EUFORIA FP7-INFRASTRUCTURES-2007-1, Grant 211804 JRA3 B. Guillerminet on behalf of the JRA3 project 22 January 2008 Kick-Off Meeting 21-24 January 2008.

Slides:



Advertisements
Similar presentations
March 6 th, 2009 OGF 25 Unicore 6 and IPv6 readiness and IPv6 readiness
Advertisements

Current status of grids: the need for standards Mike Mineter TOE-NeSC, Edinburgh.
Legacy code support for commercial production Grids G.Terstyanszky, T. Kiss, T. Delaitre, S. Winter School of Informatics, University.
EUFORIA FP7-INFRASTRUCTURES , Grant JRA4 Overview and plans M. Haefele, E. Sonnendrücker Euforia kick-off meeting 22 January 2008 Gothenburg.
EUFORIA FP7-INFRASTRUCTURES , Grant Scientific Workflows Kepler and Java API 4 HPC/GRID ITM meeting Juelich 2009 Michał Owsiak Marcin Płóciennik.
C. Grimme, A. Papaspyrou Scheduling in C3-Grid AstroGrid-D Workshop Project: C3-Grid Collaborative Climate Community Data and Processing Grid Scheduling.
© Geodise Project, University of Southampton, Applications and Middleware Hakki Eres, Fenglian Xu & Graeme Pound.
1 Software & Grid Middleware for Tier 2 Centers Rob Gardner Indiana University DOE/NSF Review of U.S. ATLAS and CMS Computing Projects Brookhaven National.
Slides for Grid Computing: Techniques and Applications by Barry Wilkinson, Chapman & Hall/CRC press, © Chapter 1, pp For educational use only.
Office of Science U.S. Department of Energy Grids and Portals at NERSC Presented by Steve Chan.
Enabling Grids for E-sciencE Medical image processing web portal : Requirements analysis. An almost end user point of view … H. Benoit-Cattin,
EUROPEAN UNION Polish Infrastructure for Supporting Computational Science in the European Research Space Cracow Grid Workshop’10 Kraków, October 11-13,
SUN HPC Consortium, Heidelberg 2004 Grid(Lab) Resource Management System (GRMS) and GridLab Services Krzysztof Kurowski Poznan Supercomputing and Networking.
INFSO-RI Enabling Grids for E-sciencE FloodGrid application Ladislav Hluchy, Viet D. Tran Institute of Informatics, SAS Slovakia.
- 1 - Grid Programming Environment (GPE) Ralf Ratering Intel Parallel and Distributed Solutions Division (PDSD)
08/11/908 WP2 e-NMR Grid deployment and operations Technical Review in Brussels, 8 th of December 2008 Marco Verlato.
EUFORIA FP7-INFRASTRUCTURES , Grant Scientific Workflows Kepler and Java API 4 HPC/GRID Hands on tutorial - ITM Meeting 2009 Michal Owsiak.
TRASC Globus Application Launcher VPAC Development Team Sudarshan Ramachandran.
:: ::::: ::::: ::::: ::::: ::::: ::::: ::::: ::::: ::::: ::::: ::::: :: GridKA School 2009 MPI on Grids 1 MPI On Grids September 3 rd, GridKA School 2009.
EGEE-III INFSO-RI Enabling Grids for E-sciencE Lessons learnt from the EGEE Application Porting Support activity Gergely Sipos Coordinator.
Summary of distributed tools of potential use for JRA3 Dugan Witherick HPC Programmer for the Miracle Consortium University College.
DORII Joint Research Activities DORII Joint Research Activities Status and Progress 6 th All-Hands-Meeting (AHM) Alexey Cheptsov on.
ITPA/IMAGE 7-10 May 2007 Software and Hardware Infrastructure for the ITM B.Guillerminet, on behalf of the ITM & ISIP teams (P Strand, F Imbeaux, G Huysmans,
INFSO-RI Enabling Grids for E-sciencE Supporting legacy code applications on EGEE VOs by GEMLCA and the P-GRADE portal P. Kacsuk*,
Resource Brokering in the PROGRESS Project Juliusz Pukacki Grid Resource Management Workshop, October 2003.
Grid Execution Management for Legacy Code Applications Grid Enabling Legacy Code Applications Tamas Kiss Centre for Parallel.
EUFORIA FP7-INFRASTRUCTURES , Grant EUFORIA: EU Fusion fOR ITER Applications Marcus Hardt
Cracow Grid Workshop October 2009 Dipl.-Ing. (M.Sc.) Marcus Hilbrich Center for Information Services and High Performance.
EGEE-Forum – May 11, 2007 Enabling Grids for E-sciencE EGEE and gLite are registered trademarks A gateway platform for Grid Nicolas.
Migrating Desktop Marcin Płóciennik Marcin Płóciennik Kick-off Meeting, Santander, Graphical.
Holding slide prior to starting show. A Portlet Interface for Computational Electromagnetics on the Grid Maria Lin and David Walker Cardiff University.
NA-MIC National Alliance for Medical Image Computing UCSD: Engineering Core 2 Portal and Grid Infrastructure.
BalticGrid-II Project BalticGrid-II Kick-off Meeting, , Vilnius1 Joint Research Activity Enhanced Application Services on Sustainable e-Infrastructure.
SEE-GRID-SCI The SEE-GRID-SCI initiative is co-funded by the European Commission under the FP7 Research Infrastructures contract no.
BalticGrid-II Project The Second BalticGrid-II All-Hands Meeting, Riga, May, Joint Research Activity Enhanced Application Services on Sustainable.
Kraków Kick-off meeting Migrating Desktop General concept Intuitive Grid-user’s work environment independent of a hardware.
Enabling Grids for E-sciencE Astronomical data processing workflows on a service-oriented Grid architecture Valeria Manna INAF - SI The.
TCS-ICS interactions Kuvvet Atakan 1 and the WP6 and WP7 Teams 1 University of Bergen / Department of Earth Science.
EUFORIA FP7-INFRASTRUCTURES , Grant JRA3, SA1, SA2 & SA3 parallel session 23 January 2008 Kick-Off Meeting January 2008 Goteborg (Sweden)
EUFORIA FP7-INFRASTRUCTURES , Grant Migrating Desktop Uniform Access to the Grid Marcin Płóciennik Poznan Supercomputing and Networking Center.
SHIWA and Coarse-grained Workflow Interoperability Gabor Terstyanszky, University of Westminster Summer School Budapest July 2012 SHIWA is supported.
Università di Perugia Enabling Grids for E-sciencE Status of and requirements for Computational Chemistry NA4 – SA1 Meeting – 6 th April.
EGI Technical Forum Amsterdam, 16 September 2010 Sylvain Reynaud.
BalticGrid-II Project EGEE UF’09 Conference, , Catania Partner’s logo Framework for Grid Applications Migrating Desktop Framework for Grid.
1 Further information and next steps Further information and next steps Gergely Sipos MTA SZTAKI
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks gLite – UNICORE interoperability Daniel Mallmann.
INFSO-RI Enabling Grids for E-sciencE gLite Test and Certification Effort Nick Thackray CERN.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Interfacing gLite services with the Kepler.
Migrating Desktop Uniform Access to the Grid Marcin Płóciennik Poznan Supercomputing and Networking Center Poznan, Poland EGEE’07, Budapest, Oct.
EGI-InSPIRE RI EGI Community Forum 2012 EGI-InSPIRE EGI-InSPIRE RI EGI Community Forum 2012 Kepler Workflow Manager.
Migrating Desktop Uniform Access to the Grid Marcin Płóciennik Poznan Supercomputing and Networking Center Poland EGEE’08 Conference, Istanbul, 24 Sep.
Grid Execution Management for Legacy Code Architecture Exposing legacy applications as Grid services: the GEMLCA approach Centre.
New Workflow Manager Katarzyna Bylec PSNC. Agenda Introduction WLIN Workflows DEMO KIWI Design Workflow Manager System Components descripton ▫ KIWI Portal.
Tutorial on Science Gateways, Roma, Catania Science Gateway Framework Motivations, architecture, features Riccardo Rotondo.
SHIWA Simulation Platform (SSP) Gabor Terstyanszky, University of Westminster EGI Community Forum Munnich March 2012 SHIWA is supported by the FP7.
Gang Chen, Institute of High Energy Physics Feb. 27, 2012, CHAIN workshop,Taipei Co-ordination & Harmonisation of Advanced e-Infrastructures Research Infrastructures.
1 An unattended, fault-tolerant approach for the execution of distributed applications Manuel Rodríguez-Pascual, Rafael Mayo-García CIEMAT Madrid, Spain.
The EPIKH Project (Exchange Programme to advance e-Infrastructure Know-How) gLite Grid Introduction Salma Saber Electronic.
INTRODUCTION TO XSEDE. INTRODUCTION  Extreme Science and Engineering Discovery Environment (XSEDE)  “most advanced, powerful, and robust collection.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Shared Services and Tools MPI John Walsh, Isabel Campos, Antonio Laganà EGITF-2010,
JRA1 Middleware re-engineering
Bob Jones EGEE Technical Director
Scientific workflow in Kepler – hands on tutorial
Tamas Kiss University Of Westminster
Support to MPI, Schedulers and Complex Workflows
Marc-Elian Bégin ETICS Project, CERN
Leanne Guy EGEE JRA1 Test Team Manager
PROCESS - H2020 Project Work Package WP6 JRA3
Gordon Erlebacher Florida State University
Introduction to the SHIWA Simulation Platform EGI User Forum,
Presentation transcript:

EUFORIA FP7-INFRASTRUCTURES , Grant JRA3 B. Guillerminet on behalf of the JRA3 project 22 January 2008 Kick-Off Meeting January 2008 Goteborg (Sweden)

EUFORIA FP7-INFRASTRUCTURES , Grant Outline Participants Objectives of JRA3  Portal  Jobs launching  Data access  Codes orchestration  Visualization  Service administration Connections with the others activities Plans  Road map  Risks assessment

EUFORIA FP7-INFRASTRUCTURES , Grant WHO Participants:  PNSC: 24 months (N Meyer, M Owsiak, B Palak, M Ptocennik)  UEDIN: 8 months (L Smith, J Hein)  Chalmers: 4 months (P Strand, T Svedberg, D Nilsson)  IPP: 8 months (D Coster)  CEA: 16 months (M Airaj, B Guillerminet)  ULP: 8 months (E Sonnendrucker, R David, P Navarro) Structure  JRA3 leader & coordinator of JRA3/JRA4: B Guillerminet (CEA)

EUFORIA FP7-INFRASTRUCTURES , Grant Objectives What

EUFORIA FP7-INFRASTRUCTURES , Grant Objective: Portal Requirements:  single access point (based on ROAM, Shibboleth, SAFE …?)  access to applications (based on Migrating Desktop): Data (codes & simulations) mining tool (catalogues + database) Simulation parameters editor (Java based) KEPLER: workflow (Java based) Post-processing tools (SCILAB, VISIT …)  user queries  Accounting, monitoring Tasks:  Specify & realize the Web portal  Integrate our applications in the portal Who?  PNSC (24 months)  UEDIN (8 months)  Chalmers (?)  IPP (?)  CEA & ULP participate to the integration & tests of the applications

EUFORIA FP7-INFRASTRUCTURES , Grant Objective: Jobs launching Requirements:  Complex workflows: loops, various directors, sequential & parallel execution  Long duration simulations: jobs could be launched at each time step (batch) and some must be kept alive (call + notification: interactive jobs)  Need a Java API for EGEE (gLite based) & HPC (UNICORE 6): temporary certificate, job submission, get job status, get job output + message oriented middleware (call + notification)  Integration in the workflow engine (Kepler) Status:  EGEE: Globus version (already in Kepler)  gLite: in progress  Migrating Desktop as a “gateway” between Kepler and GRID/HPC infrastructure Needs:  Access to EGEE (gLite + VO fusion) & HPC (unicore 6) infrastructures  Support + investigation for the non-batch part (interactive jobs?) Who?  CEA (6 months / 16)  PNSC Proxy Job transfer via FTP Data transfer via FTP Job scheduli ng via JCL

EUFORIA FP7-INFRASTRUCTURES , Grant Objective: Data access Requirements:  Access to external data (EGEE/HPC): open, get, put … a data structure (allocatable array)  Fast access: in-memory data during the simulation (avoid memory to file + file transfer + …)  Integration in the UAL (Many languages implementation: C/C++, F90, Java, …) Must be defined clearly: connection with SA3 for SAFE Needs:  Access to EGEE (gLite + VO fusion) & HPC (unicore 6) infrastructures: SA1 & SA2  Investigation with the biomedical & astronomy projects 4th …)  Support: SA3 Who?  CEA (4 months / 16)  Chalmers (?)  IPP (?)

EUFORIA FP7-INFRASTRUCTURES , Grant Objective: Codes orchestration Requirements:  Codes launching (EGEE/HPC) and coupling from the workflow engine: use the previously provided libraries  Distributed workflow: part of the workflow will run on the gateway, on EGEE and on HPC  Integration of codes: JRA1, JRA2 deliverables  Building a workflow based on ITM & JRA1/2 codes Needs:  Investigation of various workflow engines: Gridway, … => collaboration or support  Collaboration with UCSD (Kepler team): designing tool for distributed workflows Who?  CEA (6 months / 16)  IPP : building the workflow?

EUFORIA FP7-INFRASTRUCTURES , Grant Objective: Visualization Tasks:  Integrate the new visualization tools (based on VTK, Visit) in the code platform: Developments of specific actors Used in a workflow (during the simulation) As post-processing tool  Integration of the compression algorithm (deliverable from JRA4)? actor or as a library Needs:  Collaboration with JRA4: deliverable, training … Who?  CEA (<1 months / 16)  ULP (?)

EUFORIA FP7-INFRASTRUCTURES , Grant Objective: Service administration Requirements:  Deliverable from SA3: User administration Resource management Accounting Reporting  Tool based on SAFE (UEDIN) Task  Integration in the portal Needs  Training on SAFE and support from SA3 Who?  PNSC (24 months)  UEDIN (8 months)

EUFORIA FP7-INFRASTRUCTURES , Grant Connection with the others activities NA1, NA2, NA3  Management: bi-weekly, f2f (3 months), GA (1 year)  Training on GRID, HPC, SAFE, Migrating Desktop  Dissemination SA1, SA2, SA3  Login & CPU time to develop & test our software  Help  Implementation of the service administration facilities

EUFORIA FP7-INFRASTRUCTURES , Grant Connection with the others activities JRA1, JRA2  JRA1, JRA2 provide several codes  Execution using the API  Needs for orchestration  Data access (ITM data structure)? JRA4  JRA3 provides Kepler + tools  Development of actors and integration of VTK, Visit, …  Actor for data compression

EUFORIA FP7-INFRASTRUCTURES , Grant Road map  Work is mainly in 2008 & 2009 Plans

EUFORIA FP7-INFRASTRUCTURES , Grant Deliverables Plans 2008

EUFORIA FP7-INFRASTRUCTURES , Grant Risks assessment Jobs launching:  only the batch mode is available => simulations will be less efficient Data access  No external data => could use file transfer (GridFTP …) => hidden to the user Orchestration  No way to run a part of Kepler on the GRID/HPC => use Gridway and build a tool to convert the Kepler workflow to Gridway Plans 2008

EUFORIA FP7-INFRASTRUCTURES , Grant Work methods Define precisely the work plan (JRA3 parallel session) as a communication tool Additional collaborative tools (Savannah, Wiki …)? Meetings: PSG (2 weeks) + F2F (3 months) => rely on NA1 management Mobility?