Detector Systems Update MICO April 23, 2008. MICE Detector Systems  CKOV u Nothing new  TOF0/1 u Tests to identify the source of the problems in the.

Slides:



Advertisements
Similar presentations
Detector Systems Update MICO March 17, MICE Detector Systems  CKOV u Mississippi RAL  TOF0/1 u Hamamatsu PMT assemblies show an increasing.
Advertisements

MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 18 th May 2009.
MAUS Update Adam Dobbs, MICE Project Board, 16 th April 2015.
M. Bonesini - VC TOF status M. Bonesini Sezione INFN Milano Bicocca.
M. Bonesini1 TOF design updates M. Bonesini – INFN Milano.
Online Reconstruction Update Linda R. Coney UCR Mar 25, 2010.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 11 th May 2009.
Online Reconstruction Update Linda R. Coney UCR Dec 17, 2009.
MICE Video MTG 9/25/2002 MICE Fiber Tracker Design Update Requirements and Proposed Detector Implementations A. Bross Fermilab.
M. Bonesini PID Meeting1 M. Bonesini INFN Milano MICE TOF0 construction & planning.
Detector Systems Update MICO May 19, MICE Detector Systems  Beam Monitors u Over heating of sender boards has been s Solution.
Linda R. Coney – 24th April 2009 Online Reconstruction & a little about Online Monitoring Linda R. Coney 18 August, 2009.
Detector Systems Update MICO April 14, MICE Detector Systems  CKOV u Nothing new  TOF0/1 u H6533MOD PMT assembly reliability is the main concern.
MICE: The International Muon Ionization Cooling Experiment Diagnostic Systems Tracker Cherenkov Detector Time of Flight Counters Calorimeter Terry Hart.
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DDAQ Pending Issues o Detector FEE o Software framework o Trigger o Data Storage Jean-Sebastien Graulich,
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 12, 2010.
Detector Systems Update MICO March 3, MICE Detector Systems  CKOV u CKOV humidity (HIH4000) and temperature (LM35) sensors in hand for installation.
Tracker 2 Cryo &Electronics Update Linda Coney, UC Riverside Terry Hart, U Mississippi Ben Freemire, IIT Malcolm Ellis, Brunel University ADB MICE Collaboration.
Detector Systems Update MICO April 7, MICE Detector Systems  CKOV u Installed, first signals seen  TOF0/1 u 8 new H6533MOD assembly PMTs have.
KEK TB Phase II setup status Alan Bross MICE Tracking Group Meeting Daresbury Lab August 30, 2005.
Detector Systems Update MICO March 10, MICE Detector Systems  CKOV u No update  TOF0/1 u Tests with laser injection system progressing. u Tests.
Spectrometer Solenoid Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICO.
1 G4MICE TOF Reconstruction & KEK Test Beam Analysis Update Aron Fish Tracker Phone Conference May 25, 2006.
Detector Systems Update MICO Feb 25, MICE Detector Systems  CKOV u CKOV installation planned during March shutdown u Cable issues resolved. Geneva.
MOM Report Linda R. Coney MICE Operations Manager University of California, Riverside MICO March 30, 2009.
1 M. Bonesini - CM 25 RAL 5/11/09 PID status report M. Bonesini Sezione INFN Milano Bicocca.
MICE Tracker Readout and Data Acquisition; Solenoid Magnetic Field Measurement Terry Hart for the MICE Collaboration, Illinois Institute of Technology,
M. Bonesini - MICE CM18 RAL 16/06/071 M. Bonesini INFN Milano Updates on TOF project.
Takashi Matsushita Imperial College T. Matsushita 1 Tracker Status.
MICE CMPB Alain Blondel 19 April spokesperson remarks CMPB MICE NEWS.
Physics Program and Runs: Autumn 2011 & Step IV V. Blackmore MICE Project Board, 08/03/12.
24/11/2014MAUS Status, A. Dobbs, MPB Talk2 24/11/2014MAUS Status, A. Dobbs, MPB Talk3 CKOV – Threshold Cherenkov detectors (aerogel) TOF – Three Time.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
K. Long, 10 October 2015 Project Manager’s report Status/progress since CM18 Looking forward Organisation Conclusions.
Detector Systems For May/June Run MICE Video Meeting April 24, 2008.
27/6/05 Frascati1 M. Bonesini INFN Milano MICE TOF stations updates.
1 MICE Tracking Detectors Malcolm Ellis NFMCC Meeting 12 th March 2006.
Tracker Summary Alan Bross MICE CM October 10, 2007.
PANDA FTOF Prototyping Anton A. Izotov, Gatchina
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Cosmic Ray Tests at RAL AFE-IIt Firmware Development VLSB Firmware Development Summary.
M. Bonesini - MICE Inst Meeting M. Bonesini INFN Milano TOF installation plans.
MICE Phase 1 Koji Yoshimura KEK June
1 KEK test-beam software progress Malcolm Ellis MICE Video Conference 4 th May 2005.
1 AFE IIt/VLSB Update Terry Hart, MICE Tracker Phone Conference September 5, 2007.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
Name _____________________________________________ Week of__________________ Find the matching stamp and stamp your letter in the box.
1Malcolm Ellis - Tracker Meeting - 28th November 2006 Electronics - Station Acceptance  Hardware: u 1 MICE cryostat with 1 VLPC cassette. u VME crate,
1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1 Fabrication and Installation TOF0 CKOV1 TOF1 EMCAL TOF2.
VLPC System Update A.Bross MICE CM Feb 9, Cryo  Production cryostats 1 and 2 ran smoothly at operating temperature  However, Cassette 109 in cryo.
Database David Forrest. What database? DBMS: PostgreSQL. Run on dedicated Database server at RAL Need to store information on conditions of detector as.
Xenon Detector Installation schedule Satoshi MIHARA.
MICE CM39 St Catherine’s, Oxford, 26 June 2014 Paul Soler Instrumentation Global Commissioning Plan.
Detector Summary Tracker. Well, as far as the tracker hardware is concerned, we are done. – Need to do the system test to make sure nothing has degraded.
M. Bonesini – CM 291 PID detectors summary M. Bonesini Sezione INFN Milano Bicocca.
Xtal Calorimeter with Fiber Readout work by diploma student  Ralph Dollan (HU) Achim Stahl DESY Zeuthen 10.Oct.2003 LumiCal BeamCal.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICE Video Conference May 20, 2010.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
MINER A at the Triple Point: Three Phases at once Deborah Harris AEM August 31, 2009.
What do we want to achieve in this running period? Michael S. Zisman Deputy Spokesmouse Center for Beam Physics Lawrence Berkeley National Laboratory MICO.
K. Long, 28 June, 2016 Introduction to MICE — and the role of the Hydrogen Delivery System.
MAUS Status A. Dobbs CM43 29 th October Contents MAUS Overview Infrastructure Geometry and CDB Detector Updates CKOV EMR KL TOF Tracker Global Tracking.
Linda Coney MICO June 6, 2011 MICE Online Report.
Shashlyk DAQ and FEE Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA DAQ and FEE Workshop, Rauischholzhausen Castle.
MICE. Outline Experimental methods and goals Beam line Diagnostics – In HEP parlance – the detectors Magnet system 2MICE Optics Review January 14, 2016.
MICE. Outline Experimental methods and goals Beam line Diagnostics – In HEP parlance – the detectors Magnet system 2MICE Optics Review January 14, 2016.
HADES collaboration meeting XXX, Lisbon, 7-10 October, 2015,
MICE VLPC Cryo Update Alan Bross MICE CM18 June 13, 2007.
AFE IIt/VLSB Update Firmware Progress Hardware Progress AFE IIt VLSB
Subsystem Mgrs F2F Meeting Calorimeter Subsystem
CLAS12 Timing Calibration
Presentation transcript:

Detector Systems Update MICO April 23, 2008

MICE Detector Systems  CKOV u Nothing new  TOF0/1 u Tests to identify the source of the problems in the PMTs are on going. u Next week Dr. Yoshizawa of Hamamatsu PMT research division is going to Milano to try to help understand the source of problems.  Calorimeter u Calibrations of the KL modules have been concluded. u The detector has been dismantled and put in horizontal position ready for packing. u Further modifications to the provisional supporting trolley have been planned to match the mechanical support of TOF1. u Materials to build safe and robust boxes for shipment have been procured.

 Tracker Electronics u Progress on Firmware u Multi-board readout with all 4 boards on Cryostat #1 has been accomplished. u Work will continue this week to move on to readout of the full Tracker 1 readout system (8 boards) and then work will move on to LED testing and full cassette characterization.