes State Materials Office
Waste Management Working Group CTMA Point Clear, AL W. T. (Sonny) Goldston EnergySolutions Working Group Chair July 6 - 9, 2015.
Waste Management Routine or Non-Routine Waste Generation Activities Remediation/Construction Projects Spills WM.
Idaho Solid Waste Facility Record Keeping June 20, 2006 Idaho Department of Environmental Quality.
August 6, 2007Bill Wisniewski1 D&D Task Force: PEPII team: S.DeBarger, S.Ecklund, A.Hill, D.Kharakh, M.Zurawel BaBar team: H.J.Krebs, S.Pierson, W.Wisniewski.
October Mary Louise Hendrickson Solid Waste Section – Technical Lead
MODULE “PROJECT MANAGEMENT AND CONTROL” SAFETY ASSESSMENT DURING DECOMMISSIONING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
An Alternative Disposal Method for Activated PCB Capacitors N.M. Brachmann F.R. Brumwell S.W. Butala S.Y. Chen J.-J. Cheng Presented at the DOE Accelerator.
MEDICAL WASTE MANAGEMENT REGULATIONS FOR THE HANDLING, TREATMENT & PROPER DISPOSAL OF MEDICAL WASTE, INCLUDING EBOLA WASTE Daniela Ortiz de Montellano.
PEP-II Disassembly Technical Systems PEP-II D&D Review 6-Aug-2007 S.DeBarger S.Ecklund, A.Hill, D.Kharakh, M.Zurawel.
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
MODULE “PROJECT MANAGEMENT AND CONTROL” WASTE MANAGEMENT SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
Construction and Demolition Waste Management at UVM.
1 A Consultancy on management of large amounts of radioactive waste after an emergency situation ~ Experience on aftermath of Fukushima Daiichi NPS accident.
8/18/2010Robert Fairchild LBNL Metals Moratorium Robert Fairchild Lawrence Berkeley National Lab Radiation Protection Group ASW-2010 Metals Moratorium.
Making Molehills out of Mountains A common sense approach to the Metals Moratorium George Goode Manager Environmental Protection Division August 19, 2009.
Corporate Asbestos Review Anthony Peltier 11/2012.
Pre-Construction Activities to include: - Provide effective overlap period and oversight of effort - Estimates during - CPM Schedule - Identify lead-time.
WAO 2012 Bevatron Decommission and Demolition Jim Morel Lawrence Berkeley National Laboratory Welcome to the San Francisco Bay Area.
D&D Review 6 August PEP-II Minimal Maintenance State Upkeep Stan Ecklund (J. Seeman, S. DeBarger, D. Kharakh, M. Zurawel)
B Factory D&D Review: March 23, 2009 Page 1 B Factory D&D: Strategy Overview S. Kahn Director, PPA.
Program Manager’s Review Joe Christy September 19, 2005.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Oil Spill Response Plans A History Lesson PHMSA Review and Approval.
Rail Shipments July 2004.Page number1 Rail Shipments of Radioactive Waste from Rocky Flats to Envirocare in Utah August 2004.
Environmental Site Assessments Hazardous Materials/ Regulated Substances Categorical Exclusion Training Class.
Guidelines for Land Clearing Presented By: SLC Environmental Resources Department.
Louisiana State University Radiation Safety Office
Post-Irradiation Material Handling for the 67Cu Production Test Run
Preliminary Decommissioning Plan for the Canadian Light Source
DLA Disposition Services “How do I direct ship my property?”
The Off-Site Source Recovery Program Capabilities in Recovering Sealed Sources – CTMA, May 23-26, 2017 James (Jim) Matzke.
(Additional materials)
DLA Disposition Services “How do I direct ship my property?”
Michael Sullivan and John Seeman SLAC National Accelerator Laboratory
Waste Disposal / Zero Waste to Landfill
Facilities and Layout Planning
Chemical Purchasing.
J. Seeman Assistant Director for PPA/LCLS
Conventional Facilities (WBS 1
Conventional Facilities WBS 1.9
Fiber Reinforced Polymer Systems
Presentation transcript:

Initial PEP II Radioactive Waste Disposal Estimate Olga Ligeti August 6, 2007

PEP II Radioactive Waste Disposal Estimate Olga Ligeti 2 PEP II Decommissioning and Disposal Plan FY09 Minimally operating state FY10- FY15 Component item incorporation into current and future projects PEP II site sampling analysis plan Complete site and component sampling and characterization Official request for proposals for D & D FY15 Award D&D contracts Waste processing and disposal begins

August 6, 2007 PEP II Radioactive Waste Disposal Estimate Olga Ligeti 3 PEP II DIMENSIONS Ring 7250 feet length 12 feet width 12 feet height Injector lines 1100 feet length 12 feet width 12 feet height

August 6, 2007 PEP II Radioactive Waste Disposal Estimate Olga Ligeti 4 PEPII DIMENSIONS II Potentially activated concrete and soil areas Area LocationLength (ft)Width (ft)Depth (ft)Sides IR 2 Area (1) IR 2 Area (2) IR 4 Collimator IR 6 Collimator IR 8 LER Dump IR 10 HER Dump IR 12 Collimator501024

August 6, 2007 PEP II Radioactive Waste Disposal Estimate Olga Ligeti 5 ASSUMPTIONS D&D will meet EPA and Stanford University requirements D&D will follow DOE guidelines Conducted in accordance with current SLAC protocols Decommissioning Contractor will support waste packaging and loading operations

August 6, 2007 PEP II Radioactive Waste Disposal Estimate Olga Ligeti 6 Radioactive Waste Paper Flow/Authorization

August 6, 2007 PEP II Radioactive Waste Disposal Estimate Olga Ligeti 7 REQUIREMENTS Pre – Decommissioning Approved Sampling Analysis Plan (SAP), characterization, release criteria, and clean up levels. MSDS or analytical results for all radioactive painted items to prove paint is non-hazardous Tunnel concrete and soil from ceiling, walls and floor are sampled and characterized according to the SAP.

August 6, 2007 PEP II Radioactive Waste Disposal Estimate Olga Ligeti 8 REQUIREMENTS II Decommission Radiological characterization of waste beam line components and supports is performed as the items are removed, prior to packaging. All mixed wastes must be shipped within 90-days of generation. All personnel performing packaging and shipping functions shall possess appropriate Certified DOT training.

August 6, 2007 PEP II Radioactive Waste Disposal Estimate Olga Ligeti 9 REQUIREMENTS III Post Decommission Clean up levels verified and documented. Continue shipping mixed wastes within 90-days of generation. Ship radioactive waste within one year of generation. All personnel performing packaging and shipping functions shall possess appropriate Certified DOT training.

August 6, 2007 PEP II Radioactive Waste Disposal Estimate Olga Ligeti 10 Radioactive Waste Volume Determination Basis FFTB preservation model Soil expansion ratio Twice the volume of components than at FFTB (site specific knowledge) Re-use and salvage hold items also in 2X proportionality

August 6, 2007 PEP II Radioactive Waste Disposal Estimate Olga Ligeti 11 EQUIPMENT DENSITY FFTB

August 6, 2007 PEP II Radioactive Waste Disposal Estimate Olga Ligeti 12 EQUIPMENT DENSITY PEP II

August 6, 2007 PEP II Radioactive Waste Disposal Estimate Olga Ligeti 13 FFTB EXPERIENCE - CABLES

August 6, 2007 PEP II Radioactive Waste Disposal Estimate Olga Ligeti 14 PROPORTIONAL ESTIMATES EQUIPMENT VOLUME Low Level Waste (components/support structure) 103,675 cubic feet Low Level Mixed Waste 8,967 cubic feet

August 6, 2007 PEP II Radioactive Waste Disposal Estimate Olga Ligeti 15 MORATORIUM & SUSPENSION METALS EXCLUDED Status change may affect volume of materials handled as waste Affects future storage management decisions Limited on site storage locations

August 6, 2007 PEP II Radioactive Waste Disposal Estimate Olga Ligeti 16 PROPORTIONAL ESTIMATES CONCRETE & SOIL VOLUME Low Level Waste (areas identified on slide 4) 136,000 cubic feet Area LocationLength (ft)Width (ft)Depth (ft)Sides IR 2 Area (1) IR 2 Area (2) IR 4 Collimator IR 6 Collimator IR 8 LER Dump IR 10 HER Dump IR 12 Collimator501024

August 6, 2007 PEP II Radioactive Waste Disposal Estimate Olga Ligeti 17 FFTB SUCCESS 17,874 cuft 92 Lift Liners 34 Truckloads 3 WEEKS

August 6, 2007 PEP II Radioactive Waste Disposal Estimate Olga Ligeti 18 PERSONNEL TIME Determination Basis FFTB personnel needs and LLNL legacy waste project personnel usage Process mixed waste out within 90-days of generation Process radioactive waste as generated for 12 months 100% personnel effort allocated to project. Waste packaging and loading support provided by D&D contractor. 54,080 hrs of coordinators/professionals 110,240 hrs of technicians

August 6, 2007 PEP II Radioactive Waste Disposal Estimate Olga Ligeti 19 LOGISTICS Determination Basis 15 yrs Experience Containers  Lift Liners ( used at FFTB – soil/concrete)  Custom Wraps (currently using for oversize items)  Standard waste boxes (Type A – higher dose rate items) Transport  Trucking

August 6, 2007 PEP II Radioactive Waste Disposal Estimate Olga Ligeti 20 COSTS Determination Basis Pricing calculation performed using FY07 dollars Personnel costs calculated using current contractor pricing quotes. Radioactive waste disposal costs calculated using current DOE contract pricing for disposal at EnergySolutions. Current contracts expire soon and no new terms are known Container and transportation costs also calculated using current pricing quotes.

August 6, 2007 PEP II Radioactive Waste Disposal Estimate Olga Ligeti 21 ESTIMATE EXCLUSIONS Personnel, Costs, and time associated with: Site characterization as required by EPA, DOE D&D guidance Dismantling, removal of components, demolition and excavation Management of currently unidentified waste items without a path for disposal or requiring special handling, such as: Lead encased sources Reactive mixed wastes Management of Hold Materials Management of Hazardous Wastes

August 6, 2007 PEP II Radioactive Waste Disposal Estimate Olga Ligeti 22 ESTIMATE TOTAL ITEMQUANTITYCOST SHIPPING COORDINATOR54,080 hrs$7.8 M TECHNICIAN110,240 hrs$10.6 M LOW LEVEL WASTE DISPOSAL239,675 ft 3 $8.25 M * MIXED WASTE DISPOSAL8,967 ft 3 $3.1 M* TRANSPORTATION530 trucks$ 4.24 M PACKAGING1010 units$ 2.2 M TOTAL$ M

August 6, 2007 PEP II Radioactive Waste Disposal Estimate Olga Ligeti 23 ASTERISK ITEMS Disposal costs could increase by a factor of 10 based on the following: waste characterization shows additional mixed waste volumes Site characterization shows activation under greater area of tunnel waste minimization efforts are not used

August 6, 2007 PEP II Radioactive Waste Disposal Estimate Olga Ligeti 24 FUTHER EVALUATION Obtain cost estimates for Sampling analysis plan development. Obtain cost estimates for site sampling and characterization. Develop cost estimate for Hazardous Waste management based on results of site characterization. Develop cost estimate for storing Hold materials on site.