Informatikdienste / IT-Services 30. Jan :T. Steiger, ID / SD, Beowulf Day Status Report of Implementations Gonzales
ID / SD Statusreport 30. Jan. 2006, T. Steiger, ID / SD Status Report of Implementations Installation of the Racks Installation of the Nodes Installation of the Network(s)
ID / SD Statusreport 30. Jan. 2006, T. Steiger, ID / SD Status Report of Implementations Racks The power density of the Gonzales nodes makes water cooled racks neccessary in order to cover the thermal requirements "CoolTrans“ Cool Transfer Unit
ID / SD Statusreport 30. Jan. 2006, T. Steiger, ID / SD Status Report of Implementations Racks the temperature and humidity of the racks can be remotely controlled
ID / SD Statusreport 30. Jan. 2006, T. Steiger, ID / SD Status Report of Implementations Nodes All new nodes and 20% of the existing are already installed in the water cooled racks. 40 nodes per rack New nodes are already installed and configured Wednesday all Gonzales nodes will be moved
ID / SD Statusreport 30. Jan. 2006, T. Steiger, ID / SD Status Report of Implementations Network(s) Ethernet Cabling has been temporarily done for installation of the OS and to run the burn-in procedure Quadrics Node level switches have been delivered to DALCO and are to be installed within today Clock modules will be expected within this week It is scheduled to have the 288 Nodes up and running within next week
Informatikdienste / IT-Services 30. Jan :T. Steiger, ID / SD, Beowulf Day Status Report of Implementations Thank you for your attention!