Informatikdienste / IT-Services 30. Jan. 2006 :T. Steiger, ID / SD, Beowulf Day Status Report of Implementations Gonzales.

Slides:



Advertisements
Similar presentations
IBL CO 2 cooling control system development status Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI.
Advertisements

Cisco 6500 E-Series Chassis Up-grade
Deployment Adavatages Provisioning time reduced to minutes, not days to weeks! Configure hardware Install OS Configure OS & Tools Assign IP Addr Configure.
Electrical distribution for ALICE experiment & Electronic Rack Control S. Philippin.
WebStat™ Programming and Configuration of Thermostats.
André Augustinus 16 June 2003 DCS Workshop Safety.
Flavio Dal Corso - INFN Padova1 OPERA coll. meeting - Hamburg 3 July 2004 RPC & XPC Electronics Status Front End Boards (FEBs) Controllers HV system Crates.
Schutzvermerk nach DIN 34 beachten Network: Passive Station.
Informatikdienste / IT-Services :: Andreas Dudler Beowulf Status.
PALM-3000 P3K Team Meeting #9 Stephen Guiwits Team Meeting #9 and 023 Robinson October 22, 2008.
Status at P2 C. Lippmann Jan. 22, 2007 TRD DCS workshop at PI, Heidelberg.
All Experimenters’ Meeting January 09, Accelerator Operation Summary Calendar Week # 51 NuMI Weekly Integrated Intensity 8.81E18 protons BNB Weekly.
1 Network Packet Generator Characterization presentation Supervisor: Mony Orbach Presenting: Eugeney Ryzhyk, Igor Brevdo.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 28 July 2003 Sam Burke UCSB HEP Group.
SGI Confidential Application Processor. SGI Confidential Application Processor Overview Application Field Replaceable Units The Application.
1 Timescales Construction LCR MICE Beam Monitoring counters + DAQ My understanding Jan 07 Feb 07 Mar 07 Apr 07 May 07 Jun 07 Jul 07 Aug 07 Sep 07 ISIS.
ACORDE FOR TPC TEST Status report. Top Modules Bottom Modules.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 21 July 2003 Sam Burke UCSB HEP Group.
The Gantt Chart in Project Management. What is a Gantt Chart?  A type of chart that shows the Work Breakdown Structure (WBS) in terms of the start and.
LCLS-II Linac LLRF Control System – L1, BC1 Zheqiao Geng Final Design Review May 7, 2012.
Cisco Networking Academy Training Program in Afghanistan.
Legacy Remote I/O Upgrade to Ethernet
So, Jung-ki Distributed Computing System LAB School of Computer Science and Engineering Seoul National University Implementation of Package Management.
Chapter 12 Computer Networks. Basic Concepts in Computer Networking – Communication Links – Figure 12.1a –Two Forms of Information Representation (a)
Farm Completion Beat Jost and Niko Neufeld LHCb Week St. Petersburg June 2010.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
Status and plans for online installation LHCb Installation Review April, 12 th 2005 Niko Neufeld for the LHCb Online team.
M. Gilchriese Sector Status Module Loading Task Force Meeting November 18, 2004.
F Booster Long Straight Corrector Upgrade Technical Status and Schedule for Installation Craig Drennan DOE Tevatron Operations Review March 27, 2007.
R. Fantechi. TDAQ commissioning Status report on Infrastructure at the experiment PC farm Run control Network …
Messages asynchronously reads or writes a block of data to another module on a network. Controller communication done using local or remote messages. local.
TOF Gas System Project Overview. Content Prototype for Aging tests done for RPC’s TOF Gas System: parameters and module layouts. Special Technology: channel.
JCOV 24 NOVEMBER 2005 J.Godlewski EP-ATI 1 JCOV NOVEMBER 2005 ATLAS cooling systems installation plans Jan Godlewski CERN EP-ATI The H.Niewodniczanski.
DSS  Informal review Tuesday 24 th October 10:00 Room , organized by Laurent Roy.  Subsystems will not be allowed to run overnight or at weekends.
IDE DCS development overview Ewa Stanecka, ID Week, CERN
Status of RF stations for NICA project MAC meeting october 2015.
Online System Status LHCb Week Beat Jost / Cern 9 June 2015.
Monitoring in Prague metro Martin Vaníček - CTU. Monitoring in Prague Metro Cambridge 18 June 2010 Martin Vaníček Types of monitoring in Prague Conventional.
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Power supplies dismounted Shipped to Orsay this week Refurbishment work to start.
1 Onsite Status Itaru Nakagawa RIKEN/RBRC. 2 Schedule.
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Work almost finished in Orsay Small crisis 20 days ago due to late delivery of.
1 S-FRS Magnet Test Bench SuperFRS Magnet Test Bench Power Converter Status H. Thiesen 13 May 2015.
Status of the NA62 network R. Fantechi 23/5/2012.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/21.
RTTC rack status Apr. 14 th 2005 Loïc Brarda, CERN.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
The Quality Control Company Quanti TM product series “Simplicity is the ultimate sophistication” - Leonardo da Vinci.
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN Steps towards beam commissioning: RF system group Paolo Craievich :: RF Section :: Paul Scherrer Institut SwissFEL.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
1 04 April 2007 L. Roy Detector Safety System for infrastructure - General fire detection (barracks, cavern) - Sniffer system (smoke detection above the.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/14.
BACKBONE NETWORKS. A backbone network allows several LANs to be connected. In a backbone network, no station is directly connected to the backbone; the.
S A Griffiths CM42 June 2015 Electrical & Control.
CMV-NET Chigo VRF Network Centralized Control System
ATF2 Magnet Power Supplies
352MHz Klystron Control for the 3MeV Linac test stand
WP02 PRR: Master Oscillator and RF Reference Distribution
التأهيل التربوي المملكة العربية السعودية جامعة الملك عبدالعزيز
LCLS Cavity BPM Electronics Undulator Week January 22, 2008
License Service Sorosh Olamaei.
دانشگاه شهیدرجایی تهران
TileCal ROD Commissioning Counting Room Installation
تعهدات مشتری در کنوانسیون بیع بین المللی
بسمه تعالی کارگاه ارزشیابی پیشرفت تحصیلی
New cluster capabilities through Checkpoint/ Restart
AKSUM UNIVERSITY ICT Directorate Oct 10, 2018 Axum, Tigray, Ethiopia
Status of the ESS High Power RF Systems

Rack and Interconnect Design in E-plan
Presentation transcript:

Informatikdienste / IT-Services 30. Jan :T. Steiger, ID / SD, Beowulf Day Status Report of Implementations Gonzales

ID / SD Statusreport 30. Jan. 2006, T. Steiger, ID / SD Status Report of Implementations Installation of the Racks Installation of the Nodes Installation of the Network(s)

ID / SD Statusreport 30. Jan. 2006, T. Steiger, ID / SD Status Report of Implementations Racks The power density of the Gonzales nodes makes water cooled racks neccessary in order to cover the thermal requirements "CoolTrans“ Cool Transfer Unit

ID / SD Statusreport 30. Jan. 2006, T. Steiger, ID / SD Status Report of Implementations Racks the temperature and humidity of the racks can be remotely controlled

ID / SD Statusreport 30. Jan. 2006, T. Steiger, ID / SD Status Report of Implementations Nodes All new nodes and 20% of the existing are already installed in the water cooled racks. 40 nodes per rack New nodes are already installed and configured Wednesday all Gonzales nodes will be moved

ID / SD Statusreport 30. Jan. 2006, T. Steiger, ID / SD Status Report of Implementations Network(s) Ethernet Cabling has been temporarily done for installation of the OS and to run the burn-in procedure Quadrics Node level switches have been delivered to DALCO and are to be installed within today Clock modules will be expected within this week It is scheduled to have the 288 Nodes up and running within next week

Informatikdienste / IT-Services 30. Jan :T. Steiger, ID / SD, Beowulf Day Status Report of Implementations Thank you for your attention!