ROOF CONSTRUCTION Meeting 9 Study Program: S0673 / Building Construction II Period: 2007.

Slides:



Advertisements
Similar presentations
BUILDING CONSTRUCTION
Advertisements

Total house building CO 2 emissions Design of a house civil/structural systems wall areas room volumes wall materials foundations framework access roads.
Portal Framed Construction
Reinforced Concrete QTO Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
PICTURE IRON AND RESTATING Meeting 13 Study Program: S0673 / Building Construction II Period: 2007.
Roofing.
Framing Agriculture Structures
Ma.Carlota Fermín Jorge Matheus
LIGHT STEEL FRAME Meeting 11 Study Program: S0673 / Building Construction II Period: 2007.
ANTECEDENT Meeting 1 Study Program: S0673 / Building Construction II Period: 2007.
Lecture Goals Slab design reinforcement.
CEA UNIT 3 TERMS & DEFINITIONS. BEAM A structural member, usually horizontal, that carries a load that is applied transverse to its length.
CONCRETE STAIRS Meeting 6 Study Program: S0673 / Building Construction II Period: 2007.
© 2006 ITT Educational Services Inc. CD230 Architectural Design & Drafting: Unit 8 Slide 1 Unit 8 Fireplace and Stair Details.
PowerPoint Presentation
1 Presentation 25 CONSTRUCTION MATERIAL. 2 Learning Outcomes By the end of this meeting, students will be expected to be able to : Students can explain.
Winnie Mbiyu & Christopher Mavuti
1 Presentation 5 NOTATION CONSTRUCTION MATERIAL IN A PICTURE.
PILING FOUNDATION Meeting 3 Study Program: S0673/Building Construction II Period: 2007.
IRON AND STEEL CORROSION PERTEMUAN 11 Matakuliah: S0372 – Kimia Teknik Sipil Tahun: Ganjil 2007/2008.
FLOOR Meeting 7 Study Program: S0673 / Building Construction II Period: 2007.
KINDS OF METAL CORROSION PERTEMUAN 10 Matakuliah: S0372 – Kimia Teknik Sipil Tahun: Ganjil 2007/2008.
CONSTRUCTION.
WOOD STAIRS Meeting 5 Study Program: S0673 / Building Construction Period: 2007.
Stairs Meeting 4 Study Program: S0673 / Building Construction II Year: 2007.
FOUNDATION Meeting 2 Study Program: S0673 / Building Construction II Period: 2007.
ROOF of WOOD CONSTRUCTION Meeting 10 Study Program: S0673 / Building Construction II Period: 2007.
1 Presentation 23 WINDOW AND DOOR. 2 Learning Outcomes By the end of this meeting, student will expected to be able to : Student can explain building.
FLOOR CONSTRUCTION Meeting 8 Study Program: S0673 / Building Construction II Period: 2007.
1 Presentation 15 WOOD UPON WHICH BUILDING. 2 Learning Outcomes By the end of this meeting, student will expected to be able to : Student earn building.
Rectangular framed structures
Chapter 19 Floors.
BEAMS,COLUMS AND LINTELS
Roof Types, Components & Terminology
Exterior Wall (Masonry)
Windows Do not open or close all windows and doors at the same time. Optimise the ventilation by experimenting with opening different windows instead.
REINFORCED CONCRETE AND IRON RESTATING. Meeting 12 Study Program: S0673 / Building Construction II Year: 2007.
Construction Framing Mr. Brock. Lumber 2x4s are not actually 2” by 4”
Building Superstructures Construction Mr. O’Rourke.
FORMS, SCAFFOLDING and STAGING
Supervisor: Dr. Mahmoud Dweikat.. Outline: 1. Introduction. 2. Static design 3. dynamic design 4. Conclusion.
EDT Elevations1 Weekend Cabin Retreat Project Elevations Sacramento City College EDT 300/ENGR 306.
+ Sill and Floor Construction Vocabulary. + Anchor Bolt A threaded rod inserted in masonry construction to anchor the sill plate to the foundation.
Greenhouse Types. Types of Greenhouses Detached – Quonset – Gothic Frame – Even Span – A Frame Attached – Lean to – Even span.
Unit A3-9 Framing Agriculture Structures Problem Area 3 Construction Systems.
Building Fun You will have 30 minutes to build the strongest structures you can with only the materials you are provided with. Explain to the class the.
EDT Cabin Design Project - Elevations1 Weekend Cabin Retreat Project Elevations Sacramento City College EDT 300 Kenneth Fitzpatrick, P.E.
Fundamentals of Structural Detailing
BEAMS: Beams are structural members that can carry transverse loads which produce bending moments & shear force. Girders: Main load carrying members into.
Chapter 24 Chimneys and Fireplaces Copyright Goodheart-Willcox Co., Inc. May not be posted to a publicly accessible website. Explain how masonry chimneys.
Framed Structures Luisana Hernández.
APPLICATIONS OF TECHNOLOGY
Structure provides constructional support to an architectural piece. The main types of structure are: – Post-and-Lintel – __________________ – Bearing.
SCIENCE MATERIALS PERTEMUAN 04 Matakuliah: S0372 – Kimia Teknik Sipil Tahun: Ganjil 2007/2008.
Pitched Roof By PATEL ANKITKUMAR H.
Rutgers, The State University of New Jersey Climate Change and Agriculture in New Jersey Christopher C. Obropta, Ph.D., P.E. Extension Specialist in Water.
Technological And Engineering EXPLAINS ERECTION PROCEDURE OF TIMBER BENCH AND RAILING TIMBER.
Best House Siding Companies Toronto
Framing Vocabulary Stud: upright beams in the framework of a building
Framing Agriculture Structures
Identify the science building
CEN 180: Civil Engineering Drawing II
Framing Agriculture Structures
NFPA 600, INDUSTRIAL FIRE BRIGADE Module : 11 BUILDING CONSTRUCTION.
Things You Should Know About Cantilever Rack
•Connecting to the Foundation & Bearing
Structural Drawing Chapter 19.
Exploring Greenhouse Structures
Common Components of a Traditional Wood Framed Building
ROOFS.
Presentation transcript:

ROOF CONSTRUCTION Meeting 9 Study Program: S0673 / Building Construction II Period: 2007

Bina Nusantara By the end of this meeting, expected student will be able to : Student can explain construction cover of roof along with materials and condition cover of roof. Learning Outcome 3

Bina Nusantara Items 1: Construction roof general condition. Items 2: Kinds of truss form and detail its extension. Items 3: Kinds of roof form. Items 4: Types conclusion of roof. Outline Items : 4

Bina Nusantara  General Roof is part of building having double function : a. Protector of building from rain and heat. b. Adding the Beauty of building. Condition which must fulfill :  Construction have to be sturdy, strength and made from materials which hold up and not easy to destroy by influence of weather, hot and rain.  Have to be compatible with its building form so that can add the beauty of building. Roof Construction 5

Bina Nusantara 3.Inclination of roof bevel angle have to in such a manner so that easy water emit a stream of. 4.Can give freshmen to its dweller. Marginally roof construction divided to become two shares: 1. Truss construction 2. Roof cover 6

Bina Nusantara  Truss Construction To determine roof framework type, things which must be paid attention :  Long and wide size measure of building.  Usage of building ( Store, building, house, warehouse, sport building, etc )  Ichnograph room form.  Unfold and apart between truss.  Building location.  Type conclusion of its roof. 7

Bina Nusantara Truss Construction materials made of wood, steel and earn also made from formed reinforced concrete like roof frame. Before chosen materials there are some matter which need to be paid attention :  Truss made of wood :  Durability  Size measure limited  Easy wood moulder to be eaten by white ants. 8

Bina Nusantara  Truss made of steel :  Melt when fire happened.  Corrosion easily  Heavily compared to with wood.  Truss made of concrete :  Heavily  Have to be calculated correctly.  Usually do not in form of easel frame, but like log. 9

Bina Nusantara Kinds Roof Form : 1.Roof Saddle. 2.Roof Shield. 3.Roof Saw. 4.Roof of Joglo. 5.Roof Tend 6.Roof of Jengki, etc. 10

Bina Nusantara 11

Bina Nusantara 12

Bina Nusantara 13

Bina Nusantara 14

Bina Nusantara  Truss Part : a.Easel Foot Forming inclination of roof and as receiver all burden above him. As situating of it can be put down above column (wood/concrete) or brick wall. 15

Bina Nusantara b.Log Easel / Interesting Log. Caused by style of horizontal, hence easel feet will shift exit. Hence to avoid style of horizontal the attached a easel log or interesting log. 16

Bina Nusantara c.Log Hang / Middleman. Because unfolding wide easel, hence easel log will flex downwards, hence given by Hanging log. 17

Bina Nusantara d.Log Contributor (Skoor) Effect unfold easel progressively length, easel foot also more and more length. As a result also will flex and to avoiding it given contributor log or skoor. 18

Bina Nusantara e.Nipper log. functioning Nipper log so that easel construction not flex forwards or rear. 19

Bina Nusantara Progressively long unfold easel, its complicated construction progressively, meaning more and more contributor bars and bar its. When made easel of wood, hence dimension of each bar will become big and also will progressively heavily and inefficient again. So that in a moment unfold certain more efficient if made easel of steel or iron. 20

Bina Nusantara Example of convergent easel at concrete column or wall : 21

Bina Nusantara Example of easel converging above wood pole : 22