The CNGS Operation and Perspectives l Edda Gschwendtner, CERN.

Slides:



Advertisements
Similar presentations
Accelerator Complex Status P. Collier. Linac2, Booster and PS Startup on-time, according to the schedule. Only minor problems Rapidly set-up the major.
Advertisements

20/01/09 OPERA general meeting Nagoya CNGS report.
Neutrinos from Stored Muons STORM Target Station Conceptual Design 15-April-2013 Kris Anderson Fermilab/Accelerator Division/Mechanical Support Department.
Summary of the Design Report and Next Steps Edda Gschwendtner for the CERN AWAKE Project Team Edda Gschwendtner, CERN1.
Now2008 Paola Sala for the CNGS SBWG CNGS status Paola Sala, INFN Milano on behalf of the CNGS Secondary beam working group.
January 23 rd, 2008 CNGS & OPERA status Yves Déclais 1 I) CNGS status radiation damage on electronics strip line repair II) OPERA issues Based on the work.
TARGET STATION INFRASTRUCTURE THE CNGS EXPERIENCE D. Autiero, I. Efthymiopoulos, A. Ferrari, E. Gschwendtner, A. Guglielmi, A. Pardons, P. Sala, H. Vincke,
ISS, 23 September 2005E. Gschwendtner, CERN1 Beam Instrumentation at CNGS 1. Introduction 2. Layout 3. Beam Instrumentation 4. Summary.
CNGS Operation Results 2008 Edda Gschwendtner AB/ATB on behalf of the CNGS team.
Performance and Operational Experience of the CNGS Facility Edda GSCHWENDTNER, Dario AUTIERO, Karel CORNELIS, Ilias EFTHYMIOPOULOS, Alfredo FERRARI, Alberto.
Results and Lessons from the Operation of Current Beams for Existing Neutrino Experiments Edda Gschwendtner, CERN.
A. Bay Beijing October Accelerators We want to study submicroscopic structure of particles. Spatial resolution of a probe ~de Broglie wavelength.
Status of the OPERA experiment Yoshiaki Nonoyama Nagoya Univ.
WIN’11 CERN Neutrinos to Gran Sasso: The CNGS Facility at CERN l Edda Gschwendtner, CERN WIN’11, Cape Town, South Africa, 31 st Jan – 5 th Feb 2011.
JHF2K neutrino beam line A. K. Ichikawa KEK 2002/7/2 Overview Primary Proton beamline Target Decay Volume Strategy to change peak energy.
Beam Instrumentations: Requirements for Proton and Electron Beams C. Bracco, E. Gschwendtner, B. Goddard, M. Meddahi, A. Petrenko, F. Velotti Acknowledgements:
Radiation Protection lessons Experiences with operating beams for Neutrino experiments H. Vincke, CERN July 4, 20081Nufact’08, Valencia, Spain.
Fermilab Neutrino Beamline to DUSEL Mike Martens Fermilab PAC November 3, 2009.
Next generation of ν beams Challenges Ahead I. Efthymiopoulos - CERN LAGUNA Workshp Aussois, France, September 8,2010 what it takes to design and construct.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
CNGS ISSUES - THAT COULD DISTURB A SMOOTH OPERATION IN 2009 Thanks to colleagues who contributed to the slides: E. Gschwendtner, A. Pardons, H. Vincke,
Integration of the Experimental Facility in West Area & CNGS 1Ans Pardons, 18/10/2012 Integration of experimental facility in West Area and CNGS With input.
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
The CNGS Facility: Performance and Operational Experience Edda GSCHWENDTNER, Karel CORNELIS, Ilias EFTHYMIOPOULOS, Alfredo FERRARI, Ans PARDONS, Heinz.
Integration, Installation & Infrastructure Ans Pardons, with input from the WP4 members September 2014.
1 Status of Neutrino Beamline Construction K. Nishikawa IPNS, KEK 2006 . 12 . 4.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
CNGS PROJECT STATUS D.Autiero 21/5/2003 General status 2003 Project review CNGS upgrade.
6 April 2006E. Gschwendtner, CERN AB/ATB1 CNGS Project: Secondary Beam 1. Layout 2. Beam Instrumentation 3. Commissioning Plans for the Secondary Beam.
ATC/ABOC days, 24 January 2007Edda Gschwendtner1 CNGS : Status and Outlook Edda Gschwendtner, AB/ATB Summary of CNGS 2006 Reflector Repair OPERA Brick.
Overview of the KEK Neutrino Beam Facility and its Operation Summary after September 2000 FNAL) K.H. Tanaka for the KEK-PS Beam Channel Group.
F NuMI Beamline Accelerator Advisory Committee Presentation May 10, 2006 Mike Martens Fermilab Beams Division.
Beam line Experiment area SC magnet Pion production target
1 Target Station Design for Neutrino Superbeams Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory NBI 2012, CERN.
The CNGS Target Station By L.Bruno, S.Péraire, P.Sala SL/BT Targets & Dumps Section.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
NA61 11 October 2010Light Ion for NA61/ S. Maury1 Light Ion in SPS Foreseen to have primary Ar beam physics in 2012 Nothing runs in 2012 NA61 duty cycle.
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
CNGS Operation Summary Edda Gschwendtner, CERN. Outline Introduction CNGS Performance Highlights since last NBI 2010 in Japan Issues Summary 2E. Gschwendtner,
LER Workshop, October 11, 2006LER & Transfer Line Lattice Design - J.A. Johnstone1 LHC Accelerator Research Program bnl-fnal-lbnl-slac Introduction The.
6 April 2006Malika Meddahi 1 CNGS Project: primary beam 1.Project Overview 2. Proton beam line overview and status 3. Target status 4. Commissioning preparation.
Application of FLUKA to fixed- target programs at CERN: a short, not exhaustive selection M. Calviani (CERN) With contributions from: M. Brugger, F. Cerutti,
GRAN SASSO’S HADRON STOP Temperature’s behaviour under specified beam conditions Barbara Calcagno.
EUROnu Costing Workshop May 2011 Beta-Beam Costing Exercise Elena Wildner, CERN 25/05/11 1 EUROnu Costing Workshop, CERN May 2011.
T2K Status Report. The Accelerator Complex a Beamline Performance 3 First T2K run completed January to June x protons accumulated.
ATC-ABOPC Days 2008: Session 1 Summary ATC-ABOC days Summary Session; February Session coordinated by B. Mikulec AB-OP and O. Br ü ning AB-ABP Operation.
29 June 2006 CERN Neutrinos to Gran Sasso Seminar for CERN guides, by K. Elsener 1 CNGS - CERN Neutrinos to Gran Sasso > “Neutrinos” and “Gran Sasso” >
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
NBI2006 Starting OPERA data-taking with the CNGS beam D.Autiero IN2P3/IPN Lyon 5/9/2006.
NUMI NUMI/MINOS Status J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
1 NBI Rh. Jones (CERN - AB/BDI) CNGS Target Area Beam Position Monitors OUTLINE 1.Recap of Requirements & Layout 2.Monitor Candidates -Secondary.
CNGS: First Year of Operation E. Gschwendtner AB/ATB on behalf of the CNGS team.
CERN AWAKE Project Status. Outline Introduction Project organization West Area and CNGS AWAKE facility studies Required input from the Collaboration Summary.
2008 European School of High-Energy Physics - Trest, Czech Republic - 19 August - 1st September Target Tracker Data Analysis In OPERA Experiment S. Dmitrievsky,
MTE commissioning status S. Gilardoni, BE/ABP With C. Hernalsteens and M. Giovannozzi.
Feasibility Study of the AWAKE Facility at CERN Edda Gschwendtner, Chiara Bracco, Brennan Goddard, Malika Meddahi, Ans Pardons, Elena Shaposhnikova, Helga.
HB2008 – WG F: 27 Aug. S. Childress – Diagnostics_2MW 1 NuMI Beam Diagnostics and Control Steps to 2 MW S. Childress Fermilab.
Long-Baseline Neutrino Facility LBNF News and brief overview of Beamline plans for the next few months Vaia Papadimitriou Beamline Technical Board Meeting.
NuMI Flux, Leonidas Aliaga William & Mary July 25, 2012 Current Uncertainties And Future Plans International Workshop on Neutrino Factories, Super Beams.
J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting
The LHC - Status Is COLD Is almost fully commissioned
CNGS Run 2007: Radiation Issues
News and brief overview of Beamline plans for the next few months
M. Calviani, A. Ferrari (EN/STI), P. Sala (INFN)
Superbeams with SPL at CERN
CNGS Primary Beam Results 2010
CNGS - CERN Neutrinos to Gran Sasso
Use of Beam Loss Monitor type detectors in CNGS muon station
CNGS Project Overview Konrad Elsener.
Presentation transcript:

The CNGS Operation and Perspectives l Edda Gschwendtner, CERN

Outline Introduction CNGS Facility Performance and Operational Challenges Perspectives Summary NuFact’11, 1 – 6 August 2011, Geneva Edda Gschwendtner, CERN 2

 st LHC 5.3  protons to LHC 13.7  protons to CERN’s Non-LHC Experiments and Test Facilities North Area East Area AD nTOF CNGS ISOLDE Beam Facilities at CERN 2010 Edda Gschwendtner, CERN 3 4  pot NuFact’11, 1 – 6 August 2011, Geneva

Neutrino Introduction  CNGS (CERN Neutrinos to Gran Sasso): long base-line appearance experiment: Produce muon neutrino beam at CERN Measure tau neutrinos in Gran Sasso, Italy (732km) CERN Gran Sasso Edda Gschwendtner, CERN 4 produce muon-neutrinos measure tau-neutrinos CERN Gran Sasso 732km ~4·10 19 p/year ~2·10 19  /year ~2  /year ( ~1·10 17  /year) Approved for 22.5·10 19 protons on target i.e. 5 years with 4.5·10 19 pot/ yr (200 days/yr, intensity of 2.4·10 13 pot/extraction )  Expect ~10  events in OPERA Physics started in 2008  today: 12.7 ·10 19 pot NuFact’11, 1 – 6 August 2011, Geneva

 F. Pietropaolo, We, 9:50 Neutrino Detectors in Gran Sasso ICARUS 600 ton Liquid Argon TPC OPERA 1.2 kton emulsion target detector ~ lead emulsion bricks 5  A. Ereditato, Tue, 10:15 NuFact’11, 1 – 6 August 2011, Geneva Edda Gschwendtner, CERN

CNGS: Conventional method to produce neutrino beam p + C  (interactions)   , K +  (decay in flight)       Produce high energy pions and kaons to make neutrinos Edda Gschwendtner, CERN 6 NuFact’11, 1 – 6 August 2011, Geneva

Neu2012, Sept. 2010, CERN Edda Gschwendtner, CERN 7 CERN PS SPS LHC CNGS Lake Geneva CNGS Beam at CERN From SPS: 400 GeV/c Cycle length: 6 s 2 Extractions: separated by 50ms Pulse length: 10.5  s Beam intensity: 2x 2.4 · ppp Beam power: up to 500kW  ~0.5mm P osc *   cc (arbitrary units)  -fluence

Neu2012, Sept. 2010, CERN Edda Gschwendtner, CERN 8 target magnetic horns decay tunnel hadron absorber muon detector 1 muon detector 2

Edda Gschwendtner, CERN 9 CNGS Primary Beam Line 100m extraction together with LHC, 620m long arc to bend towards Gran Sasso, 120m long focusing section Magnet System: 73 MBG Dipoles –1.7 T nominal field at 400 GeV/c 20 Quadrupole Magnets –Nominal gradient 40 T/m 12 Corrector Magnets Beam Instrumentation: 23 Beam Position Monitors (Button Electrode BPMs) –recuperated from LEP –Last one is strip-line coupler pick-up operated in air –mechanically coupled to target 8 Beam profile monitors –Optical transition radiation monitors: 75  m carbon or 12  m titanium screens 2 Beam current transformers 18 Beam Loss monitors –SPS type N 2 filled ionization chambers NuFact’11, 1 – 6 August 2011, Geneva

43.4m 100m 1095m18m5m 67m 2.7m TBID 1 Target unit: 13 graphite rods 10cm 1 Magazine: 1 unit used, 4 in situ spares 994m long,  2.45m 1mbar vacuum 100kW 270cm 11.25cm Muon detectors: 2x41 LHC type BLMs Target chamber: 100m 2 HORNS: 7m long, 150/180kA pulsed Water cooled Remote polarity change 1.8mm inner conductor CNGS Secondary Beam Line Edda Gschwendtner, CERN 10 NuFact’11, 1 – 6 August 2011, Geneva

Edda Gschwendtner, CERN Commissioning Leak in the reflector cooling circuit, damaged stripline cable 2007 Beam commissioning with high intensity Radiation effects in ventilation system electronics 2008 Physics run Damaged target magazine rotation bearings 2009 Physics run MTE tests Tritium issue 2010 Physics run MTE tests Tritium issue CNGS Timeline until Today 11 Repairs & improvements in the horns Additional shielding Reconfiguration of service electronics Target inspection Civil engineering works for the drains & water evacuation Civil Engineering, Installation 2011 Physics run MTE tests Modification of ventilation system NuFact’11, 1 – 6 August 2011, Geneva

CNGS Physics Run: Comparison of Yearly Integrated Intensity 4.04E19 pot 2010 (218days): 3.52E19 pot 2009 (180 days) : 1.78E19 pot 2008 (133days) : Nominal (200days) : 4.5E19 pot/yr 2011 (27 July) : 3.2E19 pot/yr Edda Gschwendtner, CERN 12 NuFact’11, 1 – 6 August 2011, Geneva

Edda Gschwendtner, CERN 13 CNGS duty cycle: 100% CNGS duty cycle: 66% CNGS duty cycle: 24% Fixed Target 2xCNGSLHC Different CNGS Duty Cycles (2011) duty cycle for CNGS with LHC Operation and Fixed Target program duty cycle for CNGS with LHC Operation NuFact’11, 1 – 6 August 2011, Geneva

Examples:effect on ν τ cc event horn off axis by 6mm < 3% reflector off axis by 30mm < 3% proton beam on target < 3% off axis by 1mm CNGS facility misaligned< 3% by 0.5mrad (beam 360m off) CNGS Challenges and Design Criteria  Geodesic alignment High intensity, high energy proton beam with short beam pulses and small beam spot Thermomechanical shocks by energy deposition (target, windows, etc…) Induced radioactivity Remote handling and replacement of equipment  Good tuning and interlock system  Monitoring of beam and equipment NuFact’11, 1 – 6 August 2011, Geneva Edda Gschwendtner, CERN 14

Edda Gschwendtner, CERN 15 Beam Position on Target Excellent position stability; ~50 (80)  m horiz (vert) over entire run. No active position feedback is necessary –1-2 small steerings/week only Horizontal and vertical beam position on the last Beam Position Monitor in front of the target shielding horn target collimator BPM beam Vertical beam position [mm] Horizontal beam position [mm] RMS =54  m RMS =77  m Beam trajectory tolerance on target must be below 0.5mm NuFact’11, 1 – 6 August 2011, Geneva

CNGS Performance Monitoring shielding horn ionization chamber target TBID collimator BPM beam Intensity on TBID vs BPM BPM [mm] 14mm collimator opening 5mm target Intensity on Ionization Chambers vs BPM BPM [mm] 5mm target Edda Gschwendtner, CERN : ± ch/pot Central muon detector stability... Muon detector NuFact’11, 1 – 6 August 2011, Geneva

FermiLab, 20 October 2009 Edda Gschwendtner, CERN 17 ABMB, 14 Oct 2008 E. Gschwendtner, AB/ATB 17 target muon detectors pit 1 muon detectors pit 2

Muon Monitors: Online Feedback 270cm 11.25cm Muon Detector Very sensitive to any beam changes!  Online feedback on quality of neutrino beam –Offset of target vs horn at 0.1mm level Target table motorized Horn and reflector tables not Muon Profiles Pit 1 Muon Profiles Pit 2 –Offset of beam vs target at 0.05mm level Centroid = ∑ (Q i * d i ) / ∑ (Q i ) Q i is the number of charges/pot in the i-th detector, d i is the position of the i-th detector. Edda Gschwendtner, CERN 18 NuFact’11, 1 – 6 August 2011, Geneva

CNGS Radiation Issues I Failure in ventilation system installed in the CNGS Service gallery  due to radiation effects in electronics (SEU – Single Event Upsets- due to high energy hadron fluence) CNGS: no surface building above CNGS target area  large fraction of electronics in tunnel area target magnetic horns decay tunnel hadron absorber muon detector 1 muon detector 2 No surface building above CNGS target area  large fraction of electronics in tunnel area Failure in ventilation system installed in the CNGS Service gallery  due to radiation effects in electronics (SEU- Single Event Upsets- from high energy hadrons) ventilation units Edda Gschwendtner, CERN 19 Modifications during shutdown 07/08: –Move most of the electronics out of CNGS tunnel area –Create radiation safe area for electronics which needs to stay in CNGS –Add shielding  53m 3 concrete  up to 6m 3 thick shielding walls  triggered a huge radiation to electronics campaign at LHC!!! NuFact’11, 1 – 6 August 2011, Geneva

Edda Gschwendtner, CERN 20 Stop of ventilation Alarm in CCC horn target collimator beam Helium tube Temperature probes shielding Temperature probes reacted immediately on failure of the ventilation system  Alarm in CERN Control Centre  Switch off beam CNGS Radiation Issues II NuFact’11, 1 – 6 August 2011, Geneva

21 CNGS Radiation Issues III Sump and Ventilation System After 1 st year of high intensity CNGS physics run: Modification needed for Sump system in the CNGS area  avoid contamination of the drain water by tritium produced in the target chamber –Try to remove drain water before reaches the target areas and gets in contact with the air –Construction of two new sumps and piping work Ventilation system configuration and operation –Keep target chamber under under-pressure with respect to all other areas –Do not propagate the tritiated air into other areas and being in contact with the drain water Add 2 new small sumps (1m 3 )  pump out water immediately Target chamber Edda Gschwendtner, CERN  Radiation monitors NuFact’11, 1 – 6 August 2011, Geneva

2011, 2012: 4.7E19 pot 2013: 0 pot 2014: 2.3E19 pot 2015: 4.7E19 pot  Physics program would finish in 2015  By end 2012 we would have reached ~19E19 pot Approved for 22.5 ·10 19 protons on target i.e. 5 years with 4.5·10 19 pot/ year  Expect ~ 10  events in OPERA 22.5E19 pot LS1 CNGS – Perspectives Edda Gschwendtner, CERN 22 NuFact’11, 1 – 6 August 2011, Geneva

CNGS Facility: Intensity Limitations Intensity per PS batch # PS batches Int. per SPS cycle 200 days, 100% efficiency, no sharing 200 days, 55% efficiency, no sharing 200 days, 55% efficiency, 60% CNGS sharing [prot./6s cycle][pot/year] 2.4× Nominal CNGS24.8× × × × × Ultimate CNGS27.0×10 13 (2.02×10 20 )(1.11×10 20 )(6.65×10 19 ) Design limit for target, horn, kicker, instrumentation CNGS working hypothesis Working hypothesis for RP calculations Design limit for horn, shielding, decay tube, hadron stop  Design of secondary beam line elements, RP calculations  (Horn designed for 2E7 pulses, today we have 1.5E7 pulses  spare horn)  Intensity upgrade from the injectors are being now evaluated within the LHC Injector Upgrade Project (LIU) Edda Gschwendtner, CERN 23 NuFact’11, 1 – 6 August 2011, Geneva

Summary Beam performance since start of physics run in 2008 CNGS is very good –Today we have already delivered more than half of the approved total protons on target. –Looking forward to seeing more tau-neutrinos CNGS program beyond 2013 not yet approved –Statement from OPERA in summer 2012 Operating and maintaining a high-intensity facility is very challenging –Possibility for early repair must exist –Consider radiation effects on nearby electronics –Intervention on equipment ‘impossible’ after long operation  Remote handling, replacement –Ventilation system is a key item Temperature and humidity control Radioactive air management –H-3 creation in air and water is an issue –Keep redundancy of monitoring – Beam-line instrumentation is crucial Edda Gschwendtner, CERN 24 NuFact’11, 1 – 6 August 2011, Geneva

Additional Slides NuFact’11, 1 – 6 August 2011, Geneva Edda Gschwendtner, CERN 25

E19 pot E19 pot 2008 (108 days) 1.78E19 pot 2009 (151 days) 3.52E19 pot 2010 (192 days) 4.04E19 pot Physics run Beam commissioning Finishing OPERA 2011 today 3.2E19 pot Total today: 12.7.E19 pot (Approved for 22.5E19 pot) Start-up Issues Total Integrated Intensity since CNGS Start 2006 Edda Gschwendtner, CERN 26 NuFact’11, 1 – 6 August 2011, Geneva