Global Magnet Systems including Field Mapping MICE Project Board 28 th June 2011 M Courthold – RAL R Preece - RAL.

Slides:



Advertisements
Similar presentations
1 UK Project Alan Grant, STFC. Finance How savings are made Update on stepIV position Milestones Critical Path - stepIV Concerns 2.
Advertisements

Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
1 MICE CM31 Key schedule drivers for Step IV Schedule table Milestone summary Comment on Step V Step VI Andy Nichols, STFC, 3/11/11.
Status of the AFC at RAL Tom Bradshaw John Cobb Wing Lau Matt Hills Elwyn Baynham Mike Courthold Victoria Bayliss MICE Project Board 28 th June 2011.
MICE Superconducting Solenoids: Status and Update RAL: T W Bradshaw M Courthold J Rochford M Hills D Baynham Oxford: J Cobb W Lau S Yang MICE.
SS and AFC Control Systems Brian Martlew 21 st Sept 2011.
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
MICE Collaboration meeting at CERN March 28 – April 1, 2004 MICE Cooling Channel --- AFC Module work group report Wing Lau – Oxford.
paul drumm; 3rd December 2004; AFC MM 1 Cost & Schedule Review I Terms of reference: –To review the Cost and schedule of the MICE Muon beam –To review.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
MICE Collaboration Meeting Harbin, China 13 – 17 January 2009 Integration Issues By Wing Lau, Oxford University.
Electrical Installation CM39 Andy Gallagher & Ian Mullacrane.
Spectrometer Solenoids and Coupling Coils Primary Activities and Risks Going Forward Spectrometer Solenoids Completion of SS#2 magnetic mapping Completion,
GlueX Solenoid Update George Biallas May 12, 2010 GlueX Collaboration Meeting.
Alan Grant OsC 30/4/ UK Project Finance & Schedule.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
UKNF/MICE PSAG, 3/5/11 Spectrometer solenoids: –Repair plan still ‘in approval’, already two months late –Workshop/mini review at LBNL 10 th /11 th May.
August 2 and 3, 2010 Project Cost, Schedule, Risk and Contingency Jay Elias.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
1 MICE PM Report Completion of Infrastructure Target, solenoids Phase Two planning & schedule Non-MICE costs Staffing & visitors Don’t have time for a.
Project manager report paul drumm CM16 October 2006.
MICE Integration Engineering Jason Tarrant - STFC l Contents »South Mezzanine change summary »Integration Envelope Model »A/C Move »Maus Geometry »AFC.
RSLR mtg 28/3/2014 RLSR mtg Alan Grant. 2 RLSR mtg 28/3/ MICE Finances - Forward Look.
The status of the construction of MICE Step IV K. Long, on behalf of the MICE collaboration.
Electrical Integration CM38 Steve Griffiths & Ian Mullacrane.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
October 4-5, Status of ARRA funded AIPs Electron Lens Scope, Cost, and Schedule Wolfram Fischer October 4, 2010 Electron Lens.
Global Magnet Systems including Field Mapping and Infrastructure Vacuum System MICE Project Board 8 th March 2012 M Courthold – RAL R Preece – RAL P Hanlet.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Spectrometer solenoid 2. Magnetic shielding 3. Next Collaboration meeting.
Technical Board and Safety Summary Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Spectrometer Solenoid: Plans to Fix Magnet 2 Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
Hydrogen Delivery System Schedule MICE Schedule Review 23 rd -25 th May 2011 M Hills STFC.
Spectrometer Solenoid Overview Roy Preece 31 st January 2011.
STEP 4 Manage Delivery. Role of Project Manager At this stage, you as a project manager should clearly understand why you are doing this project. Also.
1 Mice Collaboration Meeting CM28 Bankya Palace Spa Hotel, Sofia, Bulgaria 3 rd -8 th Oct 2010 Daresbury Laboratory Spectrometer Report Authors : Ian Mullacrane.
1 MICE PM report Target News Outcome of Spectrometer Solenoid Review New plans for Steps II & III RF Power news MICE CMPB, 4th December, 2009.
Project Managers Report CM40 Collaboration Board – Rome Roy Preece 28 th October 2014.
Spectrometer Solenoid Schedule MICE Schedule Review May 23 rd 2011 Roy Preece (STFC RAL, LBNL)
UK Update Package Managers Meeting 001 Roy Preece 13 th January 2014.
MPB 31 October 2012 and FAC 15 November monitor how well we are doing in assembling step IV ! -- should deliver a ‘realsitic schedule scenario’
MICE Oversight Committee Meeting RAL, 24 April 2014 Paul Soler on behalf of the MICE Collaboration Status of MICE and Spectrometer Solenoids.
MICE Coupling Coil Testing at Fermilab All Experimenters Meeting Ruben Carcagno March 19, R. Carcagno - MICE CC Testing at Fermilab3/19/2012.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
Pre-CM33 schedule planning SuperMICO meeting, June 6th Motivation: For all of us to understand the main drivers behind the top-level MICE schedule So that.
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
Muon Ionization Cooling Experiment Update 1Alan Bross AEM October 14, 2013.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
Status of the MICE Construction Project Resource Loaded Schedule Review 29 th April 2014 Roy Preece.
1 MICE CM27 Engineering integration Andy Nichols, STFC 9 th July, 2010.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
1 UK Project Roy Preece – STFC Alan Grant, STFC. Finance Staffing Update on stepIV position Milestones Critical Path – stepIV Magnetic field mitigation.
Tuesday 9 th January Project Status Report Project Achievements Project Schedule Issues Finance Summary Risk Register Photos.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
Schedule to completion, Risk and Critical Interfaces Roy Preece STFC RAL RLSR 16 th April 2015.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
1 UK Project Finance & Schedule. Overview Finance  Budget Setting 2013/14  June Finance  Forward look to complete stepVI Schedule  Overview 2.
MICE Spectrometer Solenoids Step IV running. MICE Spectrometer Solenoids Remember: Both magnets met the full specification at the vendor and were fully.
1 MICE CM25 Engineering Session Summary Contents: Infrastructure Diffuser Coupling Coils Radiation Shutter AFC module EMR Andy Nichols, STFC, 4-7 th November.
MICE Spectrometer Solenoids Step IV running
S A Griffiths CM42 June 2015 Electrical & Control.
Project Managers Report CM38 – Napa Roy Preece 24th February 2014.
Resource Loaded Schedule and Budget Profile
MICE CM28 Engineering Session Summary (On behalf of Wing)
Status of the MICE Construction Project
Spectrometer Solenoid Update
MICE CM31 Schedule summary
Presentation transcript:

Global Magnet Systems including Field Mapping MICE Project Board 28 th June 2011 M Courthold – RAL R Preece - RAL

MICE Project Board 28 th June 2011 Global Magnet Systems – definitions and responsibilities –Top level integration of all MICE magnet sub systems into a complete Cooling Channel - hardware, software, and interlocks –Global consideration of delivery, integration and commissioning schedules and resulting logistical issues –Provide a conduit for dialog between individual sub system owners, infrastructure providers, and control system providers –Keep a watchful eye on overall Cooling Channel integration, to identify deficiencies, oversights, and impending issues 2

MICE Project Board 28 th June 2011 Sub System Responsibility Table –The first task in coordinating the Global Magnet Systems is to produce a Sub System Responsibility Table –This was discussed in detail in the Controls presentation –NB: MICE Global Magnet systems and Control systems are closely related, so responsibility tables can be combined into a single document –The same table structure can be used to record: –Responsibilities –Timescales –Priority –for the following categories: –Software –Hardware –Interlocks 3

MICE Project Board 28 th June 2011 Sub System Responsibility Table - Getting Started –Need to first identify the responsible person for each sub- system –Then identify the sub-system components that apply to each step –Next consider when magnets are due to be delivered within each step –Thus deduce what sub-systems and infrastructure will be needed for each of the magnets 4

MICE Project Board 28 th June 2011 Sub System Responsibility Table 5

MICE Project Board 28 th June 2011 General Issues and Considerations –The schedule is driven by the delivery of individual sub-systems –Common infrastructure items should be used where possible –For example: –Vacuum, water, and compressed air systems –Power supplies, including circuit-breakers, dump-resistors and diodes –Sensors – temperature, pressure, flow, level, etc. –Due to purchasing methods, and existing purchases, it might be expedient to divide common spares into UK/USA-managed sub-systems –Where does the responsibility of the Global Magnet System coordinators and sub-system owners begin/end? This needs to be clarified, to ensure that nothing is overlooked. –Space in the MICE Hall and MICE LCR is very tight, and must be carefully coordinated –Of special concern is the potential effect of magnetic fields on sub systems and their hardware –How many EPICS controls systems are required? – Mobile & dedicated 6

MICE Project Board 28 th June 2011 Field Mapping considerations –Where should field mapping be done? – at manufacturer or RAL? –What level of field mapping required before/after delivery? –If field mapping done at RAL, who accepts responsibility for failure to perform to specification? –AFC contract has this clearly defined. What about other sub systems? –Advantages of performing field mapping at RAL –Field mapping instrument kept in one fixed place, instead of travelling around the world –This might also aid delivering the Spectrometer Solenoids to RAL earlier, by: –bringing back the schedule, by not carrying out the mapping at Wang NMR –allowing the team at LBNL to concentrate on the second solenoid assembly –Disadvantages –Extra infrastructure requirements and supplies needed in R9 –Inability to do field mapping at full field in R9 – although field maps should scale, due to absence of yoke 7

MICE Project Board 28 th June 2011 Field Mapping Device Progress –Excellent progress has been made with the MICE Field Mapping Device: –It is fully funded –The mechanics are in construction. It will be tested for vibrations, etc. –Will be ready for mapping the AFC in the MICE Hall in October. Waiting for the dates! –Probes and data acquisition system are available –The team will interact with MICE for: –the exact measurement strategy (also stray fields in the hall) –data handling strategy (what to do with all these measurements) –The following images feature the special adaption for use with the smaller aperture of the AFC module 8

MICE Project Board 28 th June 2011 MICE Field Mapping Device 9

MICE Project Board 28 th June 2011 MICE Field Mapping Device 10

MICE Project Board 28 th June 2011 MICE Field Mapping Device 11

MICE Project Board 28 th June 2011 Risk Summary –Sub systems suffer damage during transportation to RAL –Need to identify ways to mitigate transport risks –Need to produce acceptance tests before/after delivery –Manpower restrictions/key staff availability –Sub system requirements incorrectly/inadequately defined, requiring corrective action at RAL –Infrastructure, mechanical envelope, installation issues (size, weight, etc.) –We already have examples of this with both the EMR and Coupling Coils: With modifications now needed for the south mezzanine, the hydrogen delivery systems, and the AFC modules. –Unexpected sub system interactions –Quench consequences and/or forces –Detrimental effect on field map of neighbouring magnets –Late arrival of dependent sub systems –Late arrival of control system software or hardware, infrastructure components, etc. 12

MICE Project Board 28 th June 2011 Risk Summary - cntd –Mobile EPICS control systems might not be available when required –Space in the MICE Hall and MICE LCR is very tight, and could potentially be exceeded in key areas –Of special concern is the potential effect of magnetic fields on sub systems and their hardware 13

MICE Project Board 28 th June 2011 Summary –The MICE Field Mapping Device is now complete, and ready for use –Work is well underway re Global Magnet Systems –Sub system owners have been identified –Responsibility tables are being populated –Issues and concerns are being identified and addressed –The outcomes will depend heavily upon cooperation between all involved parties within MICE –There is still much to do 14