Initial Calibration and Stability Results from the LiCAS RTRS FSI System John Dale for the LiCAS Collaboration IWAA February 2008.

Slides:



Advertisements
Similar presentations
X-Ray Survey of The ATLAS SCT. The ATLAS Semi-Conductor Tracker.
Advertisements

Frequency Scanning Interferometry (FSI) measurements
SXC meeting SRON, July 19-20, SXC meeting 19-20/07/2007 Alignment Positioning of mirror with respect to detector (internal). Positioning of total.
Stephen Gibson, ATLAS Offline Alignment, 2 nd July Incorporating FSI with the Offline Alignment Overview ATLAS Group, University of Oxford Stephen.
S. M. Gibson, IWAA7 November ATLAS Group, University of Oxford, UK S. M. Gibson, P. A. Coe, A. Mitra, D. F. Howell, R. B. Nickerson Geodetic Grids.
AMULET Advanced Metrology Using LasEr Tracers John Dale.
FLAO Alignment Procedures G. Brusa, S. Esposito FLAO system external review, Florence, 30/31 March 2009.
The LiCAS FSI Subsystem Current Status and Initial Measurements John Dale for the LiCAS Collaboration IOP HEP April 2008.
X-Ray Survey of The ATLAS SCT. The ATLAS Semi-Conductor Tracker.
ILC roles Interferometry Results 2009 / 2010 Mon 20 Apr :00 JST (01:00 UTC) MDI TILC09 – Tsukuba OXFORD MONALISA 1.
Accelerator and Beam Delivery The LC-ABD (Linear Collider: Accelerator and Beam Delivery) consortium is a group of UK institutes aiming to develop new.
The Linear Collider Alignment and Survey (LiCAS) Project Richard Bingham*, Edward Botcherby*, Paul Coe*, Grzegorz Grzelak*, Ankush Mitra*, Johannes Prenting.
LiCAS Project: FSI Overview Richard Bingham, Edward Botcherby, Paul Coe, John Green, Grzegorz Grzelak, Ankush Mitra, John Nixon, Armin Reichold University.
Final Doublet Stability and in-detector Interferometry MONALISA David Urner Oxford University.
Use of a commercial laser tracker for optical alignment James H. Burge, Peng Su, Chunyu Zhao, Tom Zobrist College of Optical Sciences Steward Observatory.
Sta bilization of the F inal F ocus : Stabilization with Nano-Meter Precision.
Warsaw University LiCAS Linear Collider Alignment & Survey IWAA08, G. Moss 1 The LiCAS LSM System First measurements from the Laser Straightness.
StaFF: Motion Stabilization with Nano-Meter Precision Proposed experiment conducted within framework of StaFF (Stabilization of Final Focus for ILC). Funded.
S. M. Gibson, P. A. Coe, Photon02, 5 th September Coordinate Measurement in 2-D and 3-D Geometries using FSI Overview ATLAS Group, University of.
The Linear Collider Alignment and Survey (LiCAS) Project Richard Bingham, Edward Botcherby, Paul Coe, John Green, Grzegorz Grzelak, Ankush Mitra, John.
LumiCal Alignment System Status report Leszek Zawiejski, Tomasz Wojtoń, Arkadiusz Moszczyński Institute of Nuclear Physics PAN, Cracow 25th FCAL Collaboration.
X-Ray Survey of The ATLAS SCT. The ATLAS Semi-Conductor Tracker.
M.Lintz, ICSO mode laser telemetry 1 "T2M": two-mode telemetry for high accuracy absolute distance measurement M. Lintz, C. Courde, A. Brillet,
NA62 Gigatracker Working Group Meeting 2 February 2010 Massimiliano Fiorini CERN.
Status on MONALISA presented by D. Urner 6 th stabilization day 9. June 09.
MONALISA David Urner Paul Coe Matthew Warden Armin Reichold Oxford University.
Concepts for Combining Different Sensors for CLIC Final Focus Stabilisation David Urner Armin Reichold.
ANATAC Meeting Line Length Correction Status 2004-Apr-23.
1 StaFF Progress Report David Urner University of Oxford.
David Urner, Oxford University, RHUL – June StaFF Stabilization of Final Focus Motion Stabilization with Nano-Meter Precision David Urner Paul Coe.
LASER AND ADVANCES IN METROLOGY
ATF2 meeting LAPP; David Urner 1 David Urner Paul Coe Matthew Warden Armin Reichold Geoffrey Rayner MPhys alumnus MONALISA Monitoring, Alignment.
MONALISA an Update David Urner Paul Coe Matthew Warden Armin Reichold Monitoring, Alignment & Stabilisation with high Accuracy.
Optical surface measurements for very large flat mirrors Jim Burge, Peng Su, and Chunyu Zhao College of Optical Sciences University of Arizona Julius Yellowhair.
LiCAS Applied Geodesy Group Warsaw University , RHUL, EuroTeV WP7, LiCAS Armin Reichold, LiCAS Linear Collider Alignement and Survey.
Stabilization of Focus at ATF2 David Urner University of Oxford.
Frequency Scanned Interferometer Demonstration System Tim Blass, Jason Deibel, Sven Nyberg, Keith Riles, Haijun Yang University of Michigan, Ann Arbor.
Frequency Scanned Interferometer Demonstration System Jason Deibel, Sven Nyberg, Keith Riles, Haijun Yang University of Michigan, Ann Arbor American Linear.
Alignment Bars Requirements Strategy Layout Length Prediction Shape Prediction Readout Scheme Model to predict bar shape in the experiment Calibration.
An Off-Axis Hartmann Sensor for Measurement of Wavefront Distortion in Interferometric Detectors Aidan Brooks, Peter Veitch, Jesper Munch Department of.
1/10 Tatsuya KUME Mechanical Engineering Center, High Energy Accelerator Research Organization (KEK) ATF2-IN2P3-KEK kick-off meeting (Oct. 10, 2006) Phase.
CALIBRATION Erwin Pilch Prevessin Site, F CERN CEDEX, FrancUniversity of Technology Graz, Austria 9 th August
Roshene McCool1 Phase Transfer & WANs 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Local Oscillator distribution over fibre Roshene McCool SPDO – Signal.
ILC Main Linac Alignment Simulations John Dale 2009 Linear Collider Workshop of the Americas.
The 25 ‑ m f /0.7 primary mirror for the Giant Magellan Telescope (GMT) is made of seven 8.4 ‑ m segments in a close packed array. Each of the off-axis.
LASER FRAME: Straightness monitor (Tentative results of resolution test) Third Mini-Workshop on Nano Project at ATF May 30-31,2005 KEK Nano BPM Group Y.Higashi,
MONALISA David Urner Paul Coe Matthew Warden Armin Reichold Monitoring, Alignment & Stabilisation with high Accuracy.
WP3 The LiCAS Laser Straightness Monitor (LSM) Greg Moss.
Current Status of LASER FRAME for KEK-Nano BPM (Tentative results of resolution test) Second Mini-Workshop on Nano Project at ATF December 11-12, 2004.
MONALISA Update David Urner ATF2 Meeting Dec
IPBSM Operation 11th ATF2 Project Meeting Jan. 14, 2011 SLAC National Accelerator Laboratory Menlo Park, California Y. Yamaguchi, M.Oroku, Jacqueline Yan.
Simulations - Beam dynamics in low emittance transport (LET: From the exit of Damping Ring) K. Kubo
24 September 2001ATNF Imaging Workshop1 The Sydney University Stellar Interferometer (SUSI) John Davis School of Physics University of Sydney 24 September.
Laser Alignment System for LumiCal and BeamCal Arkadiusz Moszczyński, Wojciech Wierba, Leszek Zawiejski Institute of Nuclear Physics PAN, Cracow 22nd FCAL.
J. H. Burgea,b, W. Davisona, H. M. Martina, C. Zhaob
Piezo and retroflector calibration Understanding the details of interferometer performance.
Laser Adaptive Optics for Advanced LIGO
Interference of Light Ø It is generally He-Ne type that generates stable coherent light beam of two frequencies. one polarized vertically and another.
WP3 Frequency Scanning Interferometry Analysis Techniques for the LiCAS RTRS John Dale.
Continuous Frequency Scanning Interferometry
Summary FD Support System
From: Microtube Laser Forming for Precision Component Alignment
First Data from the Linear Collider Alignment and Survey Project (LiCAS) The ILC requires unprecedented accuracy, speed and cost efficiency for the survey.
Thermal Compensation of the Radius of Curvature of GEO600 Mirrors
David Urner Paul Coe Matthew Warden Armin Reichold Oxford University
Welcome to the National Physical Laboratory
Optical configuration of GIF
AMULET Advanced Metrology Using LasEr Tracers (and various other bits)
LightGage™ Frequency Scanning Technology
David Urner, Armin Reichold , Paul Coe, Matthew Warden, Geoff Rayner
Presentation transcript:

Initial Calibration and Stability Results from the LiCAS RTRS FSI System John Dale for the LiCAS Collaboration IWAA February 2008

2 Introduction Frequency Scanning Interferometry (FSI) Reference Interferometers –Design –Initial Length Calibration –Initial Thermal Calibration LiCAS Train FSI Measurement Sub- Systems –Initial Stability of the External FSI Sub-System –Initial Stability of the Internal FSI Sub-System

3 Frequency Scanning Interferometry Tunable Laser Reference Interferometer: L Measurement Interferometer: D Change of phase: Δ Φ meas Change of phase: ΔΦ ref time I Ref time I meas Idea is adapted from the Michelson interferometer Instead of moving the mirror we change the frequency of the laser

4 Reference Interferometer Design Folded path interferometer with 6m Optical Path length Difference (OPD) Adjustable launch to compensate for thermal Expansion Aluminium Mirror Mount Aluminium Launch Tube Aluminium Mirror Mount Invar 34 Frame

5 Reference Interferometer Design Invar Temperature Sensors 3 Adjustable mirrors Adjustable Launch Tube

6 Length Calibration Method Reference Interferometer: L ref Tunable Laser Motion Stage Laser Tracker Retro Reflectors L StageInitial ΔLΔL FSI System Measures Length Ratio at each Position Laser Tracker Measure Length Change to each Position

7 Length Calibration Plot ΔL vs L ratio Gradient of the line is L ref Length Ratio Error : 1E-6 Motion Stage Length Change Error : 10E-3 Error Bars Scaled by factor of 10000

8 Expected 10E-3 Expected 1E-6 Length Calibration RMS 3.9E-7 RMS 3.1E-3

9 Length Calibration Fit Results Fit give reference length of – /- 3E-6 m To improve value : –Take smaller steps –Use Laser tracker in optimum position and more accurate mode –Cover optical path to reduce air turbulence

10 Thermal Calibration Method Environmental Chamber Interferometer Acts as reference Interferometer Being calibrated One Interferometer remains at constant temperature and acts as the reference Second interferometer in environmental chamber and is the interferometer under calibration Environmental chamber has its temperature changed and the length ratio measured at each temperature

11 Thermal Calibration Method 2 Stages to thermal calibration –Stage 1 Conduct experiment to determine thermal expansion coefficient adjust the launch tube to minimise thermal expansion coefficient repeat. –Stage 2 When launch adjustment required is small, conduct experiment Use thermal expansion coefficient for off line corrections

12 Initial Thermal Calibration Results Gradient : 8.50E-7 +/- 1.09E-7 mk -1

13 Retro Reflector External FSI Sub-System System responsible for measuring wall markers Unit has 6 FSI Lines Note: These are bare fibres with no collimators or beam splitters All 6 fibres monitor the same retro reflector LiCAS RTRS Unit FSI Line Wall Retro Reflector FSI Lines

14 Initial Stability of External FSI Sub- System RMS 1.71E-6 RMS 1.06E-6 RMS 1.54E-6RMS 0.78E-6 RMS 1.70E-6 RMS 1.25E-6

15 External Marker Reconstruction Using External FSI Lines RMS 1.26E-6 RMS 0.57E-6 RMS 3.12E-6

16 Internal FSI Sub-System Used to determine the distance from one unit to the next First Unit has 6 collimated fibres Second Unit has 6 retro Reflectors Each Fibre Monitors a different retro reflector LiCAS RTRS Unit Collimated fibre Retro Reflector

17 Initial Stability of Internal FSI Sub- System

18 Initial Stability of Internal FSI Sub- System E E E E-6 Units Have Rotated By : 16 μradian RMS : 61nm RMS : 45nm RMS : 70nm RMS : 102nm

19 Summary Reference Interferometers are under calibration External FSI System giving precision of µm We have the ability to reconstruct wall marker positions to a precision of order 1.5µm Internal FSI System giving precision of nm