US Test Beam Results Of Front End Timing T. Ferguson, N. Terentiev* (Carnegie Mellon University) CMS EMU Meeting University of California, Davis Feb 25.

Slides:



Advertisements
Similar presentations
24-Apr-15S.Movchan Straw prototype beam test into the NA48 infrastructure 1 Goals: test of straw prototype wires positioning straw bending check grounding.
Advertisements

27/02/2002M.D.P. - ATLAS Muon Week1 First results of Atlas RPC cosmic rays test Massimo Della Pietra Atlas RPC Group Napoli ( M. Alviggi, V. Canale, M.
US FAST site test results – a global view from ROOT T. Ferguson, A. Korytov, N. Terentiev* EMU Meeting University of Florida 01/09/2004.
US Beam Test Results and ORCA validation for CMS EMU CSC front-end electronics N. Terentiev Carnegie Mellon University CMS EMU Meeting, CERN June 18, 2005.
TMB-RAT Software Update USCMS Slice Test Rice University August 16, 2004 Martin Von der Mey / Yangheng Zheng* University of California, Los.
US Some Preliminary Test Beam Results T. Ferguson, N. Terentiev*, I. Vorobiev CMS EMU Meeting Fermilab Oct , 2004.
1 Timing in HCAL Digitization Rick Wilkinson. 2 Timing We should try to maximize charge in time bin 5, for high energy (no time slew) We should try to.
US CMS Collaboration Meeting, UC Riverside, May 19, Endcap Muons John Layter US CMS Collaboration Meeting May 19, 2001.
CSC Muon Trigger September 16, 2003 CMS Annual Review 1 Current Status of CSC Trigger Elements – Quick Summary Jay Hauser, with many slides from Darin.
CMS Physics Meeting, Dec. 6, Analysis Note on the Validation of the ORCA Simulation of the Endcap Muon CSC Front-end Electronics S. Durkin -- Ohio.
US FAST site EMU CSC test results – a global view from ROOT N. Terentiev (Carnegie Mellon University) Fermilab July 23, 2004.
Track Fitting and Comparator Results Emu UC Davis Feb. 26, 2005 Yangheng Zheng University of California, Los Angeles  Motivation & Introduction.
US FAST site test results – a global view from ROOT T. Ferguson, A. Korytov, N. Terentiev* EMU Meeting University of Florida 01/09/2004.
US Test beam data analysis & validation of OSCAR/ORCA Tim Cox, UC Davis Nikolai Terentiev*, CMU CMS Physics Week Fermilab Apr , 2005.
Commissioning of CSCs and Peripheral Crates Task L M. Ignatenko UCLA October
Endcap Muon meeting: CMU, Oct 19, 2003 J. Hauser UCLA 1 CSC Trigger Primitives Test Beam Studies Main Test Beam 2003 Goals: Verify the peripheral crate.
US FAST site test results – a global view from ROOT T. Ferguson, A. Korytov, N. Terentiev* CMS EMU Meeting The Ohio State University April 16 – 17, 2004.
US Beam Test Results and ORCA validation for CMS EMU CSC front-end electronics N. Terentiev Carnegie Mellon University CMS EMU Meeting, Fermilab October.
DRAFT version Oct. 15, 2004 Hauser/Mey UCLA 1 Analysis of Oct. 04 Test Beam RPC Data Jay Hauser, Martin von der Mey University of California Los Angeles.
1 ME 234/2 HV noise investigation N.Bondar CMU. 12/18/02.
US LPC Muon Group CMSSW code development efforts N. Terentiev Carnegie Mellon University CMS EMU Meeting, Florida Institute of Technology February 17-18,
Preliminary Results from Structured Beam Test CMS Trigger Meeting June 3, 2003 Brian Mohr UCLA Dept. of Physics.
US FAST site test results – a global view from ROOT T. Ferguson, A. Korytov, N. Terentiev* CMS EMU Meeting The Ohio State University April 16 – 17, 2004.
DRAFT version Oct. 15, 2004 Hauser/Mey UCLA 1 Analysis of Oct. 04 Test Beam RPC Data Jay Hauser, Martin von der Mey University of California Los Angeles.
US News from the LPC Muon Group E. James, M. Mulders, N. Terentiev* CMS EMU Meeting University of California, Davis Feb , 2005.
S. Durkin, USCMS-EMU Meeting, Oct. 21, 2005 Critical Data Errors S. Durkin The Ohio State University USCMS EMU Meeting, FNAL, Oct. 20, 2005.
Emulator System for OTMB Firmware Development for Post-LS1 and Beyond Aysen Tatarinov Texas A&M University US CMS Endcap Muon Collaboration Meeting October.
An Asynchronous Level-1 Tracking Trigger for Future LHC Detector Upgrades A. Madorsky, D. Acosta University of Florida/Physics, POB , Gainesville,
Printed by Topical Workshop on Electronics for Particle Physics TWEPP-08, Naxos, Greece / September 2008 MEZZANINE CARDS FOR.
Status of the CSC Track-Finder Darin Acosta University of Florida.
Track-Finder Trigger at the Beam Test Results and Features Darin Acosta, Rick Cavanaugh, Victor Golovtsov, Lindsey Gray, Khristian Kotov, Alex Madorsky,
CPT Week, April 2001Darin Acosta1 Status of the Next Generation CSC Track-Finder D.Acosta University of Florida.
RPC detection rate capability ≈ 1/ρ Float-Glass ( Ω-cm) RPC rate capability < Bakelite( Ω-cm) one. New kind of doped glass was developed.
Test Beam Wrap-Up Darin Acosta. Darin Acosta, University of Florida 18 June 2004 USCMS Meeting 2 Agenda n Darin/UF: General recap of runs taken, tests.
Motivation General rule for muon triggers: Never neglect a possible backup reduction factor. It will always come back to you. Even if RPC trigger works.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
4 Dec 2008G. Rakness (UCLA)1 Online Software Updates and RPC data in the RAT …including Pad Bit Mapping and Efficiency… Greg Rakness University of California,
Сессия Ученого Совета ОФВЭ 25 декабря 2008 Проект CMS в 2008 В.В.Сулимов.
CMS Latency Review, 13th March 2007CSC Trigger 1 Latency and Synchronization update.
Global Muon Trigger / RPC Interface Warsaw and Vienna Groups RPC Electronics System Review Warsaw, 8 July 2003 presented by Claudia-Elisabeth Wulz.
US CMS DOE/NSF Review: June 2002, B.Paul Padley, Rice University1 CSC Muon Trigger On Detector Components B. Paul Padley Rice University June, 2002.
Track-Finder Test Beam Results Darin Acosta. Darin Acosta, University of Florida 30 July 2004 Trigger Meeting CSC Beam Test (Muon Slice Test) ME.
Tridas Week, November 2000Darin Acosta1 Status of the CSC Track-Finder D.Acosta, A.Madorsky, S.M.Wang University of Florida B.Cousins, J.Hauser, J.Mumford,
10 th LECC Workshop, September 2004, Hauser et al.1 Experience with Trigger Electronics for the CSC System of CMS J. Hauser*, E. Boyd, R. Cousins,
1J. Gu CERN CSC Meeting July 2008 DAQMB/FEBs Readiness for First Beam Jianui Gu The Ohio State University.
22 Sept A slight reformulation of (ALCT) muonic timing… In terms of brass tacks.
Feb 24, Abnormal Events in HF: TB04, Simulation, and Feb.08 Fermi Testbeam Anthony Moeller (U. Iowa) Shuichi Kunori (U. Maryland) Taylan Yetkin (U.
US AFEB timing in CSCs in splash events, run N. Terentiev, CMU CSC Synchronization meeting Nov. 16, 2009, CERN.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, May, 2004 Trigger Report - 1 CSC on-detector peripheral crate SBS VME Controller Muon Port Card: Output.
US ALCT / AFEB Analog Test Results N.Bondar, T.Ferguson, N.Terentiev* EMU Meeting UCLA 01/10/2003.
CSC Ops/DPG meeting, 05-Oct-2011 Hauser1 ALCT boards for ME4/2 etc.
10/20/09 UCLA Meeting Hauser 1/9 Various updates Update on LHC/CMS schedule: First shots into collimator: Nov. 7 and 8! Circulating beam ~Nov. 18, less.
Effects of Endcap Staging/Descoping D.Acosta University of Florida.
CMS Week, 3-7 November CSC Trigger Test Beam Report Cast of many.
6 April 2007G. Rakness (UCLA) 1 CSC runs at minus side slice test 27 Mar – 5 Apr Color scheme: Successes Problems/questions Greg Rakness University.
Update on “Muonic Timing” of CSC Electronics
S.Movchan Straw prototype beam test into the NA48 infrastructure
Timing/Synchronization Status
CSC Synchronization Procedure and Plans
CMS EMU TRIGGER ELECTRONICS
Overview: Introduction to LHC Overview of CMS
Current Status of CSC Trigger Elements – Quick Summary
CSC Trigger Update Specific issues:
CSC Digi & RecHit Validation
CSC Trigger Primitives Test Beam Studies
Analysis of Oct. 04 Test Beam RPC Data
Changes in Level 1 CSC Trigger in ORCA by Jason Mumford and Slava Valuev University of California Los Angeles June 11,
The Ohio State University CSC Detector Performance Group
Pre-installation Tests of the LHCb Muon Chambers
Sector Processor Status Report
Presentation transcript:

US Test Beam Results Of Front End Timing T. Ferguson, N. Terentiev* (Carnegie Mellon University) CMS EMU Meeting University of California, Davis Feb , 2005

N. Terentiev (Carnegie Mellon University) CMS EMU Meeting University of California, Davis Feb 25-26, Outline Sep-Oct ‘04 beam test conditions CSC front-end timing Anode front-end timing Cathode comparators timing

N. Terentiev (Carnegie Mellon University) CMS EMU Meeting University of California, Davis Feb 25-26, Sep-Oct ’04 beam test conditions Beam Asynchronous (1.5 week) 25 ns structured beam (1 week) Setup features 5 CSCs, 3 RPCs, HCAL 4 peripheral crates New DDU/DCC TrackFinder crate (SP1+SP2) Trigger: SC (Scint. Counters), TF (Track Finder) Details and main results in EMU Oct 2004 talks by F.Geurts, D.Acosta, A.Korytov, M.Von der Mey, J.Hauser, S.Durkin

N. Terentiev (Carnegie Mellon University) CMS EMU Meeting University of California, Davis Feb 25-26, CSC front-end timing CSC synchronization – complicated and challenging procedure See details, plan and extensive discussion in the EMU Oct 2004 talk by J. Hauser AFEB timing in the 25 ns beam tests Scan 0-25 ns ALCT delays in 2.2 ns steps to get >99% ALCTs BX occupancy in one BX 25 ns time bin Set one and the same best delay for ALL AFEBs of given CSC (no individual settings) No AFEB nominal 20 fC threshold settings (ALCT DACthr = 20 setting gives Qthr = fC) AFEB individual delay and threshold settings will be done in future CSC synchronization

N. Terentiev (Carnegie Mellon University) CMS EMU Meeting University of California, Davis Feb 25-26, Anode front-end timing In most cases in the 25 ns beam test the ALCT BX one 25 ns bin efficiency was > 99% with no individual fine delay tuning done Hits are in a compact group of a few AFEBs for SC trigger (similar cable lengths) Delay chips in each given ALCT board have similar delay characteristics ALCT delay was set so that ALCT BX = 2 was the most likely In cases of the ALCT BX efficiency of ~ 95% (see Fig.) More peripheral AFEBs involved in TF trigger The ALCT BX one bin inefficiency is tracked down to AFEB/ALCT delay chips which need the fine delay tuning

N. Terentiev (Carnegie Mellon University) CMS EMU Meeting University of California, Davis Feb 25-26, Anode front-end timing (cont’d) ALCT BX efficiency vs AFEB location Choose events with one anode wire group hit and one cathode comparator hit in each layer of ME2/2 (Run 554, TF trigger) Look at single ALCT track events ALCT BX one bin efficiencies vs ALCT track location in layer 3, see Fig. (one AFEB serves 8+8 wire groups in 2 CSC layers, therefore 8 AFEB locations in one layer with 64 wire groups) ALCT delays for AFEBs in location 5 need tuning

N. Terentiev (Carnegie Mellon University) CMS EMU Meeting University of California, Davis Feb 25-26, Anode front-end timing (cont’d) AFEB one time bin occupancy Look at max. occupancy in time bin 5 (Bunch Crossing Number BXN=5) ALCT delays for AFEBs with wires 33–40 in layers 1 – 4 need fine tuning For ALCT delay tuning Find optimum delay for each AFEB using results of the ALCT delay scan Rescan ALCT delay with fewer 2.2 ns steps around delays with max. AFEB’s one time bin occupancy to confirm higher ALCT BX efficiency

N. Terentiev (Carnegie Mellon University) CMS EMU Meeting University of California, Davis Feb 25-26, Anode front-end timing (cont’d) AFEB time bin occupancy vs cathode signal amplitude (see Fig.) Single anode wire hit and single comparator hit per plane Look at normalized occupancies (time bins 4 - 6) vs cathode signal amplitude In general agrees with slewing time data from the AFEB test stand

N. Terentiev (Carnegie Mellon University) CMS EMU Meeting University of California, Davis Feb 25-26, Anode front-end timing (cont’d) 2D presentation of the anode time vs total cathode charge

N.Terentiev (Carnegie Mellon University) CMS EMU Meeting University of California, Davis Feb 25-26, Cathode comparators timing Cathode comparator time vs total cathode signal charge (see Fig.) Single anode hit and single comparator hit (Strip #42) Occupancy is normalized at each amplitude bin Comparator time is within three 25 ns time bins

N.Terentiev (Carnegie Mellon University) CMS EMU Meeting University of California, Davis Feb 25-26, Conclusion The beam test data confirm that: ALCT individual delay settings for AFEBs will improve ALCT BX efficiency (as expected) The AFEB one time bin occupancy to be used in the delay tuning. Future plans – continue analysis and compare the beam test data with ORCA simulation/digitization: Cathode signal amplitude vs time bin ORCA Muon tracking in the beam test data for all four CSC?