The EU DataGrid - Introduction The European DataGrid Project Team

Slides:



Advertisements
Similar presentations
CERN STAR TAP June 2001 Status of the EU DataGrid Project Fabrizio Gagliardi CERN EU-DataGrid Project Leader June 2001
Advertisements

An open source approach for grids Bob Jones CERN EU DataGrid Project Deputy Project Leader EU EGEE Designated Technical Director
Andrew McNab - Manchester HEP - 22 April 2002 EU DataGrid Testbed EU DataGrid Software releases Testbed 1 Job Lifecycle Authorisation at your site More.
Data Management Expert Panel - WP2. WP2 Overview.
Andrew McNab - Manchester HEP - 2 May 2002 Testbed and Authorisation EU DataGrid Testbed 1 Job Lifecycle Software releases Authorisation at your site Grid/Web.
FP7-INFRA Enabling Grids for E-sciencE EGEE Induction Grid training for users, Institute of Physics Belgrade, Serbia Sep. 19, 2008.
Plateforme de Calcul pour les Sciences du Vivant SRB & gLite V. Breton.
High Performance Computing Course Notes Grid Computing.
CERN The European DataGrid Project Technical status Bob Jones (CERN) Deputy Project Leader.
DataGrid is a project funded by the European Union 22 September 2003 – n° 1 EDG WP4 Fabric Management: Fabric Monitoring and Fault Tolerance
A conceptual model of grid resources and services Authors: Sergio Andreozzi Massimo Sgaravatto Cristina Vistoli Presenter: Sergio Andreozzi INFN-CNAF Bologna.
1 Software & Grid Middleware for Tier 2 Centers Rob Gardner Indiana University DOE/NSF Review of U.S. ATLAS and CMS Computing Projects Brookhaven National.
Cracow Grid Workshop, November 5-6, 2001 Towards the CrossGrid Architecture Marian Bubak, Marek Garbacz, Maciej Malawski, and Katarzyna Zając.
European DataGrid Project status and plans Peter Kunszt, CERN DataGrid, WP2 Manager
Workload Management Workpackage Massimo Sgaravatto INFN Padova.
DataGrid Kimmo Soikkeli Ilkka Sormunen. What is DataGrid? DataGrid is a project that aims to enable access to geographically distributed computing power.
Workload Management Massimo Sgaravatto INFN Padova.
EC Review – 01/03/2002 – G. Zaquine – Quality Assurance – WP12 – CS-SI – n° 1 DataGrid Quality Assurance Gabriel Zaquine Quality Engineer - WP12 – CS-SI.
QCDgrid Technology James Perry, George Beckett, Lorna Smith EPCC, The University Of Edinburgh.
The EDG Testbed Deployment Details The European DataGrid Project
5 November 2001F Harris GridPP Edinburgh 1 WP8 status for validating Testbed1 and middleware F Harris(LHCb/Oxford)
Andrew McNab - Manchester HEP - 5 July 2001 WP6/Testbed Status Status by partner –CNRS, Czech R., INFN, NIKHEF, NorduGrid, LIP, Russia, UK Security Integration.
Grid Projects: EU DataGrid and LHC Computing Grid Oxana Smirnova Lund University October 29, 2003, Košice.
INFSO-RI Enabling Grids for E-sciencE SA1: Cookbook (DSA1.7) Ian Bird CERN 18 January 2006.
LCG and HEPiX Ian Bird LCG Project - CERN HEPiX - FNAL 25-Oct-2002.
Grid Workload Management & Condor Massimo Sgaravatto INFN Padova.
Partner Logo DataGRID WP4 - Fabric Management Status HEPiX 2002, Catania / IT, , Jan Iven Role and.
Grid Technologies  Slide text. What is Grid?  The World Wide Web provides seamless access to information that is stored in many millions of different.
DataGrid WP1 Massimo Sgaravatto INFN Padova. WP1 (Grid Workload Management) Objective of the first DataGrid workpackage is (according to the project "Technical.
A monitoring tool for a GRID operation center Sergio Andreozzi (INFN CNAF), Sergio Fantinel (INFN Padova), David Rebatto (INFN Milano), Gennaro Tortone.
The European DataGrid Project Team The EU DataGrid.
Author - Title- Date - n° 1 Partner Logo EU DataGrid, Work Package 5 The Storage Element.
Author - Title- Date - n° 1 Partner Logo WP5 Summary Paris John Gordon WP5 6th March 2002.
June 24-25, 2008 Regional Grid Training, University of Belgrade, Serbia Introduction to gLite gLite Basic Services Antun Balaž SCL, Institute of Physics.
The Grid approach for the HEP computing problem Massimo Sgaravatto INFN Padova
DataGRID WPMM, Geneve, 17th June 2002 Testbed Software Test Group work status for 1.2 release Andrea Formica on behalf of Test Group.
JRA Execution Plan 13 January JRA1 Execution Plan Frédéric Hemmer EGEE Middleware Manager EGEE is proposed as a project funded by the European.
CLRC and the European DataGrid Middleware Information and Monitoring Services The current information service is built on the hierarchical database OpenLDAP.
What is SAM-Grid? Job Handling Data Handling Monitoring and Information.
The European DataGrid Project Fabrizio Gagliardi EU DataGrid Project Leader CERN
May http://cern.ch/hep-proj-grid-fabric1 EU DataGrid WP4 Large-Scale Cluster Computing Workshop FNAL, May Olof Bärring, CERN.
GRID Overview Internet2 Member Meeting Spring 2003 Sandra Redman Information Technology and Systems Center and Information Technology Research Center National.
DataGRID PTB, Geneve, 10 April 2002 Testbed Software Test Plan Status Laurent Bobelin on behalf of Test Group.
Introduction to GRID computing and overview of the European Data Grid The European DataGrid Project
6/23/2005 R. GARDNER OSG Baseline Services 1 OSG Baseline Services In my talk I’d like to discuss two questions:  What capabilities are we aiming for.
The EU DataGrid The European DataGrid Project Team
29/1/2002A.Ghiselli, INFN-CNAF1 DataTAG / WP4 meeting Cern, 29 January 2002 Agenda  start at  Project introduction, Olivier Martin  WP4 introduction,
1 P.Kunszt Openlab Lessons learned from Data Management in the EU DataGrid Peter Kunszt CERN IT/DB EU DataGrid Data Management
FP6−2004−Infrastructures−6-SSA E-infrastructure shared between Europe and Latin America gLite Information System Claudio Cherubino.
GRID ANATOMY Advanced Computing Concepts – Dr. Emmanuel Pilli.
David Foster LCG Project 12-March-02 Fabric Automation The Challenge of LHC Scale Fabrics LHC Computing Grid Workshop David Foster 12 th March 2002.
EGEE Project Review Fabrizio Gagliardi EDG-7 30 September 2003 EGEE is proposed as a project funded by the European Union under contract IST
DataGrid is a project funded by the European Commission under contract IST rd EU Review – 19-20/02/2004 The EU DataGrid Project Three years.
Gennaro Tortone, Sergio Fantinel – Bologna, LCG-EDT Monitoring Service DataTAG WP4 Monitoring Group DataTAG WP4 meeting Bologna –
WP1 Status and plans Francesco Prelz, Massimo Sgaravatto 4 th EDG Project Conference Paris, March 6 th, 2002.
All-sky search for continuous gravitational waves: tests in a grid environment Cristiano Palomba INFN Roma1 Plan of the talk: Computational issues Computing.
Bob Jones – Project Architecture - 1 March n° 1 Project Architecture, Middleware and Delivery Schedule Bob Jones Technical Coordinator, WP12, CERN.
9-Jul-02D.P.Kelsey, DataGrid Security1 EU DataGrid Security 9 July 2002 UK Security Task Force Meeting #2 David Kelsey CLRC/RAL, UK
The EPIKH Project (Exchange Programme to advance e-Infrastructure Know-How) gLite Grid Introduction Salma Saber Electronic.
J Jensen / WP5 /RAL UCL 4/5 March 2004 GridPP / DataGrid wrap-up Mass Storage Management J Jensen
Bob Jones EGEE Technical Director
Workload Management Workpackage
The European DataGrid Project
Regional Operations Centres Core infrastructure Centres
The EDG Testbed Deployment Details
General Project Manager
Sergio Fantinel, INFN LNL/PD
Wide Area Workload Management Work Package DATAGRID project
Information Services Claudio Cherubino INFN Catania Bologna
Presentation transcript:

The EU DataGrid - Introduction The European DataGrid Project Team

The EDG Intro– Tutorial - n° 2 Contents  The EDG Project scope  Achievements  EDG structure  Middleware Workpackages: Goals, Achievements, Issues  Testbed Release Plans

The EDG Intro– Tutorial - n° 3 Glossary  RBResource Broker  VOVirtual Organisation  CE Computing Element  SE Storage Element  GDMP GRID Data Mirroring Package  LDAP Lightweighted Directory Access Protocol  LCFG Local Configuration System  LRMS Local Resource management system (Batch) (PBS, LSF)  WMSWorkload Management System  LFNLogical File Name (like MyMu.dat)  SFNSite File Name ( like storageEl1.cern.ch:/home/data/MyMu.dat )

The EDG Intro– Tutorial - n° 4 The Grid vision  Flexible, secure, coordinated resource sharing among dynamic collections of individuals, institutions, and resource n From “The Anatomy of the Grid: Enabling Scalable Virtual Organizations”  Enable communities (“virtual organizations”) to share geographically distributed resources as they pursue common goals -- assuming the absence of… n central location, n central control, n omniscience, n existing trust relationships.

The EDG Intro– Tutorial - n° 5 Grids: Elements of the Problem  Resource sharing n Computers, storage, sensors, networks, … n Sharing always conditional: issues of trust, policy, negotiation, payment, …  Coordinated problem solving n Beyond client-server: distributed data analysis, computation, collaboration, …  Dynamic, multi-institutional virtual orgs n Community overlays on classic org structures n Large or small, static or dynamic

The EDG Intro– Tutorial - n° 6 EDG overview : goals  DataGrid is a project funded by European Union whose objective is to exploit and build the next generation computing infrastructure providing intensive computation and analysis of shared large-scale databases.  Enable data intensive sciences by providing world wide Grid test beds to large distributed scientific organisations ( “Virtual Organisations, Vos”)  Start ( Kick off ) : Jan 1, 2001 End : Dec 31, 2003  Applications/End Users Communities : HEP, Earth Observation, Biology  Specific Project Objetives: n Middleware for fabric & grid management n Large scale testbed n Production quality demonstrations n Collaborate and coordinate with other projects (Globus, Condor, CrossGrid, DataTAG, etc) n Contribute to Open Standards and international bodies ( GGF, Industry&Research forum)

The EDG Intro– Tutorial - n° 7 DataGrid Main Partners  CERN – International (Switzerland/France)  CNRS - France  ESA/ESRIN – International (Italy)  INFN - Italy  NIKHEF – The Netherlands  PPARC - UK

The EDG Intro– Tutorial - n° 8 Research and Academic Institutes CESNET (Czech Republic) Commissariat à l'énergie atomique (CEA) – France Computer and Automation Research Institute, Hungarian Academy of Sciences (MTA SZTAKI) Consiglio Nazionale delle Ricerche (Italy) Helsinki Institute of Physics – Finland Institut de Fisica d'Altes Energies (IFAE) - Spain Istituto Trentino di Cultura (IRST) – Italy Konrad-Zuse-Zentrum für Informationstechnik Berlin - Germany Royal Netherlands Meteorological Institute (KNMI) Ruprecht-Karls-Universität Heidelberg - Germany Stichting Academisch Rekencentrum Amsterdam (SARA) – Netherlands Swedish Research Council - Sweden Assistant Partners Industrial Partners Datamat (Italy) IBM-UK (UK) CS-SI (France)

The EDG Intro– Tutorial - n° 9 Project Schedule  Project started on 1/Jan/2001  TestBed 0 (early 2001) n International test bed 0 infrastructure deployed s Globus 1 only - no EDG middleware  TestBed 1 ( now ) n First release of EU DataGrid software to defined users within the project: s HEP experiments (WP 8), Earth Observation (WP 9), Biomedical applications (WP 10)  Successful Project Review by EU: March 1 st 2002  TestBed 2 (October 2002) n Builds on TestBed 1 to extend facilities of DataGrid  TestBed 3 (March 2003) & 4 (September 2003)  Project stops on 31/Dec/2003

The EDG Intro– Tutorial - n° 10 EDG Highlights  The project is up and running! n All 21 partners are now contributing at contractual level n total of ~60 man years for first year  All EU deliverables (40, >2000 pages) submitted n in time for the review according to the contract technical annex  First test bed delivered with real production demos  All deliverables (code & documents) available via n n requirements, surveys, architecture, design, procedures, testbed analysis etc.

The EDG Intro– Tutorial - n° 11 DataGrid work packages  The EDG collaboration is structured in 12 Work Packages n WP1: Work Load Management System n WP2: Data Management n WP3: Grid Monitoring / Grid Information Systems n WP4: Fabric Management n WP5: Storage Element n WP6: Testbed and demonstrators – Production quality International Infrastructure n WP7: Network Monitoring n WP8: High Energy Physics Applications n WP9: Earth Observation n WP10: Biology n WP11: Dissemination n WP12: Management

The EDG Intro– Tutorial - n° 12 Objectives for the first year of the project  Collect requirements for middleware n Take into account requirements from application groups  Survey current technology n For all middleware  Core Services testbed n Testbed 0: Globus (no EDG middleware)  First Grid testbed release n Testbed 1: first release of EDG middleware  WP1: workload n Job resource specification & scheduling  WP2: data management n Data access, migration & replication  WP3: grid monitoring services n Monitoring infrastructure, directories & presentation tools  WP4: fabric management n Framework for fabric configuration management & automatic sw installation  WP5: mass storage management n Common interface for Mass Storage Sys.  WP7: network services n Network services and monitoring

The EDG Intro– Tutorial - n° 13 DataGrid Architecture Collective Services Information & Monitoring Replica Manager Grid Scheduler Local Application Local Database Underlying Grid Services Computing Element Services Authorization Authentication and Accounting Replica Catalog Storage Element Services SQL Database Services Fabric services Configuration Management Configuration Management Node Installation & Management Node Installation & Management Monitoring and Fault Tolerance Monitoring and Fault Tolerance Resource Management Fabric Storage Management Fabric Storage Management Grid Fabric Local Computing Grid Grid Application Layer Data Management Job Management Metadata Management Object to File Mapping Logging & Book- keeping

The EDG Intro– Tutorial - n° 14 EDG Interfaces Collective Services Information & Monitoring Replica Manager Grid Scheduler Local Application Local Database Underlying Grid Services Computing Element Services Authorization Authentication and Accounting Replica Catalog Storage Element Services SQL Database Services Fabric services Configuration Management Configuration Management Node Installation & Management Node Installation & Management Monitoring and Fault Tolerance Monitoring and Fault Tolerance Resource Management Fabric Storage Management Fabric Storage Management Grid Application Layer Data Management Job Management Metadata Management Object to File Mapping Logging & Book- keeping Computing Elements SystemManagers Scientist s OperatingSystems File Systems StorageElements Mass Storage Systems HPSS, Castor User Accounts Certificate Authorities ApplicationDevelopers Batch Systems PBS, LSF

The EDG Intro– Tutorial - n° 15 WP1: Work Load Management  Goals n Maximize use of resources by efficient scheduling of user jobs  Achievements n Analysis of work-load management system requirements & survey of existing mature implementations Globus & Condor (D1.1) n Definition of architecture for scheduling & res. mgmt. (D1.2) n Development of "super scheduling" component using application data and computing elements requirements  Issues n Integration with software from other WPs n Advanced job submission facilities Current components Job Description Language Resource Broker Job Submission Service Information Index User Interface Logging & Bookkeeping Service Collective Services Information & Monitoring Replica Manager Grid Scheduler Local Application Local Database Underlying Grid Services Computing Element Services Authorization Authentication and Accounting Replica Catalog Storage Element Services SQL Database Services Fabric services Configuration Management Configuration Management Node Installation & Management Node Installation & Management Monitoring and Fault Tolerance Monitoring and Fault Tolerance Resource Management Fabric Storage Management Fabric Storage Management Grid Application Layer Data Management Job Management Metadata Management Object to File Mapping Logging & Bookkeeping

The EDG Intro– Tutorial - n° 16 WP2: Data Management  Goals n Coherently manage and share petabyte-scale information volumes in high-throughput production-quality grid environments  Achievements n Survey of existing tools and technologies for data access and mass storage systems (D2.1) n Definition of architecture for data management (D2.2) n Deployment of Grid Data Mirroring Package (GDMP) in testbed 1 n Close collaboration with Globus, PPDG/GriPhyN & Condor n Working with GGF on standards  Issues n Security: clear mechanisms handling authentication and authorization Current components GDMP Replica Catalog Replica Manager Spitfire Collective Services Information & Monitoring Replica Manager Grid Scheduler Local Application Local Database Underlying Grid Services Computing Element Services Authorization Authentication and Accounting Replica Catalog Storage Element Services SQL Database Services Fabric services Configuration Management Configuration Management Node Installation & Management Node Installation & Management Monitoring and Fault Tolerance Monitoring and Fault Tolerance Resource Management Fabric Storage Management Fabric Storage Management Grid Application Layer Data Management Job Management Metadata Management Object to File Mapping Logging & Bookkeeping

The EDG Intro– Tutorial - n° 17 WP3: Grid Monitoring Services  Goals n Provide information system for discovering resources and monitoring status  Achievements n Survey of current technologies (D3.1) n Coordination of schemas in testbed 1 n Development of Ftree caching backend based on OpenLDAP (Light Weight Directory Access Protocol) to address shortcoming in MDS v1 n Design of Relational Grid Monitoring Architecture (R-GMA) (D3.2) – to be further developed with GGF n GRM and PROVE adapted to grid environments to support end-user application monitoring  Issues n MDS vs. R-GMA Components MDS/Ftree R-GMA GRM/PROVE Collective Services Information & Monitoring Replica Manager Grid Scheduler Local Application Local Database Underlying Grid Services Computing Element Services Authorizat ion Authentication and Accounting Replica Catalog Storage Element Services SQL Database Services Fabric services Configuration Management Configuration Management Node Installation & Management Node Installation & Management Monitoring and Fault Tolerance Monitoring and Fault Tolerance Resource Management Fabric Storage Management Fabric Storage Management Grid Application Layer Data Management Job Management Metadata Management Object to File Mapping Logging & Book-keeping

The EDG Intro– Tutorial - n° 18 WP4: Fabric Management  Goals n manage clusters (~thousands) of nodes  Achievements n Survey of existing tools, techniques and protocols (D4.1) n Defined an agreed architecture for fabric management (D4.2) n Initial implementations deployed at several sites in testbed 1  Issues n How to ensure the node configurations are consistent and handle updates to the software suites Components LCFG PBS & LSF info providers Image installation Config. Cache Mgr Collective Services Information & Monitoring Replica Manager Grid Scheduler Local Application Local Database Underlying Grid Services Computing Element Services Authorization Authentication and Accounting Replica Catalog Storage Element Services SQL Database Services Fabric services Configuration Management Configuration Management Node Installation & Management Node Installation & Management Monitoring and Fault Tolerance Monitoring and Fault Tolerance Resource Management Fabric Storage Management Fabric Storage Management Grid Application Layer Data Management Job Management Metadata Management Object to File Mapping Logging & Book-keeping

The EDG Intro– Tutorial - n° 19 WP5: Mass Storage Management  Goals n Provide common user and data export/import interfaces to existing local mass storage systems  Achievements n Review of Grid data systems, tape and disk storage systems and local file systems (D5.1) n Definition of Architecture and Design for DataGrid Storage Element (D5.2) n Collaboration with Globus on GridFTP/RFIO n Collaboration with PPDG on control API n First attempt at exchanging Hierarchical Storage Manager (HSM) tapes  Issues n Scope and requirements for storage element n Inter-working with other Grids Components Storage Element info. providers RFIO MSS staging Collective Services Information & Monitoring Replica Manager Grid Scheduler Local Application Local Database Underlying Grid Services Computing Element Services Authorization Authentication and Accounting Replica Catalog Storage Element Services SQL Database Services Fabric services Configuration Management Configuration Management Node Installation & Management Node Installation & Management Monitoring and Fault Tolerance Monitoring and Fault Tolerance Resource Management Fabric Storage Management Fabric Storage Management Grid Application Layer Data Management Job Management Metadata Management Object to File Mapping Logging & Bookkeeping

The EDG Intro– Tutorial - n° 20 WP7: Network Services  Goals n Review the network service requirements for DataGrid n Establish and manage the DataGrid network facilities n Monitor the traffic and performance of the network n Deal with the distributed security aspects  Achievements n Analysis of network requirements for testbed 1 & study of available network physical infrastructure (D7.1) n Use of European backbone GEANT since Dec n Initial network monitoring architecture defined (D7.2) and first tools deployed in testbed 1 n Collaboration with Dante & DataTAG n Working with GGF (Grid High Performance Networks) & Globus (monitoring/MDS)  Issues n Resources for study of security issues n End-to-end performance for applications depend on a complex combination of components Components network monitoring tools: PingER Udpmon Iperf Collective Services Information & Monitoring Replica Manager Grid Scheduler Local Application Local Database Underlying Grid Services Computing Element Services Authorization Authentication and Accounting Replica Catalog Storage Element Services SQL Database Services Fabric services Configuration Management Configuration Management Node Installation & Management Node Installation & Management Monitoring and Fault Tolerance Monitoring and Fault Tolerance Resource Management Fabric Storage Management Fabric Storage Management Grid Application Layer Data Management Job Management Metadata Management Object to File Mapping Logging & Bookkeepgin

The EDG Intro– Tutorial - n° 21 WP6: TestBed Integration  Goals n Deploy testbeds for the end-to-end application experiments & demos n Integrate successive releases of the software components  Achievements n Integration of EDG sw release 1.0 and deployment n Working implementation of multiple Virtual Organisations (VOs) s & basic security infrastructure n Definition of acceptable usage contracts and creation of Certification Authorities group  Issues n Procedures for software integration n Test plan for software release n Support for production-style usage of the testbed Components Globus packaging & EDG config Build tools End-user documents Collective Services Information & Monitoring Replica Manager Grid Scheduler Local Application Local Database Underlying Grid Services Computing Element Services Authorization Authentication and Accounting Replica Catalog Storage Element Services SQL Database Services Fabric services Configuration Management Configuration Management Node Installation & Management Node Installation & Management Monitoring and Fault Tolerance Monitoring and Fault Tolerance Resource Management Fabric Storage Management Fabric Storage Management Grid Application Layer Data Management Job Management Metadata Management Object to File Mapping Logging & Bookkeeping WP6 additions to Globus GlobusEDG release

The EDG Intro– Tutorial - n° 22 Grid aspects covered by EDG testbed 1 VO servers LDAP directory for mapping users (with certificates) to correct VO Storage Element Grid-aware storage area, situated close to a CE User Interface Submit & monitor jobs, retrieve output Replica Manager Replicates data to one or more CEs Job Submission Service Manages submission of jobs to Res. Broker Replica Catalog Keeps track of multiple data files “replicated” on different CEs Information index Provides info about grid resources via GIIS/GRIS hierarchy Information & Monitoring Provides info on resource utilization & performance Resource Broker Uses Info Index to discover & select resources based on job requirements Grid Fabric Mgmt Configure, installs & maintains grid sw packages and environ. Logging and Bookkeeping Collects resource usage & job status Network performance, security and monitoring Provides efficient network transport, security & bandwidth monitoring Computing Element Gatekeeper to a grid computing resource Testbed admin. Certificate auth.,user reg., usage policy etc.

The EDG Intro– Tutorial - n° 23 Tasks for the WP6 integration team  Testing and integration of the Globus package  Exact definition of RPM lists (components) for the various testbed machine profiles (CE service, RB, UI, SE service, NE, WN, ) – check dependencies  Perform preliminary centrally (CERN) managed tests on EDG m/w before green light for spread EDG testbed sites deployment  Provide, update end user documentation for installers/site managers, developers and end users  Define EDG release policies, coordinate the integration team staff with the various WorkPackage managers – keep high inter-coordination.  Assign the reported bugs to the corresponding developers/site managers (BugZilla)  Complete support for the iTeam testing VO

The EDG Intro– Tutorial - n° 24 EDG overview: Middleware release schedule  Planned intermediate release schedule n Release 1.1: January 2002 n Release 1.2: March 2002 n Release 1.3: May 2002 n Release 1.4: July 2002  Similar schedule for 2003  Each release includes n feedback from use of previous release by application groups n planned improvements/extension by middle-ware WPs n use of WP6 software infrastructure n feeds into architecture group July Internal August

The EDG Intro– Tutorial - n° 25 Release Plan details  Current release EDG Deployed on testbed under RedHat 6.2  Finalising build of EDG 1.2 (now) GDMP 3.0 GSI-enabled RFIO client and server  EDG 1.3 (internal) Build using autobuild tools – to ease future porting Support for MPI on single site  EDG 1.4 (August) n Support RH 6.2 & 7.2 n Basic support for interactive jobs n Integration of Condor DAGman n Use MDS 2.2 with first GLUE schema  EDG 2.0 (Oct) n Still based on Globus 2.x (pre-OGSA) n Use updated GLUE schema n Job partitioning & check-pointing n Advanced reservation/co-allocation See for further detailshttp://edms.cern.ch/document/333297

The EDG Intro– Tutorial - n° 26 EDG overview : testbed schedule  Planned intermediate testbed schedule n Testbed 0: March 2001 n Testbed 1: November 2001-January 2002 n Testbed 2: September-October 2002 n Testbed 3: March 2003 n Testbed 4: September-October 2003  Number of EDG testbed sites permanently increasing : currently 9 sites are visible to the CERN resource broker  Each site normally implements, at least : n A central install & config server (LCFG server) n WMS (WP1) dedicated machines : UI, CE (g/k & worker node(s) ) n MDS Info Providers to the global EDG GIIS/GRIS n Network Monitoring

The EDG Intro– Tutorial - n° 27 Development & Production testbeds  Development n Initial set of 5 sites will keep small cluster of PCs for development purposes to test new versions of the software, configurations etc.  Production n More stable environment for use by application groups s more sites s more nodes per site (grow to meaningful size at major centres) s more users per VO n Usage already foreseen in Data Challenge schedules for LHC experiments s harmonize release schedules