K. Long, 16 June, 2015 MICE Muon Beam. Beam line and decay solenoid: Pressure reducing valves: Fitted to Q7—9; To be fitted to Q4—6 Upstream MLI: Plan.

Slides:



Advertisements
Similar presentations
K. Long, 18 April, 2015 Beam-line status — red sky at night?
Advertisements

MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 18 th May 2009.
June 26, 2009TLH, NFMCC Friday Meeting1 MICE Updates MICE News Overview ISIS and MICE Schedules DAQ Review Spectrometer Update Aspirational Schedule Terry.
1 MICE Video Conference Installations to date Future installation work Plans for May shutdown MICO organisation Use of Technical Board.
9/10 solenoid case – a snapshot with Transport m. apollonio IC purpose: understand how the beam envelope changes when operating with a reduced solenoid.
MICE Collaboration meeting May 31 st – June 3 rd 2009 RAL Tim Hayler, Andy Lintern DRAFT SEQUENCE OF EVENTS STEPS
MOM Summary 11/01/10 Due to the Inclement Weather it has perhaps been quieter than usual Water - Tank has been holding water fine. Some ice has been forming.
MICE Target Report Chris Booth (for target team) Sheffield 7 th May 2009.
MICE VC 15/3/07Chris Nelson MICE Hall. Issues Realistically, I would expect D2 drawings to go for tender by end next week 23/3 but I hope we can use same.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 27, 2009.
On MICE Coordinate System Yury Ivanyushenkov RAL.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICE Video Conference April 22, 2010.
128 April 2008 Spectrometer Solenoid Fabrication Update MICO Meeting 19 May 2008 S. Virostek, M. Zisman LBNL.
K. Long, 14 June, 2015  Target K. Long, Friday, 24 th April 2009.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 11 th May 2009.
1 Subsystem Reviews Reviews this week: RFCC modules RF Power Infrastructure MICE Infrastructure LH2 system.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 12, 2010.
MOM - M.ApollonioMICO meeting - RAL - 17/3/20081 NEXT steps + proposed aims Today - START Cherenkov INSTALLATION (?) Tuesday 25 MARCH - MICO Meeting (?
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
1 MICE Project Report, paul drumm, 9 march 2005 CM Highlights & Tasks… –Tracker base line – scintillating fibres – performance validated –TOF performance.
MOM Report. Shield Wall – Gone Before During After 2.
Alain Blondel MICE VC 9 september 2010 Spokesmouse report o VC 22nd April o 12th-13th May posters for IPAC (Vittorio Palladino) o VC 20th May o IPAC May.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO May 5, 2009.
K. Long, 27 June, 2015  Target K. Long, Monday, 06 July 2009.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
Stator Plan & Schedule Chris Booth 2 nd March stators to construct for mid-April. One complete coil assembly recovered from ISIS drive. Coils recoverable.
MOM Report Linda R. Coney MICE Operations Manager University of California, Riverside MICO April 6, 2009.
1June 1 st 2009MICE CM24 - RAL1 MICE Beamline m. apollonio.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 19, 2010.
Commissioning needs: K.Long. Routine: LN2 bottle: –Needs to be sited in MICE Hall or outside vault so that routine checks of contents can be made.
K. Long, 13 July, 2015  Target K. Long, Monday, 06 July 2009.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
MOM Report Linda R. Coney MICE Operations Manager University of California, Riverside MICO March 30, 2009.
1 STEP III MICE Analysis Workshop RAL – 4/9/2008 m. apollonio, IC.
1 Project Manager Report Andy Nichols, STFC MICE Collaboration Meeting, RAL, June 2009.
MICE: overview K. Long, 18 March, Contents ► Introduction ► Beam line ► Infrastructure ► MICE steps ► Phase II (comment) ► Conclusions.
Infrastructure Update As at 11 th March 2009 Remaining four plates now fitted to North shield wall North & South walls and all galleries are considered.
1 MICE PSAG PM report Brief overview Re-planning the project Solenoids, decay and spectrometer Open issues and worries Andy Nichols, STFC, PSAG, 5/5/10.
MOM Report Galina Vankova RAL, MICE Video Conference.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
EE planning meeting Lucie Linssen 1 CERN EE regional centre and Dee assembly plans Dee assembly TA3, not for EE Supercrystal regional centre.
M. apollonio MICE Beamline summary. - Beamline parallel session (June 1 st ): - envisaged goals (Alain) - assess readiness of the line magnet status (Ken)
Request to join MICE collaboration from MOMENT (IHEP and Sichuan Uni.) Jingyu Tang Institute of High Energy Physics, CAS MICE Collaboration Board Meeting.
Target Installation Plan. Requirement Assemble and test two complete target systems in time for August shutdown How do we do this? What do we need to.
Particle Production in the MICE Beamline IPAC10 Linda Coney, UC Riverside, Adam Dobbs, Imperial College London, Yordan Karadzhov, Sofia University The.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
MICE Target Mechanical Design l Status of Target ref. Schedule »Drawings –Drawing list created (see next slide) includes inventory –Drawings being released.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
Alain Blondel MICE VC 12 March 2009 Brief MICE news 1. Decay solenoid: operations will restart in early July. Criteria for acceptance have been specified.
Spectrometer Solenoid Schedule MICE Schedule Review May 23 rd 2011 Roy Preece (STFC RAL, LBNL)
MICE VC116 Alain Blondel 18 December MICE NEWS See more details in Macolm’s MICE news!
1 MICE Beamline Installation, status & plans Contents: Upstream & Target, BPM Decay solenoid DSA, D2, Q4,5,6 cKOV support Q7,8,9 Open issues & concerns.
WEEK 1 You have 10 seconds to name…
BLIP Operations – 162 days of operation o Safety o Forklift needs a new tire o Production o Sr-82 targets out of beam as of 14 Jun o New Sr-82 targets.
Muon Ionization Cooling Experiment Update 1Alan Bross AEM October 14, 2013.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICE Video Conference May 20, 2010.
1June 2 nd 2009MICE CM24 - RAL1 m. apollonio Beamline+( ,P) matrix.
17 Sept 2007 Analysis PC 18 Sept Analysis PC Schedule 2007 Tuesdays alternate weeks, 15:30 – 17:00 GMT, with ad hoc exceptions Tue 3 April Tue 17.
Beamline Update Adam Dobbs, MICE CM38 Feb Contents Recent and Upcoming Activities Target Conventional magnets Decay Solenoid Proton Absorber Summary.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Worries Don’t have time for a detailed status report,
K. Long, 28 June, 2016 Introduction to MICE — and the role of the Hydrogen Delivery System.
Stator Plan & Schedule Chris Booth 2nd March 2009
Spokesman's update.
Muon Ionisation Cooling Experiment Overview
MICE Target Report Video Conference 29/11/07
المدخل إلى تكنولوجيا التعليم في ضوء الاتجاهات الحديثة
The Detector System of the MICE Experiment
The 9th Collaboration Meeting
3 Week A: May 1 – 19 3 Week B: May 22 – June 9
Goal Setting Life skills continued.
Presentation transcript:

K. Long, 16 June, 2015 MICE Muon Beam

Beam line and decay solenoid: Pressure reducing valves: Fitted to Q7—9; To be fitted to Q4—6 Upstream MLI: Plan to fit as presented at review; Cool down scheduled to take place over Easter: Clear instructions to baby sitters: Shutdown and make safe if there are issues that can not be resolved without presence of expert Volunteers required! LC has plan (see later), but manpower is short (usual ‘suspects’!)

Target: Production of jugs etc. has started: Welding and grinding jigs: RAL Production of parts has started: Bearing blanks: IC Test welding/test grinding: Hope for: Welding this week; Send to grinders next week