Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Statistical Process Control Operations Management - 5 th Edition.

Slides:



Advertisements
Similar presentations
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Statistical Process Control Operations Management - 5 th Edition.
Advertisements

Quality Assurance (Quality Control)
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 15 Statistical Quality Control.
1 DSCI 3123 Statistical Process Control Take periodic samples from a process Plot the sample points on a control chart Determine if the process is within.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Statistical Process Control Operations Management - 5 th Edition.
BMM 3633 Industrial Engineering
Statistical Process Control Operations Management - 5 th Edition Chapter 4 Roberta Russell & Bernard W. Taylor, III.
2000 by Prentice-Hall, Inc1 Statistical Process Control Take periodic samples from processTake periodic samples from process Plot sample points on control.
Statistical Process Control. 4-2 Lecture Outline  Basics of Statistical Process Control  Control Charts  Control Charts for Attributes  Control Charts.
Copyright 2009 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Statistical Process Control Operations Management - 6 th Edition.
Statistical Process Control
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Operations Management - 5 th Edition Chapter 2 Supplement Roberta.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Operations Management - 5 th Edition Chapter 4 Supplement Roberta.
Acceptance Sampling Chapter 3 Supplement © 2014 John Wiley & Sons, Inc. - Russell and Taylor 8e.
Chapter 10 Quality Control McGraw-Hill/Irwin
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Statistical Process Control Operations Management - 5 th Edition.
Statistical Process Control 1 Chapter 3. Lecture Outline Basics of Statistical Process Control Control Charts Control Charts for Attributes Control Charts.
Operations Management
10 Quality Control CHAPTER
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Statistical Process Control OPIM.
Copyright 2009 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Statistical Process Control Operations Management - 6 th Edition.
OPERATIONS MANAGEMENT for MBAs Fourth Edition
PROCESS CAPABILITY AND STATISTICAL PROCESS CONTROL OPERATION/PRODUCTION MANAGEMENT Group III.
Chapter 201 Statistical Techniques for Achieving Quality Chapter 20 Achieving Quality Through Continual Improvement Claude W. Burrill / Johannes Ledolter.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Statistical Process Control Operations Management - 6 th Edition.
10-1 McGraw-Hill Ryerson Operations Management, 2 nd Canadian Edition, by Stevenson & Hojati Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights.
Quality Control.
10-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
10-1Quality Control William J. Stevenson Operations Management 8 th edition.
IES 303 Engineering Management & Cost Analysis | Dr. Karndee Prichanont, SIIT 1 IES 303 Chapter 5: Process Performance and Quality Objectives: Understand.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Waiting Line Analysis for Service Improvement Operations Management.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Operations Management - 5 th Edition Chapter 8 Supplement Roberta.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Products and Services Operations Management - 5 th Edition Chapter.
Operations and Supply Chain Management, 8th Edition
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. 1 Chapter 7 Six Sigma Quality and.
7 - 1 Chapter 7: Data Analysis for Modeling PowerPoint Slides Prepared By: Alan Olinsky Bryant University Management Science: The Art of Modeling with.
Business Processes Sales Order Management Aggregate Planning Master Scheduling Production Activity Control Quality Control Distribution Mngt. © 2001 Victor.
Chapter 7 Statistical Quality Control. Quality Control Approaches l Statistical process control (SPC) Monitors the production process to prevent poor.
Chapter 111 Information Technology For Management 6 th Edition Turban, Leidner, McLean, Wetherbe Lecture Slides by L. Beaubien, Providence College John.
Copyright © 2000 John Wiley & Sons, Inc. All rights reserved
Reid & Sanders, Operations Management © Wiley 2002 Statistical Quality Control 6 C H A P T E R.
Managing Quality CHAPTER SIX McGraw-Hill/Irwin Statistical Process control.
Statistical Process Control
Copyright 2009, John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Statistical Process Control Operations Management - 5 th Edition.
Statistical Quality Control
Statistical Process Control Chapter 4. Chapter Outline Foundations of quality control Product launch and quality control activities Quality measures and.
MGS8020 Measure.ppt/Mar 26, 2015/Page 1 Georgia State University - Confidential MGS 8020 Business Intelligence Measure Mar 26, 2015.
Introduction to Drafting and Design
Quality Control  Statistical Process Control (SPC)
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Operations Management - 5 th Edition Chapter 10 Supplement Roberta.
Modul ke: Fakultas Program Studi STATISTICAL PROCESS CONTROL What is statistical quality control? Sources of variation, descriptive statistics Statistical.
Quality Control Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
A- 1. A- 2 Appendix B Standards of Ethical Conduct for Management Accountants The Institute of Management Accountants has published and promoted the following.
K-1. K-2 Appendix K Standards of Ethical Conduct for Management Accountants The Institute of Management Accountants has published and promoted the following.
MOS 3330 Operations Management Professor Burjaw Fall/Winter
Operational Decision-Making Tools: Simulation
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Operations Management - 5 th Edition Chapter 12 Supplement Roberta.
Beni Asllani University of Tennessee at Chattanooga
Beni Asllani University of Tennessee at Chattanooga
Statistical Process Control
Statistical Process Control (SPC)
Statistical Process Control
Beni Asllani University of Tennessee at Chattanooga
Statistical Process Control
Transportation and Transshipment Models
Statistical Process Control
OPERATIONS MANAGEMENT: Creating Value Along the Supply Chain,
Supply Chain Management Strategy and Design
Statistical Quality Control
Presentation transcript:

Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Statistical Process Control Operations Management - 5 th Edition Chapter 4 Roberta Russell & Bernard W. Taylor, III

Copyright 2006 John Wiley & Sons, Inc.4-2 Lecture Outline  Basics of Statistical Process Control  Control Charts  Control Charts for Attributes  SPC with Excel

Copyright 2006 John Wiley & Sons, Inc.4-3 Basics of Statistical Process Control  Statistical Process Control (SPC) monitoring production process to detect and prevent poor quality monitoring production process to detect and prevent poor quality  Sample subset of items produced to use for inspection subset of items produced to use for inspection  Control Charts process is within statistical control limits process is within statistical control limits UCL LCL

Copyright 2006 John Wiley & Sons, Inc.4-4 Variability  Random common causes common causes inherent in a process inherent in a process can be eliminated only through improvements in the system can be eliminated only through improvements in the system  Non-Random special causes special causes due to identifiable factors due to identifiable factors can be modified through operator or management action can be modified through operator or management action

Copyright 2006 John Wiley & Sons, Inc.4-5 SPC in TQM  SPC tool for identifying problems and make improvements tool for identifying problems and make improvements contributes to the TQM goal of continuous improvements contributes to the TQM goal of continuous improvements

Copyright 2006 John Wiley & Sons, Inc.4-6 Quality Measures  Attribute a product characteristic that can be evaluated with a discrete response a product characteristic that can be evaluated with a discrete response good – bad; yes - no good – bad; yes - no  Variable a product characteristic that is continuous and can be measured a product characteristic that is continuous and can be measured weight - length weight - length

Copyright 2006 John Wiley & Sons, Inc.4-7  Nature of defect is different in services  Service defect is a failure to meet customer requirements  Monitor times, customer satisfaction Applying SPC to Service

Copyright 2006 John Wiley & Sons, Inc.4-8 Applying SPC to Service (cont.)  Hospitals timeliness and quickness of care, staff responses to requests, accuracy of lab tests, cleanliness, courtesy, accuracy of paperwork, speed of admittance and checkouts timeliness and quickness of care, staff responses to requests, accuracy of lab tests, cleanliness, courtesy, accuracy of paperwork, speed of admittance and checkouts  Grocery Stores waiting time to check out, frequency of out-of-stock items, quality of food items, cleanliness, customer complaints, checkout register errors waiting time to check out, frequency of out-of-stock items, quality of food items, cleanliness, customer complaints, checkout register errors  Airlines flight delays, lost luggage and luggage handling, waiting time at ticket counters and check-in, agent and flight attendant courtesy, accurate flight information, passenger cabin cleanliness and maintenance flight delays, lost luggage and luggage handling, waiting time at ticket counters and check-in, agent and flight attendant courtesy, accurate flight information, passenger cabin cleanliness and maintenance

Copyright 2006 John Wiley & Sons, Inc.4-9 Applying SPC to Service (cont.)  Fast-Food Restaurants waiting time for service, customer complaints, cleanliness, food quality, order accuracy, employee courtesy waiting time for service, customer complaints, cleanliness, food quality, order accuracy, employee courtesy  Catalogue-Order Companies order accuracy, operator knowledge and courtesy, packaging, delivery time, phone order waiting time order accuracy, operator knowledge and courtesy, packaging, delivery time, phone order waiting time  Insurance Companies billing accuracy, timeliness of claims processing, agent availability and response time billing accuracy, timeliness of claims processing, agent availability and response time

Copyright 2006 John Wiley & Sons, Inc.4-10 Where to Use Control Charts  Process has a tendency to go out of control  Process is particularly harmful and costly if it goes out of control  Examples at the beginning of a process because it is a waste of time and money to begin production process with bad supplies at the beginning of a process because it is a waste of time and money to begin production process with bad supplies before a costly or irreversible point, after which product is difficult to rework or correct before a costly or irreversible point, after which product is difficult to rework or correct before and after assembly or painting operations that might cover defects before and after assembly or painting operations that might cover defects before the outgoing final product or service is delivered before the outgoing final product or service is delivered

Copyright 2006 John Wiley & Sons, Inc.4-11 Control Charts  A graph that establishes control limits of a process  Control limits upper and lower bands of a control chart upper and lower bands of a control chart  Types of charts Attributes Attributes p-chart p-chart c-chart c-chart Variables Variables range (R-chart) range (R-chart) mean (x bar – chart) mean (x bar – chart)

Copyright 2006 John Wiley & Sons, Inc.4-12 Process Control Chart Sample number Uppercontrollimit Processaverage Lowercontrollimit Out of control

Copyright 2006 John Wiley & Sons, Inc.4-13 Normal Distribution  =0 1111 2222 3333 -1  -2  -3  95% 99.74%

Copyright 2006 John Wiley & Sons, Inc.4-14 A Process Is in Control If … 1.… no sample points outside limits 2.… most points near process average 3.… about equal number of points above and below centerline 4.… points appear randomly distributed

Copyright 2006 John Wiley & Sons, Inc.4-15 Control Charts for Attributes  p-charts  uses proportion defective in a sample  c-charts  uses number of defects in an item

Copyright 2006 John Wiley & Sons, Inc.4-16 p-Chart UCL = p + z  p LCL = p - z  p z=number of standard deviations from process average p=sample proportion defective; an estimate of process average  p = standard deviation of sample proportion p =p =p =p = p(1 - p) n

Copyright 2006 John Wiley & Sons, Inc.4-17 p-Chart Example 20 samples of 100 pairs of jeans NUMBER OFPROPORTION SAMPLEDEFECTIVESDEFECTIVE :::

Copyright 2006 John Wiley & Sons, Inc.4-18 p-Chart Example (cont.) UCL = p + z = p(1 - p) n 0.10( ) 100 UCL = LCL = LCL = p - z = p(1 - p) n 0.10( ) 100 = 200 / 20(100) = 0.10 total defectives total sample observations p =

Copyright 2006 John Wiley & Sons, Inc Proportion defective Sample number UCL = LCL = p = 0.10 p-Chart Example (cont.)

Copyright 2006 John Wiley & Sons, Inc.4-20 c-Chart UCL = c + z  c LCL = c - z  c where c = number of defects per sample  c = c

Copyright 2006 John Wiley & Sons, Inc.4-21 c-Chart (cont.) Number of defects in 15 sample rooms : : SAMPLE c = = UCL= c + z  c = = LCL= c + z  c = = 1.99 NUMBER OF DEFECTS

Copyright 2006 John Wiley & Sons, Inc Number of defects Sample number UCL = LCL = 1.99 c = c-Chart (cont.)

Copyright 2006 John Wiley & Sons, Inc.4-23 Control Chart Patterns UCL LCL Sample observations consistently above the center line LCL UCL Sample observations consistently below the center line

Copyright 2006 John Wiley & Sons, Inc.4-24 Control Chart Patterns (cont.) LCL UCL Sample observations consistently increasing UCL LCL Sample observations consistently decreasing

Copyright 2006 John Wiley & Sons, Inc.4-25 Zones for Pattern Tests UCL LCL Zone A Zone B Zone C Zone B Zone A Process average 3 sigma = x + A 2 R = 3 sigma = x - A 2 R = 2 sigma = x + (A 2 R) = sigma = x - (A 2 R) = sigma = x + (A 2 R) = sigma = x - (A 2 R) = 1313 x = Sample number |1|1 |2|2 |3|3 |4|4 |5|5 |6|6 |7|7 |8|8 |9|9 | 10 | 11 | 12 | 13

Copyright 2006 John Wiley & Sons, Inc.4-26 Control Chart Patterns  8 consecutive points on one side of the center line  8 consecutive points up or down across zones  14 points alternating up or down  2 out of 3 consecutive points in zone A but still inside the control limits  4 out of 5 consecutive points in zone A or B

Copyright 2006 John Wiley & Sons, Inc.4-27 Performing a Pattern Test 14.98B—B 25.00BUC 34.95BDA 44.96BDA 54.99BUC 65.01—UC 75.02AUC 85.05AUB 95.08AUA ADB SAMPLExABOVE/BELOWUP/DOWNZONE

Copyright 2006 John Wiley & Sons, Inc.4-28 Sample Size  Attribute charts require larger sample sizes  50 to 100 parts in a sample  Variable charts require smaller samples  2 to 10 parts in a sample

Copyright 2006 John Wiley & Sons, Inc.4-29 SPC with Excel UCL=0.19 LCL=0.01

Copyright 2006 John Wiley & Sons, Inc.4-30 SPC with Excel: Formulas

Copyright 2006 John Wiley & Sons, Inc.4-31 Copyright 2006 John Wiley & Sons, Inc. All rights reserved. Reproduction or translation of this work beyond that permitted in section 117 of the 1976 United States Copyright Act without express permission of the copyright owner is unlawful. Request for further information should be addressed to the Permission Department, John Wiley & Sons, Inc. The purchaser may make back-up copies for his/her own use only and not for distribution or resale. The Publisher assumes no responsibility for errors, omissions, or damages caused by the use of these programs or from the use of the information herein.