Martin von der Mey, EMU at CMU, October 20031 ALCT and TMB Status Martin von der Mey University of California Los Angeles ALCT production statusALCT production.

Slides:



Advertisements
Similar presentations
CPT Week, Nov 2003, B. Paul Padley, Rice University1 CSC Trigger Status, MPC and Sorter B. Paul Padley Rice University November 2003.
Advertisements

CMS Week Sept 2002 HCAL Data Concentrator Status Report for RUWG and Calibration WG Eric Hazen, Jim Rohlf, Shouxiang Wu Boston University.
TMB-RAT Software Update USCMS Slice Test Rice University August 16, 2004 Martin Von der Mey / Yangheng Zheng* University of California, Los.
Endcap Muon meeting: Florida, January 9-10, 2004 J. Hauser UCLA 1 TMB, RAT, and ALCT Status Report Jay Hauser University of California Los Angeles ALCT/Mezzanine.
TMB and RAT Status Report Endcap Muon OSU April 16, 2004 Yangheng Zheng University of California, Los Angeles  TMB Status  RAT Status.
CSC Muon Trigger September 16, 2003 CMS Annual Review 1 Current Status of CSC Trigger Elements – Quick Summary Jay Hauser, with many slides from Darin.
Endcap Muon meeting: UC Davis, Feb , 2005 J. Hauser UCLA 1 TMB and RAT Status Report Outline: Current status of TMB and RAT boards Noise measurements.
RPC Electronics Status Overall system TDC –Digitizing frequency issue (determine the bin size of the TDC value) Discriminator test result Trigger module.
Endcap Muon meeting: FNAL, Oct , 2004 J. Hauser UCLA 1 TMB and RAT Status Report Jay Hauser University of California Los Angeles.
TMB and RAT Status Report Endcap Muon OSU June 6, 2004 Martin von der Mey University of California, Los Angeles  Previous Status (OSU, April)
Time Division Multiplexing School of Physics and Astronomy Department of Particle Physics Elissavet Papadima 29/5/2014.
Low Cost TDC Using FPGA Logic Cell Delay Jinyuan Wu, Z. Shi For CKM Collaboration Jan
PPIB and ODMB Status Report Rice University April 19, 2013.
CMS Emu Meeting, Dec. 6, Electronics Long Term Operations What we learned from Electronics Commissioning G. Rakness U.C.L.A. Dec 6, 2008.
GBT Interface Card for a Linux Computer Carson Teale 1.
David Cussans/Scott Mandry, NIKHEF, October 2008 TLU v0.2.
Gregory PawloskiAugust 22, 2002 MPC Testing Progress.
Status of the CSC Track-Finder Darin Acosta University of Florida.
LNL 1 SLOW CONTROLS FOR CMS DRIFT TUBE CHAMBERS M. Bellato, L. Castellani INFN Sezione di Padova.
HBD FEM the block diagram preamp – FEM cable Status Stuffs need to be decided….
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
HBD FEM Overall block diagram Individual building blocks Outlook ¼ detector build.
CSC Endcap Muon Port Card and Muon Sorter Upgrade Status May 2013.
CPT Week, April 2001Darin Acosta1 Status of the Next Generation CSC Track-Finder D.Acosta University of Florida.
Global Trigger H. Bergauer, Ch. Deldicque, J. Erö, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H.
Hardware proposal for the L2  trigger system detailed description of the architecture mechanical considerations components consideration electro-magnetic.
UCLA Group Meeting May 01, 2014 Andrew Peck Shayan Rastegari 1 Updates from Lab Andrew Peck & Shayan Rastegari May 01, 2014.
CSC EMU/Track Finder Clock and Control Board (CCB’2004) Status Plans M.Matveev Rice University August 27, 2004.
Upgrade of the CSC Endcap Muon Port Card Mikhail Matveev Rice University 1 November 2011.
CSC Endcap Muon Port Card and Muon Sorter Status Mikhail Matveev Rice University.
CSC ME1/1 Upgrade Status of Electronics Design Mikhail Matveev Rice University March 28, 2012.
T.Y. Ling EMU Meeting CERN, September 20, 2005 Status Summary Off-Chamber Electronics.
SP04 Production Lev Uvarov RICE Muon Trigger Meeting August 27, 2004.
CSC Muon Sorter M. Matveev Rice University January 7, 2003.
US CMS DOE/NSF Review: June 2002, B.Paul Padley, Rice University1 CSC Muon Trigger On Detector Components B. Paul Padley Rice University June, 2002.
DAQMB Status – Onward to Production! S. Durkin, J. Gu, B. Bylsma, J. Gilmore,T.Y. Ling DAQ Motherboard (DMB) Initiates FE digitization and readout Receives.
1 SysCore for N-XYTER Status Report Talk by Dirk Gottschalk Kirchhoff Institut für Physik Universität Heidelberg.
Upgrade of the CSC Endcap Muon Port Card with Spartan-6 FPGA Mikhail Matveev Rice University 30 April 2012.
S. Durkin, CMS EMU Meeting U.C. Davis Feb. 25, DMB Production 8-layer PC Board, 2 Ball-Grid Array FPGA’s, 718 Components/Board 550 Production Boards.
Andrew Peck 1 CSC OTMB Firmware Meeting February 21, 2014 ALCT/TMB/RAT Test Stand at CERN Setting up complete duplicate of the ALCT-TMB-RAT test stand.
M.Matveev Rice University March 20, 2002 EMU Muon Port Card Project.
CSC Ops/DPG meeting, 05-Oct-2011 Hauser1 ALCT boards for ME4/2 etc.
E. Hazen - DTC1 DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University.
OTMB Development and Upgrade Plan for LS2
CSC Hardware Upgrade Status
IAPP - FTK workshop – Pisa march, 2013
Update on CSC Endcap Muon Port Card
CSC EMU Muon Port Card (MPC)
University of California Los Angeles
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF
University of California Los Angeles
University of California, Los Angeles Endcap Muon Purdue
CMS EMU TRIGGER ELECTRONICS
University of California Los Angeles
ALCT Production, Cable Tests, and TMB Status
University of California Los Angeles
University of California Los Angeles
Current Status of CSC Trigger Elements – Quick Summary
CSC Trigger Update Specific issues:
8-layer PC Board, 2 Ball-Grid Array FPGA’s, 718 Components/Board
ALCT, TMB Status, Peripheral Crate Layout, CSC Event Display
TMB, RAT, and ALCT Status Report
CSC Trigger Muon Port Card & Sector Processor in production
University of California Los Angeles
University of California Los Angeles
TMB and RAT Status Report
Effect of an ALCT SEU Much-overlooked good stuff
University of California Los Angeles
CSC Muon Sorter Status Tests Plans M.Matveev August 21, 2003.
CSC Electronics Problem Report CSCE I&C
Presentation transcript:

Martin von der Mey, EMU at CMU, October ALCT and TMB Status Martin von der Mey University of California Los Angeles ALCT production statusALCT production status TMB statusTMB status TMB radiation testTMB radiation test RAT statusRAT status

Martin von der Mey, EMU at CMU, October ALCT384 Boards Analog section: test pulse generator, AFEB power, ADCs, DACs (other side) 24 Input signal connectors Delay/ buffer ASICs, 2:1 bus multiplexors (other side) 80 MHz SCSI outputs (to Trigger Motherboard (to Trigger Motherboard) Power, computer connectors Xilinx Mezz. board Spartan XL

Martin von der Mey, EMU at CMU, October Yangheng

Martin von der Mey, EMU at CMU, October ALCT Production

Martin von der Mey, EMU at CMU, October ALCT Production

Martin von der Mey, EMU at CMU, October ALCT Production

Martin von der Mey, EMU at CMU, October ALCT Production Testing Done. Done. All ALCT base boards repaired. Also spares. All ALCT base boards repaired. Also spares. Prepare mezz. Cards spares Prepare mezz. Cards spares

Martin von der Mey, EMU at CMU, October Problems Encountered in testing at UCLA Most frequent problemMost frequent problem On base boards:On base boards: Intermittent problem due to buffer (Clock fanout). Buffers replacedIntermittent problem due to buffer (Clock fanout). Buffers replaced Still solder bridges (50%)Still solder bridges (50%) Shorts inside the PCB board.Shorts inside the PCB board. On mezz. Cards:On mezz. Cards: Bad Eproms (replaced)Bad Eproms (replaced) Bad ball grid connections between FPGA and PCB board.Bad ball grid connections between FPGA and PCB board.

Martin von der Mey, EMU at CMU, October Production of spare Mezz. Boards Want >10 % spares.Want >10 % spares. Need 25 XCV600E type and 15 XCV1000E type.Need 25 XCV600E type and 15 XCV1000E type. Have 3 good XCV600E and 1 good XVC1000EHave 3 good XCV600E and 1 good XVC1000E Have 24 bad XCV600E and 10 bad XCV1000EHave 24 bad XCV600E and 10 bad XCV1000E Already reballed about 100 mezz. Cards and remounted on same boards (success rate 70%).Already reballed about 100 mezz. Cards and remounted on same boards (success rate 70%). Plan :Plan : Remove FPGAs from non working boards and put on new mezz. card.Remove FPGAs from non working boards and put on new mezz. card. Buy 5-10 XCV1000EsBuy 5-10 XCV1000Es

Martin von der Mey, EMU at CMU, October Problems Encountered Broken AFEB connectors. Connectors are very fragile Shipping companies handle packages roughly We recently started packing very carefully We found a company that successfully replaces the broken connectors ($30/connector) Everybody should handle boards with care

Martin von der Mey, EMU at CMU, October Problems found (FAST) In shipping, connector shells got damaged (boxes handled roughly by FedEx) Very difficult to repair, found a company to do it Bottom line: First 100 chambers tested at ISR: 5 broken connector shells, 1 blown fuse, 1 bad channel… 1/38400 channels

Martin von der Mey, EMU at CMU, October RAT: Rpc Alct Transition module Inputs from ALCT and RPC sources Outputs through backplane to TMB. The RPC crate locations is now fixed and cabling can be discussed in detail The layout is done and submitted for board production. We expect to do a data interchange test with RPC in Spring.

Martin von der Mey, EMU at CMU, October RAT2003 Layout VME Backplane RPC connectors To TMB ALCT Input connector Spartan FPGA

Martin von der Mey, EMU at CMU, October Trigger Motherboard (TMB) Inputconnectors From ALCT Main FPGA (on back) XILINX XCV1000E Mezzanine board Inputconnectors From 5 CFEB’s Generates Cathode LCT trigger with input from CFEB (comparator) Generates Cathode LCT trigger with input from CFEB (comparator) Matches ALCT and CLCT; sends trigger primitive info via MPC to Lev-1 muon trigger, sends anode and cathode hits to DMB. Matches ALCT and CLCT; sends trigger primitive info via MPC to Lev-1 muon trigger, sends anode and cathode hits to DMB.

Martin von der Mey, EMU at CMU, October New TMB2003A New TMB2003A under testNew TMB2003A under test

Martin von der Mey, EMU at CMU, October TMB 2003A Status 4 TMB2003A boards assembled 4 TMB2003A boards assembled 2 Virtex-II Mezzanine boards assembled (Xilinx XC2V4000) 2 Virtex-II Mezzanine boards assembled (Xilinx XC2V4000) 2 Board (mostly) debugged 2 Board (mostly) debugged Board-test firmware ported from TMB2001 version. Board-test firmware ported from TMB2001 version. Beam-test firmware was modified for radiation test. Beam-test firmware was modified for radiation test. Radiation test done. Radiation test done.

Martin von der Mey, EMU at CMU, October Changes TMB2001/TMB2003A Changes from TMB2001 to TMB2003A 2 PHOS4 delay ASICs replaced with 3 DataDelay Devices 3D3444(10 channels with 1-ns steps replaced with 12 channels of 2ns steps) Power supply regulators replaced with OSU-approved rad tolerant devices New signals for XC2V4000 FPGA Virtex E mezz. Card replaced by Virtex II for faster speed New RPC signals to the RAT2003 transition module New voltage regulator for RAT2003 FPGA core (+1.8V) New signals to/from DMB. Accommodate backplane changes. New power plane layout Front-panel LEDs are now socketed, for faster assembly

Martin von der Mey, EMU at CMU, October Beam Test of TMB 2001   See Jay’s talk

Martin von der Mey, EMU at CMU, October TMB 2003A Hardware What works: JTAG chain sees Mezzanine FPGA + 4 PROMs, + 2 user PROMs Boot register passes walking 1 Address register passes walking 1 JTAG load command works (didn’t on TMB2001) Front panel cylon display runs VME registers read back ID, slot address, etc ADC reads back voltages and currents What doesn’t work: Some tri-state buffer outputs clamp to ~1V instead of pulling to 3.3V Test code can drive out +3.3V....it just won’t tri-state Tried Foundation and ISE compilers

Martin von der Mey, EMU at CMU, October TMB2003A Board Test Firmware Assembled 2 nd TMB2003 FPGA failed to load from EPROMs....fixed....bad solder on mez IC Delay ICs 3D3444 now working...firmware fix Trying to run full-auto tests Passes:ID register (includes VME slot address readback) VME data walking 1 VME address walking 1 Hard reset from VME User PROM JTAG ID codes User PROM data bus ADC voltage & current Fails:Digital serial numbers (both TMB and mez) SMB temperature IC All Loop-backs

Martin von der Mey, EMU at CMU, October TMB Firmware Firmware tested in 3 beam tests No big problems found Found and fixed problems with “Winner bits” New I/Os added (RPC,DMB) Added global clocks Replaced PHOS4 logic with 3D3444 (State machine clocks data at 20MHz instead of 625 kHz) Radiation test and beam test firmware ported to Virtex II.

Martin von der Mey, EMU at CMU, October New radiation Test

Martin von der Mey, EMU at CMU, October TMB2003A Test Radiation Test New state machine fires internal CLCT pattern injector Injects 1 muon: 6 hits, non-bending Trigger rate: 100KHz or ~10Hz Increments CFEB number each trigger Checks for correct CLCT data Checks for any CLCT data between triggers (spurious muon) Check power-monitor IC for +5V,+3.3V,+1.5V, +1.8V errors Flashes “running” LED at constant rate Test board: Connects to DMB TTL backplane drivers BiColor LEDs display test results Reset button forces FPGA reload (uses power-up IC on TMB)

Martin von der Mey, EMU at CMU, October Old ALCT radiation results Xilinx vs Altera Radiation results shows small improvements to before… Mean lies at Rad compared to 59.2 Rad before… The main improvement (factor 5) comes due to combination of 5 chips (1 concentrator and 4 LCT chips into 1).

Martin von der Mey, EMU at CMU, October Radiation Test results Irradiated XC2V4000 Xilinx FPGA New radiation test gives 141 Rad for proton beam. Compared to 65 Rad before. (~2.5 better) SEU proton fluence 79.8*10 7 cm -2 (M.Huhtinen (1-4)*10 10 cm -2 for 10 LHC years) Also tested 6 GTLP chips up to 5 kRads  no problems.

Martin von der Mey, EMU at CMU, October Conclusions ALCT production in excellent shape and mainly done. Doing spares now.ALCT production in excellent shape and mainly done. Doing spares now. TMB firmware in good shape. Tested several times. Improvements on the way.TMB firmware in good shape. Tested several times. Improvements on the way. Received and testing TMB 2003A.Received and testing TMB 2003A. Done TMB radiation test. Excellent.Done TMB radiation test. Excellent. RAT2003 layout finished.RAT2003 layout finished.