Philae Science team meeting Venezia, March 30, 31, April 1, 2009 Palazzo Cavalli Franchetti 1. Instrument status Final discussion and wrap-up.

Slides:



Advertisements
Similar presentations
ATMAN HB summary seminar # Challenges 2 ATMAN project 9/17/2010.
Advertisements

Course: e-Governance Project Lifecycle Day 1
Copyright Princeton University This work is the intellectual property of Princeton University. Permission is granted for this material to be shared.
Superior Solar Conjunction Planning May 8, 2014 Dan Ossing STEREO Mission Operations Manager (240)
SITOP power - uninterruptible 24 V Excellencein Automation&Drives: Siemens A&D SE PS 9/00 N o 1 A standard with variety current keeps right on flowing.
Philae Science Team Meeting Venice, 30 Mar. – 1 Apr Rita Schulz - Rosetta - Mission Status.
Envision SFA developing the next strategic plan….
PLATO Phase A/B1 Status TOU Meeting Catania 28 Feb 2011 PLAnetary Transits and Oscillation of stars.
PHEOS PSRR Concept of Operations. 2 Scope The purpose of the PCW-UVI Concept of Operations (ConOps) is to communicate how mission systems will operate,
Project Management: A Critical Skill for Organizations Presented by Hetty Baiz Project Office Princeton University.
Philae Science team meeting. Venezia, March 30, 31, April 1, 2009Palazzo Cavalli Franchetti.
DIRECT MEMORY ACCESS CS 147 Thursday July 5,2001 SEEMA RAI.
1 MAIS Student Administration Advisory Group Meeting #31 October 4, 2006.
4th Philae Science Workshop, Venice th Philae Science Workshop Venice, 30 March – 1 April ROMAP Status I. Apáthy, U. Auster, G. Berghofer, A.P.
Long Term Science working group status LSWT Venice, 30/03-01/04/2009.
Status Venice, 30-Mar-1-Apr 2009 Philae STW 2009.
ROLIS status and plans for SDL & FSS W. Bresch S. Mottola R. Schrödter PHILAE Science Team Meeting, Venezia, 31 March 2009.
Philae Science team meeting Venezia, March 30, 31, April 1, 2009 Palazzo Cavalli Franchetti 1. Criticality of SDL 2. Activity with Orbiter P/L ongoing.
Open Cruise Requirements status and planning LSWT#4, Venice 30/03-01/ LSWT#4.
PHILAE Science Team, Venice LTS phase: the LS standpoint prepared by HBO LTS phase: from end of FSS (mid Nov. 2014) to end of Rosetta mission (31.
Tuesday, March 31Philae Science team meeting Venice March 30 – April 1, 2009 APXS STATUS G. Klingelhöfer (PI) J. Gironés López J. Brückner (Co-I) R. Gellert.
Aerospace Engineering Department SD2: Status and On Comet Science P. Di Lizia, F. Malnati, P. Francesconi, A. Ercoli Finzi, F. Bernelli-Zazzera.
Philae Status and News Venezia; 30 st of March th Philae Post-Launch Workshop.
SDL: MOST point of view CNES / J-F Fronton / D Hallouard LSWT Venice, 30/03-01/04/2009.
GLAST LAT Project Analysis Meeting March 22, 2004 E. do Couto e Silva 1/8 LAT Instrument Test Analysis Eduardo do Couto e Silva March 23, 2004.
Ptolemy: A report, and future plans D. Andrews, S. Barber, G. Morgan, A. Morse, S. Sheridan, I. Wright, C. Pillinger Ptolemy is the result of a collaboration.
Senior Review Evaluations (1 of 5) Proposals due: 6 March 2015 Panel evaluations: Week of 22 April 2015 Performance factors to be evaluated will include.
The flight dynamics standpoint Alejandro Blazquez (CNES)‏ LSWT Venice, 30/03-01/04/2009.
Roadmap Name Strategic Roadmap #n Interim Report April 15, 2005.
Overview of Lean Six Sigma
RSOC System Testing Status - 1 RSOC System Test Concept –Covered in RO-EST-PL-5013 –Status to be presented at key system reviews (GSRR) Connectivity Tests.
1 Introduction to Software Engineering Lecture 1.
April , 2006 HEASARC Users Group Steve Drake RXTE Archive at HEASARC Status and Plans Steve Drake.
Critical Communications World, 21st-24th May © 3GPP 2012 © 3GPP 2013 LTE Standards for Public Safety – 3GPP view Balazs Bertenyi Chairman of 3GPP.
Solar Orbiter Mission (ESA) - The near-Sun phase  approach the Sun as close as 48 solar radii (~0.22 AU). At these distances, the angular speed of a spacecraft.
Project Manager’s Report Biscayne Bay Regional Restoration Coordination Team May 14, 2004.
MUPUS Operations Graz, 24/25-Oct 2013 MUPUS Team Meeting, Graz Oct 2013 G:\MUPUS\THC\PMMG.
SOWG # 6, 20/01/2015 ESAC Agenda  Finalization of the service 20 specifications  Test plans for the service20 at spacecraft level  Instruments.
GLAST Science Support CenterNovember, 2005 GSSC User Committee Meeting Tools for Mission and Observation Planning Robin Corbet, GSSC
Project Portfolio Management Business Priorities Presentation.
Status Graz, 24/25 Oct 2013 MUPUS Team Meeting. 2 LOWG#12, DLR Cologne 18-20th of November 2008 PEN inflight calibration 4  14 inflight calibration points.
1 Status Report on CJK NGN Working Group China Communications Standards Association 9 th CJK meeting April 2009 HeyuanXu, Chairman of NGN-WG.
PHILAE Science Team, Venice Philae On-Comet Science Objectives prepared by HBO Document name = Scientific Objectives of the PHILAE Mission (RO-LAN-LI-1000),
Chesapeake Bay TMDL 2017 Midpoint Assessment: A Critical Path Forward Lucinda Power EPA Chesapeake Bay Program Office Citizens Advisory Committee Meeting.
CIVA Status Venezia, Palazzo Cavalli Franchetti March 31, 2009 Philae Science Team Meeting.
GrocerSmart TM Energy Modeling Software -Revision Status Report- & -Request For Input- July 13, 2010.
PLANNING FOR FDT-WORK IN COMING MONTHS 3-mar-2014 Emmanuel VDS and Peter R. 1.
Status report on CJK NGN Working Group April 9, th CJK Standard Meeting Taesang Choi Chairman of CJK NGN Working Group.
SunSatFriThursWedTuesMon January
N. RadziwillEVLA Advisory Committee Meeting May 8-9, 2006 NRAO End to End (e2e) Operations Division Nicole M. Radziwill.
CSRP NASA Workshop NASA’s Revised Budget. CSRP NASA Workshop NASA’s New Vision and Objectives (as of January 14, 2004)  VISION  The fundamental goal.
Lectures 2 & 3: Software Process Models Neelam Gupta.
E-USOC operations in Increments José Miguel Ezquerro Navarro E-USOC/UPM Jul 2010POIWG#28 - Huntsville, AL.
Joint Research Centre the European Commission's in-house science service NON-EXHAUST PARTICLE EMISSIONS.
All The future of DC work. GEO DC workshop June Restructuring of DC and Detector Work for many reasons the DC work was not very efficient in the.
Rosetta Science Working Team Meeting #26 Working Group #1
RSOC Overview at SWT #26, 11/12 June 2009
Pre-landing Orbiter Observations
SESAME Status, Science goals and On-Comet Activities
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
OSIRIS Horst Uwe Keller and the OSIRIS Team
RLGS Status / LCC B. Pätz, DLR/MUSC.
Philae status 21st Rosetta Science Team meeting
VIRTIS Operations at Lutetia
SESAME: Status and On-Comet Science
SD2 Kevin Walsh 16 Feb, 2016.
Project Ideation Agile Down-to-Earth © 2016.
Agenda Purpose for Project Goals & Objectives Project Process & Status Common Themes Outcomes & Deliverables Next steps.
Community Wireless Mesh Networks
Presentation transcript:

Philae Science team meeting Venezia, March 30, 31, April 1, 2009 Palazzo Cavalli Franchetti 1. Instrument status Final discussion and wrap-up

Philae Science team meeting 1. Instrument status ● More than fair for all 10 investigations. Most science initial goals met. ● Unprecedented challenges (performance vs resources) overwent. ● All PCs were required to identify and fix issues. ● At P/L level, we are ready to operate at full capability and efficiency. ● Exemplary spirit of cooperation within the overall team. ● On behalf of all PI teams, utmost thanks to ESA, LCC and SONC.

Philae Science team meeting Venezia, March 30, 31, April 1, 2009 Palazzo Cavalli Franchetti 1. Instrument status 2. Upcoming activity: PC10 Final discussion and wrap-up

Philae Science team meeting 2. Upcoming activity: PC10 ● All requests from PI teams received and planned. ● If prioritization required, rationale could be: 1. COSAC (GC bypass to MS only) 2. MUPUS and SESAME: completion of calibration 3. all others, at equal level, with similar resource sharing

Philae Science team meeting Venezia, March 30, 31, April 1, 2009 Palazzo Cavalli Franchetti 1. Instrument status 2. Upcoming activity: PC10 3. Upcoming activity: ESB3 Final discussion and wrap-up

Philae Science team meeting 3. Upcoming activity: ESB3 ● All PI teams endorsed the proposal not to participate, to save resources (LCC/SONC) on more critical activity.

Philae Science team meeting Venezia, March 30, 31, April 1, 2009 Palazzo Cavalli Franchetti 1. Instrument status 2. Upcoming activity: PC10 3. Upcoming activity: ESB3 4. Upcoming activity: PC12 Final discussion and wrap-up

Philae Science team meeting 4. Upcoming activity: PC12 ● The focus is on CDMS SW 8.0 upload ● This SW should include all modes/sequences complying with SDL, FSS and LTS, as designed from present reference mission scenario. ● Major inputs from Project/PIs are due no later than April 30, 2009 ● The next SDL/LTS workshop meetings (April 27/28) critical. ● Herebelow are proposed some driving principles.

Suggested SDL principles Goal: simplify CDMS SW towards increased robustness 1. Automated emergency release if nominal release fails (time out) 2. Single descent sequence (no dependent on nominal/emergency) 3. Single TouchDown (TD) signal used (the less sensitive LG trigger) 4. Reception of TD signal disabled for a mission analysis driven duration 5. Anchoring sequence based on TD signal (no time out trigger) 6. FSS start triggered by TD signal or timeout (emergency release based) 7. ROLIS start at a mission analysis based time 8. ROLIS stop triggered by TC at a mission analysis based time

Suggested SDL principles Goal: simplify CDMS SW towards increased robustness 1. Automated emergency release if nominal release fails (time out) 2. Single descent sequence (no dependent on nominal/emergency) 3. Single TouchDown (TD) signal used (the less sensitive LG trigger) 4. Reception of TD signal disabled for a mission analysis driven duration 5. Anchoring sequence based on TD signal (no time out trigger) 6. FSS start triggered by TD signal or timeout (emergency release based) 7. ROLIS start at a mission analysis based time 8. ROLIS stop triggered by TC at a mission analysis based time

nominal releaseemergency release TD

Suggested SDL principles Goal: simplify CDMS SW towards increased robustness 1. Automated emergency release if nominal release fails (time out) 2. Single descent sequence (no dependent on nominal/emergency) 3. Single TouchDown (TD) signal used (the less sensitive LG trigger) 4. Reception of TD signal disabled for a mission analysis driven duration 5. Anchoring sequence based on TD signal (no time out trigger) 6. FSS start triggered by TD signal or timeout (emergency release based) 7. ROLIS start at a mission analysis based time 8. ROLIS stop triggered by TC at a mission analysis based time

TD signal reception disabled nominal releaseemergency release TD signal

Suggested SDL principles Goal: simplify CDMS SW towards increased robustness 1. Automated emergency release if nominal release fails (time out) 2. Single descent sequence (no dependent on nominal/emergency) 3. Single TouchDown (TD) signal used (the less sensitive LG trigger) 4. Reception of TD signal disabled for a mission analysis driven duration 5. Anchoring sequence based on TD signal (no time out trigger) 6. FSS start triggered by TD signal or timeout (emergency release based) 7. ROLIS start at a mission analysis based time 8. ROLIS stop triggered by TC at a mission analysis based time

Suggested SDL principles Goal: simplify CDMS SW towards increased robustness 1. Automated emergency release if nominal release fails (time out) 2. Single descent sequence (no dependent on nominal/emergency) 3. Single TouchDown (TD) signal used (the less sensitive LG trigger) 4. Reception of TD signal disabled for a mission analysis driven duration 5. Anchoring sequence based on TD signal (no time out trigger) assumption: if hard surface, TD signal generated, followed by anchoring if soft surface and TD not generated, anchoring not required

TD signal reception disabled nominal releaseemergency release TD signal anchoring after TD signal

Suggested SDL principles Goal: simplify CDMS SW towards increased robustness 1. Automated emergency release if nominal release fails (time out) 2. Single descent sequence (no dependent on nominal/emergency) 3. Single TouchDown (TD) signal used (the less sensitive LG trigger) 4. Reception of TD signal disabled for a mission analysis driven duration 5. Anchoring sequence based on TD signal (no time out trigger) 6. FSS start triggered by TD signal or timeout (emergency release based) 7. ROLIS start at a mission analysis based time 8. ROLIS stop triggered by TC at a mission analysis based time

FSS starts (from TD signal) TD signal reception disabled nominal releaseemergency release TD signal FSS starts (from TD signal)

FSS starts (from time out) TD signal reception disabled nominal releaseemergency release

Suggested SDL principles Goal: simplify CDMS SW towards increased robustness 1. Automated emergency release if nominal release fails (time out) 2. Single descent sequence (no dependent on nominal/emergency) 3. Single TouchDown (TD) signal used (the less sensitive LG trigger) 4. Reception of TD signal disabled for a mission analysis driven duration 5. Anchoring sequence based on TD signal (no time out trigger) 6. FSS start triggered by TD signal or timeout (emergency release based) 7. ROLIS start triggered by TC at a mission analysis based time 8. ROLIS stop triggered by TC at a mission analysis based time

ROLIS starts (from MA timing) ROLIS stops (from TC) TD signal reception disabled nominal releaseemergency release

Suggested SDL principles Goal: simplify CDMS SW towards increased robustness 1. Automated emergency release if nominal release fails (time out) 2. Single descent sequence (no dependent on nominal/emergency) 3. Single TouchDown (TD) signal used (the less sensitive LG trigger) 4. Reception of TD signal disabled for a mission analysis driven duration 5. Anchoring sequence based on TD signal (no time out trigger) 6. FSS start triggered by TD signal or timeout (emergency release based) 7. ROLIS start triggered by TC at a mission analysis based time 8. ROLIS stop triggered by TC at a mission analysis based time 9. P/L prioritization: two tests cases (A+B, A+B+C). Actual priority later on.

Suggested LTS principles Goal: enabling Philae survival post FSS to enter LTS ASAP 1. Load is on CDMS S/W (8.0): we must minimize it 2. End the FSS in an optimized Philae orientation. Goal: 3. Rotate after deep sample analyses, before PEN and APXS deployments 4. Power battery managing focused on survival (no science) 5. Priority: enable communicating with Philae (TC reception) 6. LTS first phase (pre-conjunction) key to monitor activity onset 7. Mean free path might lead to lethal dust coverage 8. Priority be made on MUPUS & SESAME (no sample connected activity) 9. Envision SD2/COSAC/PTOLEMY/CIVA-M post conjunction only 10. Imaging (CIVA) depending on resources & upload constraints

Philae Science team meeting Venezia, March 30, 31, April 1, 2009 Palazzo Cavalli Franchetti 1. Instrument status 2. Upcoming activity: PC10 3. Upcoming activity: ESB3 4. Upcoming activity: PC12 5. Upcoming activity: Lutetia Final discussion and wrap-up

Philae Science team meeting 5. Upcoming activity: Lutetia ● Envisioned activity similar to that of Steins ● PTOLEMY (and CIVA, if orientation OK) possibly added ● Study the outgassing while illuminated (ROMAP + ROSINA)

Philae Science team meeting Venezia, March 30, 31, April 1, 2009 Palazzo Cavalli Franchetti 1. Instrument status 2. Upcoming activity: PC10 3. Upcoming activity: ESB3 4. Upcoming activity: PC12 5. Upcoming activity: Lutetia 6. Next meetings: LOWG, 5thSWT Final discussion and wrap-up

Philae Science team meeting 6. Next meetings: LOWG, 5thSWT ● LOWG: prior to PC12 (January 2010 typically, TBC) ● 5th SWT: post PC12 (June typically, TBC), at PTOLEMY premises

Philae Science team meeting Venezia, March 30, 31, April 1, 2009 Palazzo Cavalli Franchetti 1. Instrument status 2. Upcoming activity: PC10 3. Upcoming activity: ESB3 4. Upcoming activity: PC12 5. Upcoming activity: Lutetia 6. Next meetings: LOWG, 5thSWT 7. Mille gracie, Amalia Final discussion and wrap-up